GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - WIND TURBINES

Published date

21-01-1998

Sorry this product is not available in your region.

Foreword
1 Scope
2 Normative references
3 Definitions
    3.1 Organizational terms
    3.2 Technical terms
    3.3 General terms
4 Brief overall project description
    4.1 Role and organization of purchaser
    4.2 Site location
    4.3 Equipment task
    4.4 Equipment to be purchased
    4.5 Control and instrumentation
    4.6 Electrical supplies and other services
    4.7 Other interfaces
    4.8 Project programme
    4.9 Equipment identification systems
5 Extent of supply
6 Terminal points
7 Operational requirements
    7.1 Operating environment
    7.2 Manning levels
    7.3 Normal operation
    7.4 Operating hours
    7.5 Start-up and shut-down
    7.6 Abnormal conditions
    7.7 Further operational requirements
8 Life expectancy
    8.1 Design life
    8.2 Components requiring periodic maintenance
9 Performance requirements
    9.1 Duty
    9.2 Performance
    9.3 Equipment margins
    9.4 Availability
    9.5 Levels of component redundancy
    9.6 Further performance requirements
10 Design and fabrication
    10.1 Specific equipment features
    10.2 Design justification
    10.3 Material selection
    10.4 Safety
    10.5 Interchangeability
    10.6 Fabrication methods
11 Maintenance requirements
    11.1 Planned maintenance
    11.2 Personnel safety
    11.3 Requirements for access
    11.4 Lifting requirements
    11.5 Special tools
    11.6 Test equipment
    11.7 Spare parts strategy
    11.8 Special precautions
12 Technical documentation requirements
    12.1 Tender documentation
    12.2 Contract documentation
13 Applicable legislation, regulations, standards and
    further requirements
    13.1 Legislation and regulations
    13.2 Standards
    13.3 Further requirements
14 Evaluation criteria
    14.1 General
    14.2 Technical criteria
15 Quality measures
    15.1 General
    15.2 Approvals procedure
    15.3 Inspection requirements
    15.4 Non-conformity
16 Site factors
    16.1 Access
    16.2 Facilities
    16.3 Site specific requirements
17 Verification of specified performance
    17.1 General
    17.2 Works tests
    17.3 Tests during installation and commissioning
    17.4 Technical conditions for trial run
    17.5 Functional and performance tests
Annex A (informative) Bibliography

This standard gives guidance on writing the technical specifications for the procurement of wind turbines for use in electrity generating stations (wind power stations.

Committee
TC 2
DocumentType
Guide
PublisherName
European Committee for Standards - Electrical
Status
Current

TR 102 532 : 1.2.1 ENVIRONMENTAL ENGINEERING (EE); THE USE OF ALTERNATIVE ENERGY SOLUTIONS IN TELECOMMUNICATION INSTALLATIONS

EN ISO 9002:1994/AC:1997 QUALITY SYSTEMS - SPECIFICATION FOR PRODUCTION AND INSTALLATION
EN ISO 9001:2015 Quality management systems - Requirements (ISO 9001:2015)
IEC 61400-1:2005+AMD1:2010 CSV Wind turbines - Part 1: Design requirements

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.