HB 103-1997 (CJC 7)
Current
The latest, up-to-date edition.
Coordination of power and telecommunications - Crossings code - The arrangement of overhead power and telecommunications lines, pole stay wires, and suspension wires
Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users
05-09-1997
Note - due to the age of this archived document, available information is limited therefore this record is incomplete. For further details, please phone our Customer Service Centre on 131 242 (Intl +61 2 8206 6010) or email sales@saiglobal.com.
This publication is a copy of the physical archived hardcopy. Some pages may be stamped or contain handwriting. SAI Global has endeavoured to reproduce this document to the best possible standard of quality. Please utilise the preview feature to sample the quality before purchasing.
Sets out, in Sections covering responsibilities and engineering practices, the requirements for common use services crossings on a Telstra or Electricity Utility pole; for crossings of stay wires supporting such poles; for in-span services crossings; and for street light suspension wires crossing power or telecommunications services. Identical with the 1988 ATC/ESAA publication Crossings Code.
Committee |
ET/7
|
DocumentType |
Handbook
|
ISBN |
0 7337 1348 3
|
Pages |
38
|
PublisherName |
Standards Australia
|
Status |
Current
|
First published by ESAA and ATC as TPH 2563(E)EP 1988.
Reset and redesignated SAA HB103-1997 (CJC 7).
HB 331-2012 | Overhead line design |
AS 2067-2008 | Substations and high voltage installations exceeding 1 kV a.c. |
AS 2067:2016 | Substations and high voltage installations exceeding 1 kV a.c. |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.