• HB 219:2006

    Current The latest, up-to-date edition.

    Earth potential rise - Protection of telecommunications network users, personnel and plant - Worked examples for the application guide (Reconfirmed 2020)

    Available format(s):  Hardcopy, PDF 1 User, PDF 3 Users, PDF 5 Users, PDF 9 Users

    Language(s):  English

    Published date:  24-11-2006

    Publisher:  Standards Australia

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    SECTION 1 SCOPE AND GENERAL 1.1 SCOPE 1.2 APPLICATIONSECTION 2 REFERENCED DOCUMENTSSECTION 3 WORKED EXAMPLES OF EPR CALCULATIONS 3.1 INTRODUCTION TO CALCULATIONS 3.2 RURAL DISTRIBUTION TRANSFORMER SUPPLIED BY HV OVERHEAD LINE 3.3 11 kV AND 22 kV CONCRETE OR STEEL POLES 3.4 33 kV CONCRETE OR STEEL POLES 3.5 ISOLATED URBAN MEN SYSTEM (NEW SUBDIVISION) SUPPLIED BY OVERHEAD LINE 3.6 EXTENSIVE URBAN MEN SYSTEM SUPPLIED BY HV OVERHEAD LINE 3.7 EXTENSIVE URBAN MEN SYSTEM SUPPLIED BY HV BURIED CABLE 3.8 33/11 kV SUBSTATIONSECTION 4 DERIVATION OF TYPICAL MEN IMPEDANCE VALUES FOR URBAN MEN NETWORKS 4.1 TYPICAL URBAN EXTENSIVE INTERCONNECTED MEN NETWORK 4.2 TYPICAL ISOLATED URBAN 48 CUSTOMER MEN NETWORKSECTION 5 EPR TESTS 5.1 EPR TEST AT 132 kV CONDUCTIVE POLEBIBLIOGRAPHY

    Abstract - (Show below) - (Hide below)

    Provides some worked examples that supplement the understanding of AS/NZS3835.2, Earth potential rise-Protection of telecommunications network users, personnel and plant, Part2: Application guide.

    Scope - (Show below) - (Hide below)

    This Handbook provides worked examples of EPR calculations supporting AS/NZS 3835.2, Earth potential rise - Protection of telecommunications network users, personnel and plant, Part 2: Application guide.

    General Product Information - (Show below) - (Hide below)

    Committee ET-007
    Document Type Handbook
    Product Note Reconfirmed 21/08/2020.
    This standard has been reconfirmed in Australia in 2020 and remains current in New Zealand. Reconfirmation Notice 21/08/2020
    Publisher Standards Australia
    Status Current
    Supersedes

    History - (Show below) - (Hide below)

    First published 2006.
    Reconfirmed 2020. First published as HB 219:2006.

    Standards Referenced By This Book - (Show below) - (Hide below)

    AS/NZS 3835.1:2006 Earth potential rise - Protection of telecommunications network users, personnel and plant Code of practice
    AS/NZS 3835.2:2006 Earth potential rise - Protection of telecommunications network users, personnel and plant Application guide

    Standards Referencing This Book - (Show below) - (Hide below)

    HB 331-2012 Overhead line design
    AS 2067-2008 Substations and high voltage installations exceeding 1 kV a.c.
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective