• Shopping Cart
    There are no items in your cart

DEFSTAN 02-38/1(2005) : 2005

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

REQUIREMENTS FOR THE PREPARATION, IDENTIFICATION AND MANAGEMENT OF DATUM PACK DRAWINGS AND PHOTOGRAPHS FOR S AND T NUCLEAR SUBMARINES

Available format(s)

Hardcopy , PDF

Superseded date

14-01-2011

Language(s)

English

Published date

01-01-2005

€17.53
Excluding VAT

1 Scope
2 Warning
3 Normative References
4 Definitions
5 Abbreviations
6 Completeness of Drawings
7 General Drawing Standards & Requirements
   7.1 Categorisation of DP Drawings
   7.2 Drawing Standards
   7.3 Drawing and Document Lists
   7.4 Drawing Presentation
   7.5 Supply of Master Drawings
   7.6 Magnetic Material
   7.7 Drawing Requirements
8 Specific Drawing Definitions
   8.1 Submarine Structural Drawings
   8.2 Submiss/Subsunk Drawings
   8.3 First Level Definition
   8.4 Docking Plans
   8.5 Computerised Drawings from Engineering Models (CODEM)
   8.6 Reduced Size Drawings
   8.7 Cabling & Pipework
   8.8 Electrical Drawings
   8.9 Panel Electronic Circuit (PEC) Drawings
   8.10 Service Packaging Instruction Sheets (SPIS)
   8.11 Service Interface Diagrams (SID)
   8.12 Reactor Control & Instrumentation (RC&I) Drawings
   8.13 Completion of Prepared Spaces
9 Limiting Requirements
10 Microfilming and Aperature Cards
   10.1 Microfilm
   10.2 Punch Code
11 Models and Mock-Ups
12 Photographs and Videos
13 Identification Requirements
   13.1 Introduction
   13.2 Responsible Authority Codes
   13.3 Numbering of Drawings
   13.4 BAe Systems (Ex VSEL) Drawing Numbers
   13.5 Weapon Equipments
   13.6 Data Strip - Additional Data
   13.7 Drawing Cross-Reference in Other Documents
   13.8 Security & Caveat Markings
14 Swiftsure Class - Updating Datum Pack Drawings
   14.1 General
   14.2 Drawing Sheets & Formats
   14.3 Recording Changes On Change Record Sheets
         (Preferred Method)
   14.4 Recording Changes On Change Record Sheets
         (Alternative Method)
   14.5 Drawing Issue Updating Requirements
   14.6 Drawing Issue Updating Procedures
   14.7 Conversion Of Class Drawings to Submarine Specific
   14.8 Amendment to Drawing Numbers and Issue States
   14.9 System Component & Detail Drawing Amendment
   14.10 Equipment Drawings
   14.11 Equipment Component & Detail Drawing Amendment
   14.12 Responsibility for Updating the Master Drawing
   14.13 Additional & New Drawings
   14.14 Metric & Imperial Measurements
   14.15 Submiss/Subsunk Drawings
   14.16 Reduced Size Drawings
   14.17 Standard Drawings - Hull & Mechanical
   14.18 Docking Plan
   14.19 Reactor Control & Instrumentation (RC&I) Drawings
15 Swiftsure Class - Requirements for The Management
   Control & Distribution of Datum Pack Drawings & Microfilms
   15.1 General Requirements
   15.2 Filing & Storing
   15.3 Copying & Distribution
   15.4 Drawing/Microfilm - Control & Issue
   15.5 Comprehensive Drawing Indices
   15.6 Drawing Supply - Timescales
   15.7 Submiss/Subsunk, Escape, Rescue & Salvage Information
         Drawings
   15.8 First Level Area Diagrams & First Level Fittings List
   15.9 All Other Drawings
   15.10 Disposal of Drawings
16 Trafalgar Class - Updating Datum Pack Drawings
   16.1 General
   16.2 Drawing Sheets & Formats
   16.3 Recording Changes on Change Record Sheets
         (Preferred Method)
   16.4 Recording Changes on Change Record Sheets
         (Alternative Method)
   16.5 Drawing Issue Updating Requirements
   16.6 Drawing Issue Updating Procedures
   16.7 Conversion Of Class Drawings to Submarine Specific
   16.8 Amendment To Drawing Numbers and Issue States
   16.9 System Arrangement & Detail Drawing Amendment
   16.10 Equipment Drawings
   16.11 Equipment Component & Detail Drawing Amendment
   16.12 Responsibility for Updating the Master Drawing
   16.13 Additional & New Drawings
   16.14 Metric & Imperial Measurements
   16.15 Submiss/Subsunk Drawings
   16.16 Reduced Size Drawings
   16.17 Standard Drawings - Hull & Mechanical
   16.18 Docking Plan
   16.19 ISOPAC Drawings
   16.20 Reactor Control & Instrumentation (RC&I) Drawings
17 Trafalgar Class - Requirements for The Management
   Control & Distribution of Datum Pack Drawings & Microfilms
   17.1 General Requirements
   17.2 Filing & Storing
   17.3 Copying & Distribution
   17.4 Drawing/Microfilm - Control & Issue
   17.5 Comprehensive Drawing Indices
   17.6 Drawing Supply - Timescales
   17.7 Submiss/Subsunk, Escape, Rescue & Salvage
         Information Drawings
   17.8 First Level Area Diagrams & First Level Fittings List
   17.9 All Other Drawings
   17.10 Disposal Of Drawings

Specifies requirements for The Preparation, Identification And Management of Datum Pack drawings and photographs for S and T Class nuclear submarines.

DevelopmentNote
Supersedes SSCP 43 (11/2005) This standard is obsolescent because it is no longer required for the procurement of new equipment but is retained for maintenance purposes in support of existing in-service equipment. (07/2009)
DocumentType
Miscellaneous Product
Pages
58
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy

BS 4636-1:1970 Punched cards Unpunched paper cards

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.