IEC TS 61850-2:2003
|
Communication networks and systems in substations - Part 2: Glossary |
I.S. EN 62271-3:2015
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
12/30274900 DC : 0
|
BS IEC 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS |
PD IEC/TR 61850-80-3:2015
|
Communication networks and systems for power utility automation Mapping to web protocols. Requirements and technical choices |
PD IEC/TR 61850-7-500:2017
|
Communication networks and systems for power utility automation Basic information and communication structure. Use of logical nodes for modeling application functions and related concepts and guidelines for substations |
PD IEC/TR 61850-90-1:2010
|
Communication networks and systems for power utility automation Use of IEC 61850 for the communication between substations |
I.S. EN 61850-7-2:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
BS EN 61850-6:2010
|
Communication networks and systems for power utility automation Configuration description language for communication in electrical substations related to IEDs |
IEEE C37.238-2011
|
USE OF IEEE 1588 PRECISION TIME PROTOCOL IN POWER SYSTEM APPLICATIONS |
CEI EN 61850-7-2 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
IEC TR 62689-100:2016
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 100: Requirements and proposals for the IEC 61850 series data model extensions to support fault passage indicators applications |
CEI EN 61850-8-1 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
IEC TR 61850-90-1:2010
|
Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations |
IEC 61850-6:2009
|
Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
GOST R IEC 61850-3 : 2005
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 3 - GENERAL REQUIREMENTS |
NF EN 61850-6 : 2004
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
EN 61850-10:2013
|
Communication networks and systems for power utility automation - Part 10: Conformance testing |
EN 62271-3:2015
|
High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
EN 61850-6:2010
|
Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
BS EN 61850-7-4:2010
|
Communication networks and systems for power utility automation Basic communication structure. Compatible logical node classes and data object classes |
IEEE 1547.3 : 2007
|
MONITORING, INFORMATION EXCHANGE, AND CONTROL OF DISTRIBUTED RESOURCES INTERCONNECTED WITH ELECTRIC POWER SYSTEMS |
PD IEC/TR 61850-90-12:2015
|
Communication networks and systems for power utility automation Wide area network engineering guidelines |
02/206919 DC : DRAFT MAY 2002
|
IEC 61850-8-1. ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO MMS (ISO/IEC 9506 PART 1 AND PART 2) OVER ISO 8802-3 |
03/304152 DC : DRAFT MAR 2003
|
IEC 61850-10 ED.1.0 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 10: CONFORMANCE TESTING |
I.S. EN 61400-25-2:2015
|
WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
CEI EN 61850-10 : 2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
17/30358470 DC : 0
|
BS EN 61850-8-2 ED1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP) |
BS EN 61400-25-2:2015
|
Wind turbines Communications for monitoring and control of wind power plants - Information models |
09/30212527 DC : 0
|
BS EN 61850-7-410 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
12/30260040 DC : 0
|
BS EN 62270 - GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION |
04/30092543 DC : DRAFT MAR 2004
|
|
IEEE C37.119-2005
|
GUIDE FOR BREAKER FAILURE PROTECTION OF POWER CIRCUIT BREAKERS |
I.S. EN 61850-7-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011 (EQV)) |
IEC TR 61850-1:2013
|
Communication networks and systems for power utility automation - Part 1: Introduction and overview |
07/30168422 DC : 0
|
BS EN 61850-8-1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
BS EN 62271-3:2015
|
High-voltage switchgear and controlgear Digital interfaces based on IEC 61850 |
PD IEC/TR 61850-7-510:2012
|
Communication networks and systems for power utility automation Basic communication structure. Hydroelectric power plants. Modelling concepts and guidelines |
IEC 61869-9:2016
|
Instrument transformers - Part 9: Digital interface for instrument transformers |
PD IEC TR 61850-90-3:2016
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 90-3: USING IEC 61850 FOR CONDITION MONITORING DIAGNOSIS AND ANALYSIS |
I.S. EN 61850-6:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
PD IEC/TR 61850-1:2013
|
Communication networks and systems for power utility automation Introduction and overview |
PD IEC/TR 62689-100:2016
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes Requirements and proposals for the IEC 61850 series data model extensions to support fault passage indicators applications |
12/30267268 DC : 0
|
BS EN 61869-9 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 9: DIGITAL INTERFACE FOR INSTRUMENT TRANSFORMERS |
PD IEC/TR 61850-90-4:2013
|
Communication networks and systems for power utility automation Network engineering guidelines |
02/206918 DC : DRAFT MAY 2002
|
IEC 61850-6. ED.1 - COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 6: SUBSTATION AUTOMATION SYSTEM CONFIGURATION DESCRIPTION LANGUAGE |
DD IEC/TS 61850-2:2003
|
Communication networks and systems in substations Glossary |
12/30265386 DC : 0
|
BS EN 62271-3 ED 2 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
11/30251804 DC : 0
|
BS EN 61850-10 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING |
16/30336107 DC : 0
|
BS EN 61850-7-4 AMD1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
BS EN 61850-7-1:2011
|
Communication networks and systems for power utility automation Basic communication structure. Principles and models |
15/30326344 DC : 0
|
BS EN 61850-8-2 ED 1.0 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPING TO EXTENSIBLE MESSAGING PRESENCE PROTOCOL (XMPP) |
IEC TR 61850-7-510:2012
|
Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines |
CEI EN 61400-25-5 : 2007
|
WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
I.S. EN 61850-7-4:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
CEI EN 61850-7-4 : 2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
IEC TR 61850-90-3:2016
|
Communication networks and systems for power utility automation - Part 90-3: Using IEC 61850 for condition monitoring diagnosis and analysis |
IEC 62270:2013
|
Guide for computer-based control for hydroelectric power plant automation |
NF EN 61850-7-2 : 2003
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-2: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
EN 61850-7-4:2010
|
Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
EN 61850-7-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011) |
BS EN 61850-10:2013
|
Communication networks and systems for power utility automation Conformance testing |
CEI EN 61850-7-1 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS |
07/30147754 DC : 0
|
BS IEC 61850-6 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
07/30166755 DC : 0
|
BS EN 61850-7-4 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES |
BS EN 61850-7-2:2010
|
Communication networks and systems for power utility automation Basic information and communication structure. Abstract communication service interface (ACSI) |
IEC TR 61850-7-500:2017
|
Communication networks and systems for power utility automation - Part 7-500: Basic information and communication structure - Use of logical nodes for modeling application functions and related concepts and guidelines for substations |
I.S. EN 61850-10:2013
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV)) |
NF EN 61850-7-4 : 2003
|
COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 7-4: BASIC COMMUNICATION STRUCTURE FOR SUBSTATION AND FEEDER EQUIPMENT - COMPATIBLE LOGICAL NODE CLASSES AND DATA CLASSES |
I.S. EN 61850-8-1:2011
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
IEC TR 61850-80-3:2015
|
Communication networks and systems for power utility automation - Part 80-3: Mapping to web protocols - Requirements and technical choices |
IEC 61850-7-4:2010
|
Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 61850-7-2:2010
|
Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEC 61400-25-2:2015
|
Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
IEC 61850-7-1:2011
|
Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC 62271-3:2015
|
High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
EN 61850-8-1:2011
|
Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
EN 61850-7-2:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
07/30166751 DC : 0
|
BS EN 61850-7-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
06/30145429 DC : DRAFT MAY 2006
|
|
PD IEC/TR 61850-90-2:2016
|
Communication networks and systems for power utility automation Using IEC 61850 for communication between substations and control centres |
05/30137813 DC : DRAFT AUG 2005
|
IEC 61400-25-5 ED 1 - WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
08/30182501 DC : DRAFT MAY 2008
|
BS EN 61850-7-1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS |
BS EN 61850-8-1:2011
|
Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEEE 1815.1-2015
|
EXCHANGING INFORMATION BETWEEN NETWORKS IMPLEMENTING IEC 61850 AND IEEE STD 1815 [TM] [DISTRIBUTED NETWORK PROTOCOL (DNP3)] |
CEI EN 61850-6 : 2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
IEEE 1249 : 2013
|
GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION |
IEEE 2030.100:2017
|
IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control |
IEC TR 61850-90-2:2016
|
Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres |
IEC 61850-8-1:2011
|
Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61850-10:2012
|
Communication networks and systems for power utility automation - Part 10: Conformance testing |
EN 61400-25-2:2015
|
Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |