• DEFSTAN 02-703/1(2000) : 2000

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    THERMAL AND ACOUSTIC INSULATION OF HULL AND MACHINERY

    Available format(s): 

    Superseded date:  08-06-2011

    Language(s): 

    Published date:  12-01-2013

    Publisher:  UK Ministry of Defence Standards

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    TITLE PAGE
    SCOPE
    FOREWORD
    Sponsorship
    Conditions of Release
    General
    MOD Tender or Contract Process
    Related Documents
    Health and Safety
    Warning
    CONTENTS
    SECTION 1 - THERMAL INSULATION - GENERAL PRINCIPLES
    SECTION 2 - ACOUSTIC TREATMENT - GENERAL PRINCIPLES
                2.1 Acoustic Absorption Treatment
                2.2 Acoustic Insulation Treatment
                2.3 Application of Acoustic Absorption and
                    Insulation Treatment
    SECTION 3 - SELECTION OF CONTRACTORS FOR THE THERMAL AND
                ACOUSTIC INSULATION OF HULL AND MACHINERY
    SECTION 4 - THERMAL INSULATION STRUCTURE SURFACE SHIPS
                4.1 Areas to be Insulated
                4.2 Surface Preparation
                4.3 Insulation Type
                4.4 Insulation Thickness - External Structure
                4.5 Insulation Thickness - Internal Structure
                4.6 Insulation Procedures
                4.7 Insulation Finish
    SECTION 5 - ACOUSTIC TREATMENT STRUCTURE SURFACE SHIPS
                5.1 Surface Preparation
                5.2 Type of Treatment
                5.3 Thickness of Treatment
                5.4 Guidance Drawings
                5.5 Installation Procedures
                5.6 Treatment Finish
    SECTION 6 - THERMAL INSULATION STRUCTURE SUBMARINES
                6.1 Areas to be insulated
                6.2 Surface Preparation
                6.3 Insulation Type
                6.4 Insulation Thickness
                6.5 Insulation Procedures
                6.6 Insulation Finish
    SECTION 7 - FIRE BARRIER INSULATION
                7.1 Areas to be insulated
                7.2 Surface Preparation
                7.3 Insulation Type
                7.4 Insulation Thickness
                7.5 Insulation Procedure
                7.6 Insulation Finish
    SECTION 8 - THERMAL INSULATION VENTILATION TRUNKING SURFACE SHIPS
                8.1 Areas to be Insulated
                8.2 Surface Preparation
                8.3 Insulation Type
                8.4 Insulation Thickness
                8.5 Insulation Procedures
                8.6 F/R Cork Sheet Insulation
                8.7 MFMB Insulation
                8.8 Insulation Finish
    SECTION 9 - THERMAL INSULATION VENTILATION TRUNKING SUBMARINES
                9.1 Areas to be insulated
                9.2 Surface Preparation
                9.3 Insulation Type
                9.4 Insulation Procedures
                9.5 Insulation Finish
    SECTION 10 - ACOUSTIC TREATMENT VENTILATION TRUNKING SURFACE
                 SHIPS AND SUBMARINES
                 10.1 Areas to be treated
                 10.2 Surface Preparation
                 10.3 Type of treatment
                 10.4 Thickness of treatment
                 10.5 Installation Procedures
    SECTION 11 - THERMAL AND ACOUSTIC INSULATION OF VOICE PIPES
                 SURFACE SHIPS
                 11.1 Areas to be insulated
                 11.2 Surface Preparation
                 11.3 Insulation Type
                 11.4 Insulation Thickness
                 11.5 Insulation Procedures
                 11.6 Insulation Finish
    SECTION 12 - THERMAL INSULATION OF PIPING AT 80 DEGREES AND
                 BELOW SURFACE SHIPS AND SUBMARINES
                 12.1 Areas to be insulated
                 12.2 Surface Preparation
                 12.3 Insulation Type
                 12.4 Insulation Thickness
                 12.5 Insulation Procedures
                 12.6 Insulation Finish - Surface Ships
                 12.7 Insulation Finish - Submarines
                 12.8 Importance of an effective vapour barrier
    SECTION 13 - THERMAL INSULATION OF PIPING ABOVE 80
                 DEGREES C - SURFACE SHIPS AND SUBMARINES
                 13.1 Areas to be insulated
                 13.2 Surface Preparation
                 13.3 Insulation Type
                 13.4 Insulation Thickness
                 13.5 Reference Drawings
                 13.6 Insulation Procedures
                 13.7 Insulation Finish Surface Ships Only
                 13.8 Submarines
    SECTION 14 - MODULAR INSULATION (MODLAG) - SURFACE SHIPS AND SUBMARINES
                 14.1 Introduction
                 14.2 Areas to be insulated
                 14.3 Surface Preparation
                 14.4 Insulation Type
                 14.5 Insulation Thickness
                 14.6 Design, Manufacture and Identification of
                      MODLAGs
                 14.7 Insulation Procedures
                 14.8 Insulation Finish
    SECTION 15 - THERMAL INSULATION OF DRAINS FROM HOT
                 EQUIPMENT - SURFACE SHIPS AND SUBMARINES
                 15.1 Areas to be insulated
                 15.2 Surface Preparation
                 15.3 Insulation Type
                 15.4 Insulation Thickness
                 15.5 Reference Drawings
                 15.6 Insulation Procedures
                 15.7 Insulation Finish
                 15.8 SUBMARINES
    SECTION 16 - THERMAL INSULATION OF STEAM TURBINE CYLINDERS,
                 DRAIN COOLERS, HEAT EXCHANGERS, PUMPS - SURFACE
                 SHIPS AND SUBMARINES
                 16.1 Areas to be insulated
                 16.2 Surface Preparation
                 16.3 Insulation Type
                 16.4 Insulation Thickness
                 16.5 Reference Drawings
                 16.6 Insulation Procedures
                 16.7 Insulation Finish
                 16.8 SUBMARINES
    SECTION 17 - THERMAL INSULATION OF WT BOILERS AND BACK UP
                 INSULATION TO FURNACE LINING SURFACE SHIPS
                 17.1 Areas to be insulated
                 17.2 Surface Preparation
                 17.3 Insulation Type
                 17.4 Insulation Thickness
                 17.5 Insulation Procedures
                 17.6 Insulation Finish
    SECTION 18 - THERMAL INSULATION OF BOILER UPTAKES - SURFACE SHIPS
                 18.1 Areas to be insulated
                 18.2 Surface Preparation
                 18.3 Insulation Type
                 18.4 Insulation Thickness
                 18.5 Insulation Procedures
                 18.6 Finish to Insulation
    SECTION 19 - THERMAL INSULATION OF DIESEL ENGINE EXHAUST
                 SYSTEMS - SURFACE SHIPS AND SUBMARINES
                 19.1 Areas to be insulated
                 19.2 Surface Preparation
                 19.3 Insulation Type
                 19.4 Insulation Thickness
                 19.5 Reference Drawings
                 19.6 Insulation Procedures
                 19.7 Insulation Finish - excluding integral insulation
    SECTION 20 - THERMAL AND ACOUSTIC INSULATION OF GAS TURBINE
                 UPTAKES - SURFACE SHIPS
                 20.1 Areas to be insulated
                 20.2 Surface Preparation
                 20.3 Insulation Type
                 20.4 Insulation Thickness
                 20.5 Reference Drawings
                 20.6 Insulation Procedures
                 20.7 Insulation Finish
    ANNEX A - RELATED DOCUMENTS
    ANNEX B - DEFINITIONS AND ABBREVIATIONS
    ANNEX C - EXPLANATORY NOTES TO ANNEX

    Abstract - (Show below) - (Hide below)

    Applicable to the thermal, fire barrier and acoustic insulation of the structure and, where appropriate, the systems, ventilation trunking and machinery of HM Ships and Submarines.

    General Product Information - (Show below) - (Hide below)

    Development Note This is a redesignation of NES 703. (01/2001)
    Document Type Standard
    Publisher UK Ministry of Defence Standards
    Status Superseded
    Superseded By
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    DEFSTAN 02-319/3(2009) : 2009 REQUIREMENTS FOR AVIATION FUEL SYSTEMS IN HM SURFACE SHIPS
    DEFSTAN 02-718/1(2002) : 2002 REQUIREMENTS FOR SEWAGE PLANT AND ANCILLARY EQUIPMENT IN HM SURFACE SHIPS AND SUBMARINES
    DEFSTAN 02-330/2(2007) : 2007 REQUIREMENTS FOR MAIN PROPULSION PLANT CONDENSERS IN NUCLEAR POWERED SUBMARINES
    DEFSTAN 02-314/3(2005) : 2005 COMPRESSED AIR SYSTEMS
    DEFSTAN 02-123(PT1)/2(2002) : 2002 REQUIREMENT FOR LAUNDRIES AND ASSOCIATED COMPARTMENTS - PART 1: LAUNDRIES AND ASSOCIATED COMPARTMENTS
    DEFSTAN 02-106(PT1)/2(2010) : 2010 REQUIREMENTS FOR MEDICAL & DENTAL ORGANIZATION IN HM SURFACE SHIPS AND SUBMARINES - PART 1: COMMON REQUIREMENTS - MEDICAL & DENTAL FACILITIES
    DEFSTAN 00-101(PT2)/1(2005) : 2005 DESIGN STANDARDS FOR EXPLOSIVES SAFETY IN MOD SHIPS AND SUBMARINES - PART 2: SUBMARINES
    DEFSTAN 02-121(PT1)/3(2010) : 2010 REQUIREMENTS FOR GALLEYS AND ASSOCIATED SPACES - PART 1: COMMON REQUIREMENTS
    DEFSTAN 02-319/2(2002) : INTERIM REQUIREMENTS FOR AVIATION FUEL SYSTEMS IN HM SURFACE SHIPS
    DEFSTAN 02-320/3(2009) : 2009 REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF FUEL SYSTEMS FOR GAS TURBINE ENGINES AND DIESEL ENGINES IN HM SURFACE SHIPS AND SUBMARINES
    DEFSTAN 02-101(PT1)/2(2005) : 2005 REQUIREMENTS FOR DESIGN AND FITTING OUT OF WORKSHOPS MAINTENANCE SPACES AND ENGINEERING STORES FOR HM SURFACE SHIPS - PART 1: COMMON REQUIREMENTS
    DEFSTAN 02-120/2(2002) : INTERIM REQUIREMENTS FOR WATER CLOSETS, URINALS, BATHROOMS AND WASHING FACILITIES IN HM SURFACE SHIPS AND SUBMARINES
    DEFSTAN 02-102(PT1)/3(2005) : 2005 REQUIREMENTS FOR AIR-CONDITIONING AND VENTILATION - PART 1: HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES
    DEFSTAN 02-329/2(2005) : 2005 REQUIREMENTS FOR HEAT EXCHANGERS FOR HM SURFACE SHIPS AND SUBMARINES
    DEFSTAN 02-348/2(2008) : 2008 GUIDE TO THE DESIGN, CORROSION ASSESSMENT AND STRESS ANALYSIS OF STEAM SYSTEMS PIPEWORK
    DEFSTAN 02-802/1(2008) : 2008 REQUIREMENTS FOR MINERAL WOOL PRODUCTS FOR ACOUSTIC AND THERMAL INSULATION
    DEFSTAN 02-329/3(2010) : 2010 REQUIREMENTS FOR HEAT EXCHANGERS FOR HM SURFACE SHIPS AND SUBMARINES
    DEFSTAN 02-309/3(2007) : 2007 REQUIREMENTS FOR GAS TURBINES
    DEFSTAN 02-121(PT1)/2(2006) : 2006 REQUIREMENTS FOR GALLEYS AND ASSOCIATED SPACES - PART 1: COMMON REQUIREMENTS
    DEFSTAN 02-797(PT1)/3(2009) : 2009 PIPEWORK ENGINEERING - PART 1: GENERAL
    DEFSTAN 00-101(PT1)/1(2005) : 2005 DESIGN STANDARDS FOR EXPLOSIVES SAFETY IN MOD SHIPS AND SUBMARINES - PART 1: SURFACE SHIPS
    DEFSTAN 02-806/2(2010) : 2010 REQUIREMENTS FOR CERAMIC PRODUCTS FOR THERMAL INSULATION APPLICATIONS: CERAMIC ROPE AND CERAMIC BLANKET
    DEFSTAN 02-314/2(2001) : INTERIM COMPRESSED AIR SYSTEMS
    DEFSTAN 02-309/2(2002) : 2002 REQUIREMENTS FOR GAS TURBINES
    DEFSTAN 02-105(PT1)/3(2010) : 2010 REQUIREMENTS FOR FITTING OUT OF OFFICES (EXCLUDING OPERATIONAL/COMMUNICATION OFFICES) IN HM SURFACE SHIPS AND SUBMARINES - PART 1: GENERAL REQUIREMENTS
    DEFSTAN 02-805/1(2010) : 2010 REQUIREMENTS FOR VAPOUR BARRIER COATINGS AND PROPRIETARY FLEXIBLE MASTIC SEALERS FOR USE ON INSULATION MATERIALS
    DEFSTAN 02-803/1(2010) : 2010 REQUIREMENTS FOR POLYMER FOAMS FOR THERMAL INSULATION
    DEFSTAN 02-728/3(2010) : 2010 REQUIREMENTS FOR DOMESTIC HOT AND COLD FRESH WATER SYSTEMS
    DEFSTAN 02-320/2(2002) : INTERIM REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF FUEL SYSTEMS FOR GAS TURBINE ENGINES AND DIESEL ENGINES IN HM SURFACE SHIPS AND SUBMARINES
    DEFSTAN 02-804/1(2008) : 2008 REQUIREMENTS FOR CORK PRODUCTS FOR THERMAL INSULATION
    DEFSTAN 02-105(PT1)/2(2004) : 2004 REQUIREMENTS FOR FITTING OUT OF OFFICES (EXCLUDING OPERATIONAL/COMMUNICATION OFFICES) IN HM SURFACE SHIPS AND SUBMARINES - PART 1: GENERAL REQUIREMENTS
    DEFSTAN 02-350/2(2006) : 2006 GUIDANCE FOR THE PRE-TRIAL INSPECTIONS OF MAIN AND AUXILIARY MACHINERY INSTALLATIONS AND SYSTEMS IN HM SURFACE SHIPS
    DEFSTAN 02-125/2(2004) : 2004 REQUIREMENTS FOR NAAFI COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES
    DEFSTAN 02-800/1(2010) : 2010 REQUIREMENTS FOR CALCIUM SILICATE PRODUCTS FOR THERMAL INSULATIONS
    DEFSTAN 02-126(PT1)/3(2010) : 2010 REQUIREMENTS FOR STORES COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES - PART 1: GENERAL REQUIREMENTS
    DEFSTAN 02-801/1(2010) : 2010 REQUIREMENTS FOR GLASS FIBRE PRODUCTS FOR USE IN THERMAL INSULATION APPLICATIONS
    DEFSTAN 02-716/3(2007) : 2007 REQUIREMENTS FOR WINTERIZATION OF HM SURFACE SHIPS
    DEFSTAN 00-101(PT2)/2(2008) : 2008 DESIGN STANDARDS FOR EXPLOSIVES SAFETY IN MOD SHIPS AND SUBMARINES - PART 2: SUBMARINES
    DEFSTAN 02-782/2(2010) : 2010 REQUIREMENTS FOR ADHESIVE FOR MINERAL WOOL MARINE BOARD (MWMB)
    DEFSTAN 02-126(PT1)/2(2004) : 2004 REQUIREMENTS FOR STORES COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES - PART 1: GENERAL REQUIREMENTS
    DEFSTAN 02-716/2(2002) : 2002 REQUIREMENTS FOR WINTERIZATION ON HM SURFACE SHIPS

    Standards Referencing This Book - (Show below) - (Hide below)

    DEFSTAN 83-48/4(2003) : 2003 CLOTHS, PLAIN WEAVE, COTTON
    NES 119 PT1 : ISSUE 2 REQUIREMENTS FOR FIRE PROTECTION AND DAMAGE CONTROL FOR SURFACE SHIPS - PART 1: POLICY FOR SURFACE SHIPS
    NES 800 PT 2 : ISSUE 2 REQUIREMENTS FOR INSULATION MATERIAL CALCIUM SILICATE PRODUCTS - CALCIUM SILICATE PRODUCTS SILICATE FILLING COMPOUND
    TS 10194 : LATEST
    NES 119 PT3 : ISSUE 2 REQUIREMENTS FOR FIRE PROTECTION AND DAMAGE CONTROL FOR SURFACE SHIPS - PART 3: SURFACE SHIP AND SUBMARINE EQUIPMENT
    NES 706 : ISSUE 2 AMD 6 WELDING AND FABRICATION OF SHIP STRUCTURE
    DEFSTAN 80-78/2(1995) : 1995 PAINT, FINISHING, FLAME RETARDANT, BRUSHING
    DEFSTAN 81-25/3(1998) : 1998 TAPE, PRESSURE-SENSITIVE ADHESIVE (WATER-RESISTANT FABRIC)
    BS 3779:1985 Specification for glass and glass polyester fibre woven tapes for electrical purposes
    DEFSTAN 80-77/2(1995) : 1995 PAINT, PRIMING, FLAME RETARDANT, BRUSHING
    NES 102 : ISSUE 1 REQUIREMENTS FOR AIR CONDITIONING & VENTILATION DESIGN
    NES 800 PT 1 : ISSUE 3 AMD 2 REQUIREMENTS FOR THERMAL INSULATION MATERIAL - CALCIUM SILICATE SLAB AND SECTIONS INSULATION MATERIAL
    NES 726 : ISSUE 4 AMD 1 REQUIREMENTS FOR CLEANLINESS OF SHIPS DURING BUILD
    NES 778 : ISSUE 4 REQUIREMENTS FOR CONSTRAINED LAYER DAMPING (CLD) SYSTEMS ON SURFACE SHIPS & SUBMARINES
    NES 774 : ISSUE 4 REQUIREMENTS FOR PREPARATION AND PAINTING SUBMARINES
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective