DEFSTAN 05-123(PT0)/2(2004) : 2004
|
TECHNICAL PROCEDURES FOR THE PROCUREMENT OF AIRCRAFT, WEAPONS AND ELECTRONIC SYSTEMS - PART 0: GENERAL INFORMATION & INDEX TO ALL PARTS OF DEF STAN 05-123
|
DEFSTAN 02-718/1(2002) : 2002
|
REQUIREMENTS FOR SEWAGE PLANT AND ANCILLARY EQUIPMENT IN HM SURFACE SHIPS AND SUBMARINES
|
DEFSTAN 00-00(PT2)/1(1986) : AMD 6
|
STANDARDS FOR DEFENCE PT 2 DRAFTING AND PRESENTATION OF DEFENCE STANDARDS
|
DEFSTAN 05-61(PT13)/1(1994) : 1994
|
QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 13: ACCEPTANCE PROCEDURES FOR PROOF EQUIPMENT
|
DEFSTAN 05-53/1(1981) : 1981
|
IDENTIFICATION OF DRAWINGS FOR THEIR RETRIEVAL
|
DEFSTAN 81-41(PT4)/4(2000) : 2000
|
PACKAGING OF DEFENCE MATERIEL - PART 4: DOCUMENTATION
|
DEFSTAN 02-522/2(2004) : 2004
|
VERSATILE CONSOLE SYSTEM (VCS) ENGINEERING MANUAL - CATEGORY 2
|
DEFSTAN 02-307/2(2004) : 2004
|
REQUIREMENTS FOR WORKSHOP EQUIPMENT - CATEGORY 2
|
DEFSTAN 02-632/2(2004) : 2004
|
REQUIREMENTS FOR AC AND DC MOTORS
|
DEFSTAN 05-101(PT1)/1(2005) : 2005
|
PROOF OF ORDNANCE, MUNITIONS, ARMOUR AND EXPLOSIVES - PART 1: REQUIREMENTS
|
DEFSTAN 00-970(PT0)/17(2016) : 2016
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 81-41(PT4)/3(1996) : 1996 AMD 1 1997
|
PACKAGING OF DEFENCE MATERIEL - DOCUMENTATION
|
DEFSTAN 00-970(PT0)/14(2014) : 2014
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 66-21/1(1979) : 1979
|
MULTIMETER SET
|
DEFSTAN 02-323/2(2001) : 2001
|
REQUIREMENTS FOR CENTRIFUGES
|
DEFSTAN 00-970(PT0)/15(2015) : 2015
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 00-970(PT0)/11(2013) : 2013
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 00-970(PT0)/13(2014) : 2014
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 07-85(PT1)/3(2006) : 2006
|
DESIGN REQUIREMENTS FOR WEAPONS AND ASSOCIATED SYSTEMS - PART 1: MANDATORY DESIGN REQUIREMENTS
|
DEFSTAN 66-9(PT1)/2(1983) : 1983 AMD 2 1987
|
INSTRUMENTS, ELECTRICAL INDICATING (HERMETICALLY SEALED) 26 MM AND 38 MM - PART 1: SPECIFICATION
|
DEFSTAN 23-6/3(2000) : 2000
|
GUIDE TO THE COMMON TECHNICAL REQUIREMENTS FOR MILITARY LOGISTIC VEHICLES AND TOWED EQUIPMENT
|
DEFSTAN 00-970(PT0)/10(2013) : 2013
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 00-970(PT0)/16(2015) : 2015
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 66-7(PT1)/3(1983) : 1983 AMD 1 1985
|
INSTRUMENTS, ELECTRICAL INDICATING (SEALED) 50 MM TO 100 MM - PART 1: SPECIFICATION
|
DEFSTAN 81-41(PT4)/2(1984) : 1984 AMD 3
|
PACKAGING OF DEFENCE MATERIAL - DOCUMENTATION
|
NES 722 : ISSUE 4
|
REQUIREMENTS FOR DRAWINGS
|
DEFSTAN 05-57/4(2000) : 2000
|
CONFIGURATION MANAGEMENT OF DEFENSE MATERIAL
|
DEFSTAN 81-41(PT4)/5(2003) : 2003
|
PACKAGING OF DEFENCE MATERIAL - PART 4: DOCUMENTATION
|
DEFSTAN 05-57/5(2005) : 2005
|
CONFIGURATION MANAGEMENT OF DEFENCE MATERIEL
|
DEFSTAN 02-302(PT1)/1(2000) : 2000
|
REQUIREMENTS FOR MAINTENANCE ENVELOPES AND REMOVAL ROUTES - PART 1: SURFACE SHIPS CATEGORY 2
|
NES 302 PT 1 : ISSUE 2
|
REQUIREMENTS FOR MAINTENANCE ENVELOPES AND REMOVAL ROUTES - SURFACE SHIPS
|
DEFSTAN 05-57/3(1993) : 1993
|
CONFIGURATION MANAGEMENT
|
DEFSTAN 66-16/1(1975) : 1975
|
TEST SET, SAFETY, VOLTAGE DETECTION
|
DEFSTAN 21-12(PT1)/2(2003) : 2003
|
MASTER RECORDS INDEX - PART 1: REQUIREMENTS FOR THE PREPARATION OF MRI USING MRI CONSTRUCTOR SOFTWARE
|
DEFSTAN 05-124/1(1992) : 1992
|
PROCEDURES FOR THE PROCUREMENT OF AIRCRAFT ENGINES AND THEIR ACCESSORIES
|
DEFSTAN 02-322/2(2002) : 2002
|
OIL AND BILGE WATER SHIPBOARD PROCESSING ARRANGEMENTS
|
DEFSTAN 66-6/4(1993) : 1993
|
OHMMETER, SAFETY, MULTI-RANGE, BATTERY POWERED SET
|