• Shopping Cart
    There are no items in your cart

DEFSTAN 05-61(PT14)/1(1994) : 1994

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 14: PROOF SCHEDULES FOR CONVENTIONAL WEAPONS, AMMUNITION AND EXPLOSIVE ITEMS OF NEW MANUFACTURE

Available format(s)

Hardcopy , PDF

Superseded date

20-05-2005

Language(s)

English

Published date

01-01-1994

€14.02
Excluding VAT

Preface
1 Scope
2 Related Documents
3 Definitions
4 Background
5 Principles
6 Proof Schedules
Annex A - Format of Proof Schedule

Details the requirements for the preparation of proof schedules for the proof of conventional weapons, acceptance proof testing of ammunitions and explosive items of new manufacture.

DevelopmentNote
Supersedes DEFSTAN 05-62(PT17)/1(1987) (07/2003) This standard is obsolescent because it is no longer required for the procurement of new equipment but is retained for maintenance purposes in support of existing in-service equipment. (09/2007)
DocumentType
Standard
Pages
16
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy
Supersedes

DEFSTAN 05-123(PT0)/2(2004) : 2004 TECHNICAL PROCEDURES FOR THE PROCUREMENT OF AIRCRAFT, WEAPONS AND ELECTRONIC SYSTEMS - PART 0: GENERAL INFORMATION & INDEX TO ALL PARTS OF DEF STAN 05-123
DEFSTAN 00-970(PT0)/6(2010) : 2010 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
DEFSTAN 00-970(PT0)/5(2007) : 2007 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
DEFSTAN 13-92/3(1996) : 1996 MANUFACTURE, INSPECTION AND PROOF OF ORDNANCE OF 20 MM CALIBRE AND OVER

DEFSTAN 05-92/2(1995) : 1995 QUALITY SYSTEM REQUIREMENTS FOR PRODUCTION, INSTALLATION AND SERVICING
DEFSTAN 13-92/3(1996) : 1996 MANUFACTURE, INSPECTION AND PROOF OF ORDNANCE OF 20 MM CALIBRE AND OVER
DEFSTAN 05-91/2(1995) : 1995 QUALITY SYSTEM REQUIREMENTS FOR DESIGN/DEVELOPMENT, PRODUCTION, INSTALLATION AND SERVICING
BS 6002-1:1993 Sampling procedures for inspection by variables Specification for single sampling plans indexed by acceptable quality level (AQL) for lot-by-lot inspection
DEFSTAN 05-61(PT11)/2(1992) : 1992 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 11: PROOF SENTENCING
DEFSTAN 05-61(PT13)/1(1994) : 1994 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 13: ACCEPTANCE PROCEDURES FOR PROOF EQUIPMENT
BS 6001(1972) : AMD 5054 SAMPLING PROCEDURES FOR INSPECTION BY ATTRIBUTES - SPECIFICATION FOR SAMPLING PLANS INDEXED BY ACCEPTABLE QUALITY LEVEL (AQL) FOR LOT - BY - LOT INSPECTION

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.