• I.S. EN 61850-5:2013

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS (IEC 61850-5:2013 (EQV))

    Available format(s):  Hardcopy, PDF

    Superseded date:  05-06-2022

    Language(s):  English

    Published date:  31-12-2012

    Publisher:  National Standards Authority of Ireland

    For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
    Only cited Standards give presumption of conformance to New Approach Directives/Regulations.

    Dates of withdrawal of national standards are available from NSAI.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    FOREWORD
    INTRODUCTION
    1 Scope
    2 Normative references
    3 Terms and definitions
    4 Abbreviations
    5 Power utility automation functions
    6 Goal and requirements
    7 Categories of functions
    8 Function description and function requirements
    9 The application concept for logical nodes
    10 System description and system requirements
    11 Performance requirements
    12 Additional requirements for the data model
    Annex A (informative) - Logical nodes and related
            PICOMs
    Annex B (informative) - PICOM identification and
            message classification
    Annex C (informative) - Communication optimization
    Annex D (informative) - Rules for function definition
    Annex E (informative) - Interaction of functions and
            logical nodes
    Annex F (informative) - Functions
    Annex G (informative) - Results from function description
    Annex H (informative) - Substation configurations
    Annex I (informative) - Examples for protection functions
            in compensated networks
    Bibliography
    Annex ZA (normative) - Normative references to international
             publications with their corresponding European
             publications

    Abstract - (Show below) - (Hide below)

    Pertains to power utility automation systems with the core part of substation automation systems (SAS).

    General Product Information - (Show below) - (Hide below)

    Development Note For CENELEC adoptions of IEC publications, please check www.iec.ch to be sure that you have any corrigenda that may apply. (01/2017)
    Document Type Standard
    Publisher National Standards Authority of Ireland
    Status Superseded
    Superseded By
    Supersedes

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 61000-4-30 : 3.0EN+(REDLINE+VERSION) ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS
    IEC 61000-4-15 : 2.0 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-15: TESTING AND MEASUREMENT TECHNIQUES - FLICKERMETER - FUNCTIONAL AND DESIGN SPECIFICATIONS
    EN 61850-6:2010 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
    IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
    IEC 61850-6:2009 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
    IEC 60870-4:1990 Telecontrol equipment and systems. Part 4: Performance requirements
    IEC TR 61850-1:2013 Communication networks and systems for power utility automation - Part 1: Introduction and overview
    IEC 60834-2:1993 Performance and testing of teleprotection equipment of power systems - Part 2: Analogue comparison systems
    IEC 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
    IEC TR 61850-90-1:2010 Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations
    IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
    IEC 61850-7-3:2010 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
    IEC TR 61850-7-510:2012 Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines
    IEC 61850-10:2012 Communication networks and systems for power utility automation - Part 10: Conformance testing
    IEC TS 61850-2:2003 Communication networks and systems in substations - Part 2: Glossary
    EN 61000-4-15:2011 Electromagnetic compatibility (EMC) - Part 4-15: Testing and measurement techniques - Flickermeter - Functional and design specifications
    IEC 61850-3:2013 Communication networks and systems for power utility automation - Part 3: General requirements
    IEC 60834-1:1999 Teleprotection equipment of power systems - Performance and testing - Part 1: Command systems
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective