• There are no items in your cart

DIN EN 61400-25-5 : 2007

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING

Available format(s)

Hardcopy

Superseded date

18-10-2018

Language(s)

English

Published date

01-01-2007

€292.14
Excluding VAT

INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Introduction to conformance testing
  5.1 General
  5.2 Conformance test procedures
  5.3 Quality assurance and testing
  5.4 Testing
  5.5 Documentation of conformance test report
6 Device related conformance testing
  6.1 General guidelines
  6.2 Standard test procedures
  6.3 Conformance test procedures
7 Performance tests
  7.1 General
  7.2 Communications latency
  7.3 Time synchronisation and accuracy
  7.4 Stability test
Annex A (informative) Examples of test procedure template
Annex ZA (normative) Normative references to international
         publications with their corresponding European
         publications
Bibliography

Describes standard techniques for testing of conformance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters.

DevelopmentNote
DRAFT 2017 issued in August 2017. (08/2017)
DocumentType
Standard
Pages
47
PublisherName
Verband Deutscher Elektrotechniker
Status
Superseded

Standards Relationship
UNE-EN 61400-25-5:2007 Identical
IEC 61400-25-5:2017 Identical
BS EN 61400-25-5:2007 Identical
NBN EN 61400-25-5 : 2007 Identical
I.S. EN 61400-25-5:2007 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.