EN 60255-22-4:2008
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 22-4: ELECTRICAL DISTURBANCE TESTS - ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST
01-09-2013
12-01-2013
FOREWORD
1 Scope and object
2 Normative references
3 Terms and definitions
4 Test severity level
5 Test equipment
6 Test set-up
6.1 Test set-up using CDNs
6.2 Test set-up using the capacitive coupling clamp
7 Test procedure
8 Criteria for acceptance
9 Test report
Annex A (informative) - Background information for fast
transient/burst immunity test
Annex B (informative) - Examples of environments for Class A
and Class B test levels
Annex ZA (normative) - Normative references to international
publications with their corresponding
European publications
Describes the general requirements for electrical fast transient immunity tests for measuring relays and protection equipment for power system protection, including the control, monitoring and process interface equipment used with these systems.
Committee |
SR 95
|
DocumentType |
Standard
|
PublisherName |
European Committee for Standards - Electrical
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
CEI EN 60255-22-4 : 2010 | Identical |
DIN EN 60255-22-4 : 2009 | Identical |
PN EN 60255-22-4 : 2010 | Identical |
I.S. EN 60255-22-4:2008 | Identical |
BS EN 60255-22-4:2008 | Identical |
NF EN 60255-22-4 : 2008 | Identical |
IEC 60255-22-4:2008 | Identical |
VDE 0435-3024 : 2009 | Identical |
UNE-EN 60255-22-4:2008 | Identical |
NBN EN 60255 22-4 : 2008 | Identical |
NEN EN IEC 60255-22-4 : 2008 | Identical |
BS EN 60255-1:2010 | Measuring relays and protection equipment Common requirements |
CEI EN 60255-1 : 2011 | MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 1: COMMON REQUIREMENTS |
UNE-EN 60255-1:2010 | Measuring relays and protection equipment -- Part 1: Common requirements |
I.S. EN 60255-1:2010 | MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 1: COMMON REQUIREMENTS |
EN 60255-1:2010 | Measuring relays and protection equipment - Part 1: Common requirements |
IEC 61000-4-4:2012 RLV | Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test |
EN 60255-6 : 94 AC 95 | ELECTRICAL RELAYS - MEASURING RELAYS AND PROTECTION EQUIPMENT |
IEC 60255-6:1988 | Electrical relays - Part 6: Measuring relays and protection equipment |
EN 61000-4-4:2012 | ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-4: TESTING AND MEASUREMENT TECHNIQUES - ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST (IEC 61000-4-4:2012) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.