Foreword
1 Scope
2 Normative references
3 Definitions
    3.1 Organizational terms
    3.2 Technical terms
    3.3 General terms Page
4 Brief overall project description
    4.1 Role and organization of purchaser
    4.2 Site location
    4.3 Equipment task
    4.4 Equipment to be purchased
    4.5 Control and instrumentation
    4.6 Electrical supplies and other services
    4.7 Other interfaces
    4.8 Project programme
    4.9 Equipment identification systems
5 Extent of supply
6 Terminal points
7 Operational requirements
    7.1 Operating environment
    7.2 Manning levels
    7.3 Normal operation
    7.4 Operating hours
    7.5 Start-up and shut-down
    7.6 Abnormal conditions
    7.7 Further operational requirements
8 Life expectancy
    8.1 Design life
    8.2 Components requiring periodic maintenance
9 Performance requirements
    9.1 Duty
    9.2 Performance
    9.3 Equipment margins
    9.4 Availability
    9.5 Levels of component redundancy
    9.6 Further performance requirements
10 Design and fabrication
    10.1 Specific equipment features
    10.2 Design justification
    10.3 Material selection
    10.4 Safety
    10.5 Interchangeability
    10.6 Fabrication methods
11 Maintenance requirements
    11.1 Planned maintenance
    11.2 Personnel safety
    11.3 Requirements for access
    11.4 Lifting requirements
    11.5 Special tools
    11.6 Test equipment
    11.7 Spare parts strategy
    11.8 Special precautions
12 Technical documentation requirements
    12.1 Tender documentation
    12.2 Contract documentation
13 Applicable legislation, regulations, standards and
    further requirements
    13.1 Legislation and regulations
    13.2 Standards
    13.3 Further requirements
14 Evaluation criteria
    14.1 General
    14.2 Technical criteria
15 Quality measures
    15.1 General
    15.2 Approvals procedure
    15.3 Inspection requirements
    15.4 Non-conformity
16 Site factors
    16.1 Access
    16.2 Facilities
    16.3 Site specific requirements
17 Verification of specified performance
    17.1 General
    17.2 Works tests
    17.3 Tests during installation and commissioning
    17.4 Technical conditions for trial run
    17.5 Functional and performance tests
Annex A (informative) Bibliography
Annex B (informative) Terminal points of supply
Annex C (informative) Schedule for performance specification
Annex D (informative) Design information to be provided by
the supplier
Annex E (informative) Maintenance schedule
Annex F (informative) Purpose and extent of documentation

This standard gives guidance on writing the technical specification for the procurement of steam turbines driving generators for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.

Committee
CEN/CLC/JTC 2
DocumentType
Standard
PublisherName
Comite Europeen de Normalisation
Status
Current

IEC 61063:1991 Acoustics - Measurement of airborne noise emitted by steam turbines and driven machinery
EN 60953-1:1995 Rules for steam turbine thermal acceptance tests - Part 1: Method A - High accuracy for large condensing steam turbines
EN 45510-8-1:1998 Guide for procurement of power station equipment - Part 8-1: Control and instrumentation
EN ISO 9002:1994/AC:1997 QUALITY SYSTEMS - SPECIFICATION FOR PRODUCTION AND INSTALLATION
ISO 8402:1994 Quality management and quality assurance — Vocabulary
EN 45510-8-1:1998 GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 8-1: CONTROL AND INSTRUMENTATION
ISO 9002:1994 Quality systems — Model for quality assurance in production, installation and servicing
EN 60953-2:1995 Rules for steam turbine thermal acceptance tests - Part 2: Method B - Wide range of accuracy for various types and sizes of turbines
IEC 60953-1:1990 Rules for steam turbine thermal acceptance tests. Part 1: Method A - High accuracy for large condensing steam turbines
EN ISO 9001:2015 Quality management systems - Requirements (ISO 9001:2015)
ISO 9001:2015 Quality management systems — Requirements
IEC 60953-2:1990 Rules for steam turbine thermal acceptance tests. Part 2: Method B - Wide range of accuracy for various types and sizes of turbines
EN ISO 8402 : 1995 QUALITY MANAGEMENT AND QUALITY ASSURANCE - VOCABULARY
EN 60045-1:1993 Steam turbines - Part 1: Specifications
ISO 128:1982 Technical drawings — General principles of presentation
ISO 7200:2004 Technical product documentation — Data fields in title blocks and document headers

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.