DEFSTAN 00-42(PT4)/1(2002) : 2002
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
RELIABILITY AND MAINTAINABILITY (R&M) ASSURANCE GUIDE - PART 4: TESTABILITY
15-02-2008
12-01-2013
Preface
Main Text
SECTION 1 GENERAL REQUIREMENTS
1 Scope
2 WARNING
3 Related Documents
4 Definitions
5 Abbreviations
SECTION 2 TESTABILITY
6 Testability Process
7 Fault Tolerant Design
8 Prognostics
9 Testability Measures
10 Testability and The R&M Case
11 Testability Risks
12 Contracting for Testability
Figure 1 Testability Process Diagram
Gives requirements for procedural and technical aspects and guidelines to be followed during development of equipment procured for the UK armed forces.
DevelopmentNote |
Supersedes DEFSTAN 00-13/3(1994) (06/2003)
|
DocumentType |
Standard
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
DEFSTAN 00-42(PT6)/1(2007) : 2007 | RELIABILITY AND MAINTAINABILITY ASSURANCE ACTIVITY - PART 6: MAINTAINABILITY DEMONSTRATIONS |
DEFSTAN 00-54(PT1)/1(1999) : 1999 | REQUIREMENTS FOR SAFETY RELATED ELECTRONIC HARDWARE IN DEFENCE EQUIPMENT - PART 1: REQUIREMENTS |
DEFSTAN 00-54(PT2)/1(1999) : 1999 | REQUIREMENTS FOR SAFETY RELATED ELECTRONIC HARDWARE IN DEFENCE EQUIPMENT - PART 2: GUIDANCE |
DEFSTAN 25-24/1(2004) : 2004 | HEALTH AND USAGE MONITORING CAPABILITY FOR LAND PLATFORMS (HUMS) |
BS 5760-4:2003 | Reliability of systems, equipment and components Guide to the specification of dependability requirements |
07/30144128 DC : 0 | BS EN 60300-3-15 - DEPENDABILITY MANAGEMENT - PART 3-15: GUIDANCE TO ENGINEERING OF SYSTEM DEPENDABILITY |
DEFSTAN 00-42(PT1)/2(2008) : 2008 | RELIABILITY AND MAINTAINABILITY (R&M) ASSURANCE ACTIVITY - PART 1: ONE-SHOT DEVICES/SYSTEMS |
ARMP-7 : 2008 | NATO R&M TERMINOLOGY APPLICABLE TO ARMPS |
DEFSTAN 00-49/1(1996) : 1996 | RELIABILITY AND MAINTAINABILITY MOD GUIDE TO TERMINOLOGY DEFINITIONS |
DEFSTAN 00-42(PT3)/1(1999) : 1999 | RELIABILITY AND MAINTAINABILITY (R&M) ASSURANCE GUIDANCE - PART 3: R&M CASE |
DEFSTAN 00-42(PT2)/1(1997) : 1997 | RELIABILITY AND MAINTAINABILITY ASSURANCE GUIDES - PART 2: SOFTWARE |
DEFSTAN 00-42(PT1)/1(1997) : 1997 | RELIABILITY AND MAINTAINABILITY ASSURANCE GUIDES - PART 1: ONE-SHOT DEVICES/SYSTEMS |
DEFSTAN 05-57/4(2000) : 2000 | CONFIGURATION MANAGEMENT OF DEFENSE MATERIAL |
DEFSTAN 00-40(PT1)/4(1999) : 1999 | RELIABILITY AND MAINTAINABILITY (R&M) - PART 1: MANAGEMENT RESPONSIBILITIES AND REQUIREMENTS FOR PROGRAMMES AND PLANS |
DEFSTAN 00-70(PT1)/1(1997) : 1997 | STANDARD SERVICEABILITY TESTING - PART 1: THE PROCESS FOR THE PREPARATION OF AND REQUIREMENTS AND GUIDANCE FOR, A STANDARD SERVICEABILITY TEST SPECIFICATION |
DEFSTAN 00-43(PT2)/1(1995) : 1995 | RELIABILITY AND MAINTAINABILITY ASSURANCE ACTIVITY - PART 2: MAINTAINABILITY DEMONSTRATIONS |
DEFSTAN 00-52/3(1991) : 1991 | THE GENERAL REQUIREMENTS FOR PRODUCT ACCEPTANCE AND MAINTENANCE TEST SPECIFICATIONS AND TEST SCHEDULES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.