• Shopping Cart
    There are no items in your cart

ETSI TR 102 615 V1.1.1 (2008-02)

Current

Current

The latest, up-to-date edition.

PowerLine Telecommunications (PLT); PlugtestsTM 2007 on coexistence between PLT modem systems; Test cases

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-02-2008

Free

Intellectual Property Rights
Foreword
Introduction
1 Scope
2 References
  2.1 Normative references
  2.2 Informative references
3 Abbreviations
4 General Test Conditions, Traffic Generation and Traffic
  Monitoring
  4.1 Coupling and Decoupling of the PLC-Signal
  4.2 Shielding of the Test Set-up
5 Tests with one PLT system
  5.1 CDCF Timing - Comparison with Simulation Model
  5.2 CDCF - PSD
  5.3 CDCF Timing - Sync Point and AC line cycle
  5.4 CDCF Timing - Burst
6 Tests with more PLT systems
  6.1 CDCF reception in dependence of attenuation
  6.2 CDCF reception in the presence of a narrowband
      disturbance source
  6.3 CDCF reception in the presence of a broadband
      disturbance source
  6.4 Coexistence - Slot allocation
  6.5 Coexistence - Frequency allocation
  6.6 System Join Process
  6.7 Throughput
  6.8 Hidden Node Situation
History

Applies to PLT modems (Access and Inhouse), in which the coexistence mechanisms are at least partly implemented.

DocumentType
Technical Report
Pages
21
PublisherName
European Telecommunications Standards Institute
Status
Current

IEC 61000-4-4:2012 RLV Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test

Access your standards online with a subscription

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Free