EN 45510-4-2:1999
Current
The latest, up-to-date edition.
Guide for procurement of power station equipment - Part 4: Boiler auxiliaries - Section 2: Gas-air, steam-air and gas-gas heaters
21-04-1999
Foreword
1 Scope
2 Normative references
3 Definitions
3.1 Organizational terms
3.2 Technical terms
3.3 General terms
4 Brief overall project description
4.1 Role and organization of purchaser
4.2 Site location
4.3 Equipment task
4.4 Equipment to be purchased
4.5 Control and instrumentation
4.6 Electrical supplies and other services
4.7 Other interfaces
4.8 Project programme
4.9 Equipment identification systems
5 Extent of supply
6 Terminal points
7 Operational requirements
7.1 Operating environment
7.2 Manning levels
7.3 Normal operation
7.4 Operating hours
7.5 Start-up and shut-down
7.6 Abnormal conditions
7.7 Further operational requirements
8 Life expectancy
8.1 Design life
8.2 Components requiring periodic maintenance
9 Performance requirements
9.1 Duty
9.2 Performance
9.3 Equipment margins
9.4 Availability
9.5 Levels of component redundancy
9.6 Further performance requirements
10 Design and fabrication
10.1 Specific equipment features
10.2 Material selection
10.3 Safety
10.4 Interchangeability
10.5 Fabrication methods
11 Maintenance requirements
11.1 Planned maintenance
11.2 Personnel safety
11.3 Requirements for access
11.4 Lifting requirements
11.5 Special tools
11.6 Test equipment
11.7 Spare parts strategy
11.8 Special precautions
12 Technical documentation requirements
12.1 Tender documentation
12.2 Contract documentation
13 Applicable legislation, regulations, standards and further
requirements
13.1 Legislation and regulations
13.2 Standards
13.3 Further requirements
14 Evaluation criteria
14.1 General
14.2 Technical criteria
15 Quality measures
15.1 General
15.2 Approvals procedure
15.3 Inspection requirements
15.4 Non-conformity
16 Site factors
16.1 Access
16.2 Facilities
16.3 Site specific requirements
17 Verification of specified performance
17.1 General
17.2 Works tests
17.3 Test during installation and commissioning
17.4 Technical conditions for trial run
17.5 Functional and performance tests
Annex A (informative) Bibliography
This standard gives guidance on writing the technical specification for the procurement of air heating equipment associated with steam generating plant and gas reheating equipment associated with flue gas treatment plant for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
Committee |
CEN/CLC/JTC 2
|
DocumentType |
Standard
|
PublisherName |
Comite Europeen de Normalisation
|
Status |
Current
|
Standards | Relationship |
I.S. EN 45510-4-2:1999 | Identical |
UNE-EN 45510-4-2:2000 | Identical |
BS EN 45510-4-2:1999 | Identical |
SN EN 45510-4-2 : 1999 | Identical |
PN EN 45510-4-2 : 2011 | Identical |
CEI UNI EN 45510-4-2 : 1999 | Identical |
NF EN 45510 4-2 : 1999 | Identical |
UNI CEI EN 45510-4-2 : 1999 | Identical |
NBN EN 45510 4-2 : 1999 | Identical |
NS EN 45510-4-2 : 1ED 1999 | Identical |
NEN EN 45510-4-2 : 1999 | Identical |
DIN EN 45510-4-2:1999-06 | Identical |
EN ISO 9002:1994/AC:1997 | QUALITY SYSTEMS - SPECIFICATION FOR PRODUCTION AND INSTALLATION |
ISO 9002:1994 | Quality systems — Model for quality assurance in production, installation and servicing |
EN ISO 9001:2015 | Quality management systems - Requirements (ISO 9001:2015) |
ISO 9001:2015 | Quality management systems — Requirements |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.