• DEFSTAN 02-529(PT2)/1(2000) : 2000

    Withdrawn A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

    NUCLEAR HARDENING GUIDE - PART 2: ELECTRICAL INSTALLATION IN SURFACE SHIPS

    Available format(s):  Hardcopy, PDF

    Withdrawn date:  30-10-2012

    Language(s):  English

    Published date:  01-01-2000

    Publisher:  UK Ministry of Defence Standards

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    AUTHORIZATION
    CONDITIONS OF RELEASE
    CONTENTS
    INTRODUCTION
    Sec.1 Scope
    Sec.2 Related Documents
    Sec.3 Definitions
    Sec.4 NEMP and its Effects
    Sec.5 Platform Hardening
    Sec.6 Exposed Cable Installation
    Sec.7 Installation of Electrical
             Conduits and Fittings
    Sec.8 Trunking and Pipework
    Sec.9 Cable Glands
    Sec.10 Waveguides
    Sec.11 Aerial Cables
    Sec.12 Bonding of Superstructure to
             Deck
    Sec.13 Screening by Treated GRP
    Sec.14 Specific Installation Problems
    Sec.15 Maintenance and Refits
    ALPHABETICAL INDEX

    Abstract - (Show below) - (Hide below)

    Gives guidance to ship designers, shipbuilders and equipment installers on design and installation practices to reduce the penetration of electrical energy from an incident Nuclear Electromagnetic Pulse (NEMP) into the interior of a surface ship to acceptable levels.

    General Product Information - (Show below) - (Hide below)

    Development Note This is a redesignation of NES 529 PT2. (01/2001)
    Document Type Standard
    Publisher UK Ministry of Defence Standards
    Status Withdrawn
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    DEFSTAN 59-411(PT1)/2(2014) : 2014 ELECTROMAGNETIC COMPATIBILITY - PART 1: MANAGEMENT AND PLANNING
    DEFSTAN 02-522/2(2004) : 2004 VERSATILE CONSOLE SYSTEM (VCS) ENGINEERING MANUAL - CATEGORY 2
    DEFSTAN 02-102(PT1)/3(2005) : 2005 REQUIREMENTS FOR AIR-CONDITIONING AND VENTILATION - PART 1: HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES
    DEFSTAN 00-101(PT3)/2(2008) : 2008 DESIGN STANDARDS FOR EXPLOSIVES SAFETY IN MOD SHIPS AND SUBMARINES - PART 3: ELECTRICAL EQUIPMENT AND INSTALLATION
    DEFSTAN 02-536/2(2003) : 2003 REQUIREMENTS FOR STATIC CONVERSION EQUIPMENT FOR POWER SERVICES
    DEFSTAN 59-411(PT1)/1(2007) : 2007 ELECTROMAGNETIC COMPATIBILITY - PART 1: MANAGEMENT AND PLANNING
    DEFSTAN 02-550/2(2003) : 2003 GUIDE TO DESIGN OF AF250 SERIES MAIN BROADCAST SYSTEMS
    DEFSTAN 02-510/1(2006) : 2006 REQUIREMENTS FOR CABLE GLANDS IN BULKHEADS AND DECKS OF SURFACE SHIPS

    Standards Referencing This Book - (Show below) - (Hide below)

    NES 1050 : ISSUE 2 REQUIREMENTS FOR WAVEGUIDE INSTALLATION
    BS 5260:1975 Code of practice for radio interference suppression on marine installations
    NES 1027 : ISSUE 1 AMD 1 ELECTROMAGNETIC COMPATIBILITY REQUIREMENTS FOR INSTALLATIONS IN SHIPS
    NES 529 PT1 : ISSUE 2 NUCLEAR HARDENING GUIDE - HARDENING AGAINST NUCLEAR EMP AND INR (RESTRICTED)
    NES 515 : ISSUE 2 AMD 1 GUIDE TO ELECTROMAGNETIC COMPATIBILITY
    NES 501 : RESTRICTED GENERAL REQUIREMENTS FOR THE DESIGN OF ELECTROTECHNICAL AND NAVAL WEAPON EQUIPMENT
    NES 1051 : ISSUE 1 REQUIREMENTS FOR THE INSTALLATION OF CORRUGATED COPPER AIR SPACED R/F CABLE
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective