• Shopping Cart
    There are no items in your cart

EN 14908-2:2014

Current

Current

The latest, up-to-date edition.

Open Data Communication in Building Automation, Controls and Building Management - Control Network Protocol - Part 2: Twisted Pair Communication

Published date

30-04-2014

Sorry this product is not available in your region.

Foreword
Introduction
1 Scope
2 Normative references
3 Network overview
4 System specifications
5 Link power
6 Node specifications
7 Communication parameters
Annex A (informative) - Environmental specifications
Bibliography

This European Standard specifies the control network protocol (CNP) free-topology twisted-pair channel for networked control systems in commercial Building Automation, Controls and Building Management and is used in conjunction with EN 14908-1:2014. The channel supports communication at 78,125 kbit/s between multiple nodes, each of which consists of a transceiver, a protocol processor, an application processor, a power supply, and application electronics.This European Standard covers the complete physical layer (OSI Layer 1), including the interface to the Media Access Control (MAC) sub-layer and the interface to the medium. Parameters that are controlled by other layers but control the operation of the physical layer are also specified.

Committee
CEN/TC 247
DevelopmentNote
Together with EN 13321-1 and EN 14908-1 Supersedes ENV 13154-2. (11/2005) To be read in conjunction with EN 14908-1. Supersedes PREN 14908-2. (05/2014) Supersedes UNE EN 14908-2. (06/2014)
DocumentType
Standard
PublisherName
Comite Europeen de Normalisation
Status
Current
Supersedes

BS EN 14908-5:2009 Open data communication in building automation, controls and building management implementation guideline. Control network protocol Implementation
09/30186912 DC : DRAFT MAR 2009 BS EN 14908-6 - OPEN DATA COMMUNICATION IN BUILDING AUTOMATION, CONTROLS AND BUILDING MANAGEMENT - CONTROL NETWORK PROTOCOL - PART 6: APPLICATION ELEMENTS
I.S. EN 14908-5:2009 OPEN DATA COMMUNICATION IN BUILDING AUTOMATION, CONTROLS AND BUILDING MANAGEMENT IMPLEMENTATION GUIDELINE - CONTROL NETWORK PROTOCOL - PART 5: IMPLEMENTATION
PREN 14908-6 : DRAFT 2014 OPEN DATA COMMUNICATION IN BUILDING AUTOMATION, CONTROLS AND BUILDING MANAGEMENT - CONTROL NETWORK PROTOCOL - PART 6: APPLICATION ELEMENTS
BS EN 14908-6:2014 Open Data Communication in Building Automation, Controls and Building Management. Control Network Protocol Application elements
UNI EN 14908-5 : 2009 OPEN DATA COMMUNICATION IN BUILDING AUTOMATION, CONTROLS AND BUILDING MANAGEMENT IMPLEMENTATION GUIDELINE - CONTROL NETWORK PROTOCOL - PART 5: IMPLEMENTATION
EN 14908-6:2014 Open Data Communication in Building Automation, Controls and Building Management - Control Network Protocol - Part 6: Application elements
EN 14908-5:2009 Open Data Communication in Building Automation, Controls and Building Management Implementation Guideline - Control Network Protocol - Part 5: Implementation
14/30294063 DC : 0 BS EN 14908-6 - OPEN DATA COMMUNICATION IN BUILDING AUTOMATION, CONTROLS AND BUILDING MANAGEMENT - CONTROL NETWORK PROTOCOL - PART 6: APPLICATION ELEMENTS
06/30149065 DC : 0 EN 14908-5 - OPEN DATA COMMUNICATION IN BUILDING AUTOMATION, CONTROLS AND BUILDING MANAGEMENT IMPLEMENTATION GUIDELINE - CONTROL NETWORK PROTOCOL - PART 5: IMPLEMENTATION GUIDELINE
I.S. EN 14908-6:2014 OPEN DATA COMMUNICATION IN BUILDING AUTOMATION, CONTROLS AND BUILDING MANAGEMENT - CONTROL NETWORK PROTOCOL - PART 6: APPLICATION ELEMENTS

EN 14908-1:2014 Open Data Communication in Building Automation, Controls and Building Management - Control Network Protocol - Part 1: Protocol Stack
IEC 61000-4-4:2012 RLV Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
CISPR 22:2008 Information technology equipment - Radio disturbance characteristics - Limits and methods of measurement
EN 50173-1:2011 Information technology - Generic cabling systems - Part 1: General requirements
EN 55022:2010/AC:2011 INFORMATION TECHNOLOGY EQUIPMENT - RADIO DISTURBANCE CHARACTERISTICS - LIMITS AND METHODS OF MEASUREMENT (CISPR 22:2008)
IEC 61000-4-2:2008 Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
IEC 61000-4-3:2006+AMD1:2007+AMD2:2010 CSV Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity test

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.