ETSI TR 102 615 V1.1.1 (2008-02)
Current
The latest, up-to-date edition.
PowerLine Telecommunications (PLT); PlugtestsTM 2007 on coexistence between PLT modem systems; Test cases
Hardcopy , PDF
English
01-02-2008
Intellectual Property Rights
Foreword
Introduction
1 Scope
2 References
2.1 Normative references
2.2 Informative references
3 Abbreviations
4 General Test Conditions, Traffic Generation and Traffic
Monitoring
4.1 Coupling and Decoupling of the PLC-Signal
4.2 Shielding of the Test Set-up
5 Tests with one PLT system
5.1 CDCF Timing - Comparison with Simulation Model
5.2 CDCF - PSD
5.3 CDCF Timing - Sync Point and AC line cycle
5.4 CDCF Timing - Burst
6 Tests with more PLT systems
6.1 CDCF reception in dependence of attenuation
6.2 CDCF reception in the presence of a narrowband
disturbance source
6.3 CDCF reception in the presence of a broadband
disturbance source
6.4 Coexistence - Slot allocation
6.5 Coexistence - Frequency allocation
6.6 System Join Process
6.7 Throughput
6.8 Hidden Node Situation
History
Applies to PLT modems (Access and Inhouse), in which the coexistence mechanisms are at least partly implemented.
| DocumentType |
Technical Report
|
| Pages |
21
|
| PublisherName |
European Telecommunications Standards Institute
|
| Status |
Current
|
| IEC 61000-4-4:2012 RLV | Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.