• EN 45510-5-1 : 1998

    Current The latest, up-to-date edition.

    GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 5-1: STEAM TURBINES

    Available format(s): 

    Language(s): 

    Published date:  21-01-1998

    Publisher:  European Committee for Standards - Electrical

    Pure ENs are not available for sale, please purchase a suitable national adoption

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Foreword
    1 Scope
    2 Normative references
    3 Definitions
        3.1 Organizational terms
        3.2 Technical terms
        3.3 General terms Page
    4 Brief overall project description
        4.1 Role and organization of purchaser
        4.2 Site location
        4.3 Equipment task
        4.4 Equipment to be purchased
        4.5 Control and instrumentation
        4.6 Electrical supplies and other services
        4.7 Other interfaces
        4.8 Project programme
        4.9 Equipment identification systems
    5 Extent of supply
    6 Terminal points
    7 Operational requirements
        7.1 Operating environment
        7.2 Manning levels
        7.3 Normal operation
        7.4 Operating hours
        7.5 Start-up and shut-down
        7.6 Abnormal conditions
        7.7 Further operational requirements
    8 Life expectancy
        8.1 Design life
        8.2 Components requiring periodic maintenance
    9 Performance requirements
        9.1 Duty
        9.2 Performance
        9.3 Equipment margins
        9.4 Availability
        9.5 Levels of component redundancy
        9.6 Further performance requirements
    10 Design and fabrication
        10.1 Specific equipment features
        10.2 Design justification
        10.3 Material selection
        10.4 Safety
        10.5 Interchangeability
        10.6 Fabrication methods
    11 Maintenance requirements
        11.1 Planned maintenance
        11.2 Personnel safety
        11.3 Requirements for access
        11.4 Lifting requirements
        11.5 Special tools
        11.6 Test equipment
        11.7 Spare parts strategy
        11.8 Special precautions
    12 Technical documentation requirements
        12.1 Tender documentation
        12.2 Contract documentation
    13 Applicable legislation, regulations, standards and
        further requirements
        13.1 Legislation and regulations
        13.2 Standards
        13.3 Further requirements
    14 Evaluation criteria
        14.1 General
        14.2 Technical criteria
    15 Quality measures
        15.1 General
        15.2 Approvals procedure
        15.3 Inspection requirements
        15.4 Non-conformity
    16 Site factors
        16.1 Access
        16.2 Facilities
        16.3 Site specific requirements
    17 Verification of specified performance
        17.1 General
        17.2 Works tests
        17.3 Tests during installation and commissioning
        17.4 Technical conditions for trial run
        17.5 Functional and performance tests
    Annex A (informative) Bibliography
    Annex B (informative) Terminal points of supply
    Annex C (informative) Schedule for performance specification
    Annex D (informative) Design information to be provided by
    the supplier
    Annex E (informative) Maintenance schedule
    Annex F (informative) Purpose and extent of documentation

    Abstract - (Show below) - (Hide below)

    Provides guidance on writing the technical specification for procuring steam turbines driving generators, to be used in electricity generating stations (power stations).

    General Product Information - (Show below) - (Hide below)

    Committee TC 2
    Document Type Guide
    Publisher European Committee for Standards - Electrical
    Status Current

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 61063:1991 Acoustics - Measurement of airborne noise emitted by steam turbines and driven machinery
    EN 60953-1:1995 Rules for steam turbine thermal acceptance tests - Part 1: Method A - High accuracy for large condensing steam turbines
    EN ISO 9002:1994/AC:1997 QUALITY SYSTEMS - SPECIFICATION FOR PRODUCTION AND INSTALLATION
    ISO 8402:1994 Quality management and quality assurance — Vocabulary
    EN 45510-8-1:1998 GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 8-1: CONTROL AND INSTRUMENTATION
    ISO 9002:1994 Quality systems — Model for quality assurance in production, installation and servicing
    EN 60953-2:1995 Rules for steam turbine thermal acceptance tests - Part 2: Method B - Wide range of accuracy for various types and sizes of turbines
    IEC 60953-1:1990 Rules for steam turbine thermal acceptance tests. Part 1: Method A - High accuracy for large condensing steam turbines
    EN ISO 9001:2015 Quality management systems - Requirements (ISO 9001:2015)
    ISO 9001:2015 Quality management systems — Requirements
    IEC 60953-2:1990 Rules for steam turbine thermal acceptance tests. Part 2: Method B - Wide range of accuracy for various types and sizes of turbines
    EN ISO 8402 : 1995 QUALITY MANAGEMENT AND QUALITY ASSURANCE - VOCABULARY
    EN 60045-1:1993 Steam turbines - Part 1: Specifications
    ISO 128:1982 Technical drawings — General principles of presentation
    ISO 7200:2004 Technical product documentation — Data fields in title blocks and document headers
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective