EN 1538:2010+A1:2015
Current
The latest, up-to-date edition.
Execution of special geotechnical work - Diaphragm walls
10-06-2015
Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Information needed for the execution of the work
5 Geotechnical investigation
6 Materials and products
7 Considerations related to design
8 Execution
9 Supervision, testing and monitoring
10 Records
11 Special requirements
Annex A (informative) - Glossary
Annex B (informative) - Control schedules during the
execution
Annex C (informative) - Sample concreting record forms
for diaphragm walls
Annex D (informative) - Degree of obligation of the provisions
Bibliography
This European Standard establishes general principles for the execution of diaphragm walls as either retaining walls or cut-off walls.
NOTE 1This standard covers only structures constructed in a trench excavated with a support fluid or in dry conditions, where soil is removed and replaced by concrete or slurry and with wall thickness B ≥ 40 cm.
NOTE 2Diaphragm walls can be permanent or temporary structures.
NOTE 3The following types of structure are considered:
a)retaining walls: usually constructed to support the sides of an excavation in the ground. They include:
1)cast in situ concrete diaphragm walls;
2)precast concrete diaphragm walls;
3)reinforced slurry walls;
b)cut-off walls: usually constructed to prevent migration of groundwater, clear or polluted, or of other contaminants present in the ground. They include:
1)slurry walls (possibly with membranes or sheet piles);
2)plastic concrete walls.
NOTE 4Walls formed shallow vertical trenches (typically excavations with a ratio of depth over thickness D/B < 5 or D < 5 m) are not covered by this standard.
Committee |
CEN/TC 288
|
DevelopmentNote |
Supersedes PREN 1538. (11/2010) 2010 Edition Re-Issued in June 2015 & incorporates AMD 1 2015. (06/2015)
|
DocumentType |
Standard
|
PublisherName |
Comite Europeen de Normalisation
|
Status |
Current
|
Supersedes |
Standards | Relationship |
UNE-EN 1538:2011 | Identical |
UNI EN 1538:2015 | Identical |
SN EN 1538 : 2010 + A1 2015 | Identical |
PN EN 1538 : 2010 + A1 2015 | Identical |
BS EN 1538 : 2010 | Identical |
NBN EN 1538 : 2010 + A1 2015 | Identical |
NEN EN 1538 : 2010 + A1 2015 | Identical |
DIN EN 1538:2015-10 | Identical |
I.S. EN 1538:2010+A1:2015 | Identical |
UNI EN 1538 : 2010 | Identical |
NF EN 1538 : 2010 + A1 2015 | Identical |
NS EN 1538 : 2000 | Identical |
I.S. EN 1538:2010 | Identical |
BS EN 1538:2010+A1:2015 | Identical |
UNE-EN 1538:2011+A1:2016 | Identical |
PREN 1536 : DRAFT 2008 | EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES |
BS EN 206 : 2013 | CONCRETE - SPECIFICATION, PERFORMANCE, PRODUCTION AND CONFORMITY |
BS 8004:2015 | Code of practice for foundations |
DIN EN 206:2014-07 | CONCRETE - SPECIFICATION, PERFORMANCE, PRODUCTION AND CONFORMITY |
08/30192723 DC : 0 | BS EN 1536 - EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES |
DIN EN 1536:2015-10 | EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES |
I.S. EN 1536:2010 | EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES |
EN 206:2013+A1:2016 | Concrete - Specification, performance, production and conformity |
BS EN 1536 : 2010 | EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES |
EN 1536:2010+A1:2015 | Execution of special geotechnical work - Bored piles |
UNE-EN 1536:2011 | Execution of special geotechnical work - Bored piles |
EN 1536:2010+A1:2015 | Execution of special geotechnical work - Bored piles |
EN 10080:2005 | Steel for the reinforcement of concrete - Weldable reinforcing steel - General |
EN 791:1995+A1:2009 | Drill rigs - Safety |
EN 13670:2009 | Execution of concrete structures |
EN 206:2013+A1:2016 | Concrete - Specification, performance, production and conformity |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.