EN 288-7 : 1995
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
SPECIFICATION AND APPROVAL OF WELDING PROCEDURES FOR METALLIC MATERIALS - APPROVAL BY A STANDARD WELDING PROCEDURE FOR ARC WELDING
01-08-2004
12-01-2013
0 Introduction
1 Scope
2 Normative references
3 Definitions
4 Preliminary welding procedure specification (pWPS)
5 Approval of the standard welding procedure
5.1 General
5.2 Parent metal
5.3 Consumables
5.4 Parent metal thickness
5.5 Fillet weld throat thickness
5.6 Diameter of pipes
5.7 Branch connection
6 Use of a standard welding procedure
6.1 General
6.2 Related to the user of standard welding procedure
6.3 Related to welding equipment
6.4 Related to the personnel
6.5 Related to the environmental conditions
7 Validity
8 Preparation and documentation
Defines the conditions for the approval of a standard welding procedure. Also establishes the conditions, limits and ranges of approval needed for the use of standard welding procedures.
DocumentType |
Standard
|
PublisherName |
Comite Europeen de Normalisation
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
UNI EN 288-7 : 1997 | Identical |
UNE-EN 288-7:1996 | Identical |
NF EN 288-7 : 1995 | Identical |
I.S. EN 288-7:1995 | Identical |
SN EN 288-7 : 1995 | Identical |
NEN EN 288-7 : 1995 | Identical |
NBN EN 288-8 : 1995 | Identical |
NS EN 288-7 : 1ED 1995 | Identical |
NBN EN 288-7 : 1995 | Identical |
BS EN 288-7:1995 | Identical |
DIN EN 288-7:1995-08 | Identical |
DIN 4099-2:2003-08 | WELDING OF REINFORCING STEEL - PART 2: QUALITY ASSURANCE |
05/30128654 DC : DRAFT FEB 2005 | EN 1775 - GAS SUPPLY - GAS PIPEWORK FOR BUILDINGS - MAXIMUM OPERATING PRESSURE LESS THAN OR EQUAL TO 5 BAR - FUNCTIONAL RECOMMENDATIONS |
01/714474 DC : DRAFT NOV 2001 | BS EN 14276-1 - PRESSURE EQUIPMENT FOR REFRIGERATING SYSTEMS AND HEAT PUMPS - PART 1: VESSELS - GENERAL REQUIREMENTS |
99/707161 DC : DRAFT APR 99 | PREN 13480-4 METALLIC INDUSTRIAL PIPING - PART 4: FABRICATION AND INSTALLATION |
99/707160 DC : DRAFT APR 99 | DRAFT BS: PREN 13480-3 - METALLIC INDUSTRIAL PIPING - DESIGN AND CALCULATION |
BS EN 288-8:1995 | Specification and approval of welding procedures for metallic materials Approval by a pre-production welding test |
BS EN ISO 13535:2001 | Petroleum and natural gas industries. Drilling and production equipment. Hoisting equipment Hoisting equipment |
NF ENV 1090-1 : 96 FD | EXECUTION OF STEEL STRUCTURES - PART 1: GENERAL RULES AND RULES FOR BUILDINGS |
ISO 13535:2000 | Petroleum and natural gas industries Drilling and production equipment Hoisting equipment |
EN 288-8 : 1995 | SPECIFICATION AND APPROVAL OF WELDING PROCEDURES FOR METALLIC MATERIALS - PART 8: APPROVAL BY A PRE-PRODUCTION WELDING TEST |
EN ISO 13535:2000 | Petroleum and natural gas industries - Drilling and production equipment - Hoisting equipment (ISO 13535:2000) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.