ENA TS 41-24 : ISSUE 1 ADD 2009
Current
Current
The latest, up-to-date edition.
GUIDELINES FOR THE DESIGN, INSTALLATION, TESTING AND MAINTENANCE OF MAIN EARTHING SYSTEMS IN SUBSTATIONS
Published date
12-01-2013
Publisher
Sorry this product is not available in your region.
1. FOREWORD
2. SCOPE
3. DEFINITIONS
4. FUNCTION OF AN EARTHING SYSTEM
5. FEATURES OF AN EARTHING SYSTEM
6. SAFETY CRITERIA
7. DESIGN ARRANGEMENT
8. DESIGN DATA
9. DESIGN ASSESSMENT
10. INSTALLATION
11. ITEMS REQUIRING SPECIAL CONSIDERATION
12. TESTING
13. MAINTENANCE
14. EXAMPLES
15. EARTHING ASSOCIATED WITH HV
DISTRIBUTION OVERHEAD LINE NETWORKS
(EXCLUDING TOWER LINES & POLE TRANSFORMERS)
Appendices
Applies to fixed earthing systems for all supply systems and equipment earthing within EHV, HV/L and MV/LV substations.
| DocumentType |
Standard
|
| PublisherName |
Energy Networks Association (UK)
|
| Status |
Current
|
| Supersedes |
| ENA ER G81-4 : ISSUE 3 2016 | FRAMEWORK FOR NEW INDUSTRIAL AND COMMERCIAL UNDERGROUND CONNECTIONS - PART 4: DESIGN AND PLANNING |
| ENA ER G81-3 : ISSUE 2 2016 | FRAMEWORK FOR NEW LOW VOLTAGE HOUSING DEVELOPMENT INSTALLATIONS - PART 3: INSTALLATION AND RECORDS |
| ENA ER G12 : ISSUE 4 AMD 1 2015 | REQUIREMENTS FOR THE APPLICATION OF PROTECTIVE MULTIPLE EARTHING TO LOW VOLTAGE NETWORKS |
| ENA ER G81-6 : ISSUE 2 2016 | FRAMEWORK FOR NEW INDUSTRIAL AND COMMERCIAL UNDERGROUND CONNECTIONS - PART 6: INSTALLATION AND RECORDS |
| ENA ER G81-2 : ISSUE 2 2016 | FRAMEWORK FOR NEW LOW VOLTAGE HOUSING DEVELOPMENT INSTALLATIONS - PART 2: MATERIALS SPECIFICATION |
| ENA ER G81-1 : ISSUE 3 2016 | FRAMEWORK FOR NEW LOW VOLTAGE HOUSING DEVELOPMENT INSTALLATIONS - PART 1: DESIGN AND PLANNING |
| ENA ER G81-5 : ISSUE 2 2016 | FRAMEWORK FOR NEW INDUSTRIAL AND COMMERCIAL UNDERGROUND CONNECTIONS - PART 5: MATERIALS SPECIFICATION |
Summarise
Sorry this product is not available in your region.