Credit card payment only is accepted for this order because it contains a mix of both publications and training products.
Invalid username/password. Please try again.
xyz
REQUIREMENTS FOR STATIC CONVERSION EQUIPMENT FOR POWER SERVICES
:
Available format(s):
Superseded date: 28-02-2023
Language(s):
Published date: 12-01-2013
Publisher: UK Ministry of Defence Standards
TITLE PAGE SCOPE FOREWORD Sponsorship Conditions of Release Categories of Defence Standard Related Documents Health and Safety Additional Information CONTENTS SECTION 1 - PERFORMANCE SPECIFICATION 1.1 Performance 1.1.1 General SECTION 2 - NATIONAL/INTERNATIONAL REGULATIONS 2.1 Warning Signs SECTION 3 - MILITARY STANDARDS/REQUIREMENTS 3.1 Environmental Considerations 3.1.1 Self-Induced Noise and Vibration 3.1.2 Permissible Temperature Rises 3.1.3 Equipment Cooling 3.1.4 Electromagnetic Compatibility 3.1.5 Reliability and Maintainability 3.2 Information to be Supplied when Tendering 3.2.1 Tender Drawings 3.2.2 Additional Information 3.3 Drawings 3.3.1 Approval Drawings 3.3.2 Delegated Approval 3.4 Marking 3.5 Spares 3.6 Testing 3.6.1 New Design 3.6.2 Modifications 3.6.3 Pre-production Equipment 3.6.4 Production Tests 3.6.5 Temperature Rise Test 3.6.6 Efficiency 3.6.7 Output with Cooler Inoperative 3.6.8 Steady State Voltage/Load Characteristics 3.6.9 Voltage Balance 3.6.10 Phase Displacement 3.6.11 Ripple or Waveform of Voltage 3.6.12 Voltage Modulation 3.6.13 Voltage Range 3.6.14 Steady State Frequency Characteristics 3.6.15 Frequency Modulation 3.6.16 Frequency Range 3.6.17 Voltage Transient Response 3.6.18 Short Circuit Tests 3.6.19 Operation of Protective Devices 3.6.20 Effect of Supply Interruptions 3.6.21 Self-Induced Airborne Noise and Vibration 3.6.22 Electromagnetic Compatibility 3.6.23 Tilt Test 3.6.24 Insulation Resistance 3.6.25 Parallel Operation 3.6.26 Electromagnetic Pulse and Initial Nuclear RadiationSECTION 4 - DESIGN REQUIREMENTS/GUIDANCE 4.1 Construction 4.1.1 Construction of Enclosures 4.1.2 Components 4.1.3 Accessibility of Rectifiers 4.1.4 Ventilation Grilles 4.1.5 Closed Air Circuit Water Cooled Equipment 4.1.6 Pumps and Fans 4.2 Power Supplies 4.2.1 Input Supply 4.2.2 Output 4.2.3 Parallel Running 4.3 Control and Protection 4.3.1 Protection Principles 4.3.2 Voltage and Frequency Protection 4.3.3 Short Circuit and Overcurrent Protection 4.3.4 Control Principles 4.3.5 Voltage Control 4.3.6 Frequency Control 4.3.7 Control of Motor Auxiliaries 4.3.8 Indication Circuits 4.3.9 Microprocessors and Built-in-Test SECTION 5 - CORPORATE EXPERIENCE & KNOWLEDGE 5.1 Equipment Cooling ANNEX A - RELATED DOCUMENTS ANNEX B - ABBREVIATIONS AND DEFINITIONS ANNEX C - PROCUREMENT CHECK LIST ALPHABETICAL INDEX
Applicable to particular requirements for the design and performance of Static Conversion Equipment for HM Surface Ships and Submarines.
Sorry this product is not available in your region. p>
Unfortunately, this product is not available for purchase in your region.
Features
Get in touch with us
Loading..
A free alerting service to track changes to standards.
Once you've completed your purchase you'll get a link to My Orders on: -the Confirmation page of check out -and by email You'll be able to access your Multi User Orders to add Users.
You have selected more than three (3) participants. Please contact our Customer Service team.
You have already added this product in the cart. If you would like to add additional copies of this product please adjust the Quantity in the cart. For more than 10 copies, please contact our Customer Support team on +353 (0)1 857 6730.
You have selected more than three (3) trainings. Please contact our Customer Service team.Please contact our Customer Service team on Email: sales@saiglobal.com Phone: 131 242 (Within Australia)
You have already added a product with different Currency. Please change the currency.
This product cannot be added to your cart right now. Please contact our Customer Service team on Email: info@standards.iePhone: +353(0)1 857 6730
You have already saved 6 Quotes. Please contact our Customer Service Team.