EN 1395-2:2007
Current
The latest, up-to-date edition.
Thermal spraying - Acceptance inspection of thermal spraying equipment - Part 2: Flame spraying including HVOF
31-01-2007
Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Principles of acceptance inspection
5 Procedure of acceptance inspection
6 Designation
7 Inspection report
Annex A (informative) Inspection report for flame spraying
equipment using spraying powder including HVOF
(initial test/retest)
Annex B (informative) Inspection report for flame spraying
equipment using spraying wire, rods or cords
(initial test/retest)
Bibliography
This European Standard specifies requirements for the acceptance inspection of thermal spraying equipment in the case flame spraying including HVOF (high velocity oxygen-fuel), used in spray jobs to produce thermally sprayed coatings of reproducible quality.This part should be used in conjunction with EN 1395-1, which includes general requirements and explanations of procedures.
| Committee |
CEN/TC 240
|
| DevelopmentNote |
Together with EN 1395-1, EN 1395-3, EN 1395-4, EN 1395-5, EN 1395-6 and EN 1395-7 supersedes EN 1395. To be read in conjunction with EN 1395-1. (02/2007)
|
| DocumentType |
Standard
|
| PublisherName |
Comite Europeen de Normalisation
|
| Status |
Current
|
| Supersedes |
| Standards | Relationship |
| BS EN 1395-2:2007 | Identical |
| DIN EN 1395-2:2007-04 | Identical |
| PN EN 1395-2 : 2007 | Identical |
| NF EN 1395-2 : 2007 | Identical |
| NEN EN 1395-2 : 2007 | Identical |
| I.S. EN 1395-2:2007 | Identical |
| NBN EN 1395-2 : 2007 | Identical |
| NS EN 1395-2 : 1ED 2007 | Identical |
| UNE-EN 1395-2:2008 | Identical |
| BS EN 15648:2009 | Thermal spraying. Component related procedure qualification |
| DIN EN 1395-1:2007-04 | Thermal spraying - Acceptance inspection of thermal spraying equipment - Part 1: General requirements |
| DIN EN 1395-7:2007-04 | Thermal spraying - Acceptance inspection of thermal spraying equipment - Part 7: Powder feed systems |
| BS EN ISO 12690:2010 | Metallic and other inorganic coatings. Thermal spray coordination. Tasks and responsibilities |
| 09/30196832 DC : 0 | BS ISO 12690 - THERMAL SPRAYING - THERMAL SPRAY COORDINATION - TASKS AND RESPONSIBILITIES |
| I.S. EN 1395-1:2007 | THERMAL SPRAYING - ACCEPTANCE INSPECTION OF THERMAL SPRAYING EQUIPMENT - PART 1: GENERAL REQUIREMENTS |
| I.S. EN ISO 2063-2:2017 | THERMAL SPRAYING - ZINC, ALUMINIUM AND THEIR ALLOYS - PART 2: EXECUTION OF CORROSION PROTECTION SYSTEMS (ISO 2063-2:2017) |
| I.S. EN 15648:2009 | THERMAL SPRAYING - COMPONENT RELATED PROCEDURE QUALIFICATION |
| BS EN 1395-1:2007 | Thermal spraying. Acceptance inspection of thermal spraying equipment General requirements |
| BS EN 1395-7:2007 | Thermal spraying. Acceptance inspection of thermal spraying equipment Powder feed system |
| DIN EN 15648:2009-04 | THERMAL SPRAYING - COMPONENT RELATED PROCEDURE QUALIFICATION |
| 14/30273520 DC : 0 | BS EN ISO 2063-2 - THERMAL SPRAYING - METALLIC AND OTHER INORGANIC COATINGS - ZINC, ALUMINIUM AND THEIR ALLOYS - PART 2: CONDITIONS FOR EXECUTION OF CORROSION PROTECTION WORKS BY THERMAL SPRAY PROCESSES |
| NF EN ISO 12690 : 2011 | METALLIC AND OTHER INORGANIC COATINGS - THERMAL SPRAY COORDINATION - TASKS AND RESPONSIBILITIES |
| BS EN ISO 2063-2:2017 | Thermal spraying. Zinc, aluminium and their alloys Execution of corrosion protection systems |
| EN ISO 2063-2:2017 | Thermal spraying - Zinc, aluminium and their alloys - Part 2: Execution of corrosion protection systems (ISO 2063-2:2017) |
| I.S. EN ISO 12690:2010 | METALLIC AND OTHER INORGANIC COATINGS - THERMAL SPRAY COORDINATION - TASKS AND RESPONSIBILITIES |
| ISO 12690:2010 | Metallic and other inorganic coatings — Thermal spray coordination — Tasks and responsibilities |
| EN 1395-1:2007 | Thermal spraying - Acceptance inspection of thermal spraying equipment - Part 1: General requirements |
| EN 1395-7:2007 | Thermal spraying - Acceptance inspection of thermal spraying equipment - Part 7: Powder feed systems |
| EN 15648:2009 | Thermal spraying - Component related procedure qualification |
| I.S. EN 1395-7:2007 | THERMAL SPRAYING - ACCEPTANCE INSPECTION OF THERMAL SPRAYING EQUIPMENT - PART 7: POWDER FEED SYSTEMS |
| DIN EN ISO 12690:2011-04 | Metallic and other inorganic coatings - Thermal spray coordination - Tasks and responsibilities (ISO 12690:2010) |
| ISO 2063-2:2017 | Thermal spraying — Zinc, aluminium and their alloys — Part 2: Execution of corrosion protection systems |
| EN ISO 12690:2010 | Metallic and other inorganic coatings - Thermal spray coordination - Tasks and responsibilities (ISO 12690:2010) |
| UNE-EN 15648:2010 | Thermal spraying - Component related procedure qualification |
| UNE-EN ISO 12690:2011 | Metallic and other inorganic coatings - Thermal spray coordination - Tasks and responsibilities (ISO 12690:2010) |
| EN 1395-1:2007 | Thermal spraying - Acceptance inspection of thermal spraying equipment - Part 1: General requirements |
| EN 1395-7:2007 | Thermal spraying - Acceptance inspection of thermal spraying equipment - Part 7: Powder feed systems |
| EN 657:2005 | Thermal spraying - Terminology, classification |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.