I.S. EN 100114-1:1997
Current
The latest, up-to-date edition.
RULE OF PROCEDURE - QUALITY ASSESSMENT PROCEDURES - PART 1: CECC REQUIREMENTS FOR THE APPROVAL OF AN ORGANIZATION
Hardcopy , PDF
English
01-01-1997
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
Dates of withdrawal of national standards are available from NSAI.
Section I: Organization approval of manufacturers,
distributors and specialist contractors
0 Introduction
1 Scope
2 Normative references
3 Definitions
4 Quality-system requirements
4.2 Quality system
4.3 Contract review
4.4 Design control
4.6 Purchasing
4.7 Control of customer-supplied product
4.8 Product identification and traceability
4.9 Process control
4.10 Inspection and testing
4.11 Control of inspection, measuring and test
equipment
4.12 Inspection and test status
4.13 Control of non-conforming product
4.15 Handling, storage, packaging, preservation
and delivery
4.16 Control of quality records
4.19 Servicing
4.20 Statistical techniques
Section II: Organization approval of independent test
laboratories
0 Introduction
1 Object and field of application
2 Definitions
5 Technical competence
5.1 Management and organization
5.4 Working procedure
Annex A: Requirements for organizations' CECC system managers
Annex B: Subcontracting in the CECC system
B.1 Introduction
B.2 Subcontracting to manufacturers or specialist
contractors with CECC approval
B.3 Subcontracting to a remote site which is part of
the same parent organization (EMA)
B.4 Use of unapproved subcontractors
B.5 Sharing of test facilities
Annex C: CECC policy on uncertainty of measurement and inset
limits
C.1 Objective
C.2 Definitions
C.3 Calculation of Measurement Uncertainty
C.4 Policy
C.5 Calculation of Inset and Outset Limits
C.6 Examples
C.7 References (Information only)
Provides the information for use by manufacturers, distributors and specialist contractors operating in the field of electronic components, who wish to obtain quality system approval for an organization under the CECC System.
DocumentType |
Standard
|
Pages |
24
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Current
|
Standards | Relationship |
NEN EN 100114-1 : 1997 | Identical |
EN 100114-1 : 1996 | Identical |
NF EN 100114-1 : 1996 | Identical |
SN EN 100114-1 : 1996 | Identical |
BS EN 100114-1:1997 | Identical |
DIN EN 100114-1:1996-11 | Identical |
DIN EN 100114-1:1994-10 | Identical |
EN 30012-1 : 1993 | QUALITY ASSURANCE REQUIREMENTS FOR MEASURING EQUIPMENT - METROLOGICAL CONFIRMATION SYSTEM FOR MEASURING EQUIPMENT |
EN ISO 9002:1994/AC:1997 | QUALITY SYSTEMS - SPECIFICATION FOR PRODUCTION AND INSTALLATION |
ISO 8402:1994 | Quality management and quality assurance — Vocabulary |
ECMA 181 : 1992 | UNCERTAINTY OF MEASUREMENT AS APPLIED TO TYPE APPROVAL OF PRODUCTS |
EN ISO 9001:2015 | Quality management systems - Requirements (ISO 9001:2015) |
EN 28402 : 1991 | QUALITY - VOCABULARY |
ISO 9001:2015 | Quality management systems — Requirements |
CECC 00401 : 91 AMD 1 | GLOSSARY OF ABBREVIATIONS, TERMS AND DEFINITIONS OF THE CECC SYSTEM |
ISO 10012-1:1992 | Quality assurance requirements for measuring equipment Part 1: Metrological confirmation system for measuring equipment |
EN 45001 : 1989 | GENERAL CRITERIA FOR THE OPERATION OF TESTING LABORATORIES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.