CEI 301-3 : 2005
|
GUIDE FOR THE CHARACTERISATION AND IDENTIFICATION OF VARIABLE SPEED ELECTRICAL DRIVES BY MEANS OF A PLATE |
09/30214359 DC : 0
|
BS EN 50533 - RAILWAY APPLICATIONS - THREE-PHASE TRAIN LINE VOLTAGE CHARACTERISTICS |
BS EN 50533 : 2011
|
RAILWAY APPLICATIONS - THREE-PHASE TRAIN LINE VOLTAGE CHARACTERISTICS |
BS EN 61287-1:2014
|
RAILWAY APPLICATIONS - POWER CONVERTORS INSTALLED ON BOARD ROLLING STOCK - PART 1: CHARACTERISTICS AND TEST METHODS |
08/30189631 DC : DRAFT SEP 2008
|
BS EN 50215 - RAILWAY APPLICATIONS - ROLLING STOCK - TESTING OF ROLLING STOCK ON COMPLETION OF CONSTRUCTION AND BEFORE ENTRY INTO SERVICE |
I.S. CLC TS 50502:2007
|
RAILWAY APPLICATIONS - ROLLING STOCK - ELECTRIC EQUIPMENT IN TROLLEY BUSES - SAFETY REQUIREMENTS AND CONNECTION SYSTEMS |
UNE-EN 61287-1:2015
|
Railway applications - Power converters installed on board rolling stock - Part 1: Characteristics and test methods |
CEI EN 50215 : 2011
|
RAILWAY APPLICATIONS - ROLLING STOCK - TESTING OF ROLLING STOCK ON COMPLETION OF CONSTRUCTION AND BEFORE ENTRY INTO SERVICE |
UNE-EN 1870-13:2008
|
Safety of woodworking machines - Circular sawing machines - Part 13: Horizontal beam panel sawing machines |
UNE-EN 61377:2016
|
Railway applications - Rolling stock - Combined test method for traction systems |
BS EN 50215:2009
|
Railway applications — Rolling stock — Testing of rolling stock on completion of construction and before entry into service |
BS EN 61377:1997
|
RAILWAY APPLICATIONS - ROLLING STOCK - COMBINED TEST METHOD FOR TRACTION SYSTEMS |
05/30133277 DC : DRAFT MAY 2005
|
|
CLC/TS 50502:2008
|
Railway applications - Rolling stock - Electric equipment in trolley buses - Safety requirements and connection systems |
I.S. EN 50215:2009
|
RAILWAY APPLICATIONS - ROLLING STOCK - TESTING OF ROLLING STOCK ON COMPLETION OF CONSTRUCTION AND BEFORE ENTRY INTO SERVICE |
I.S. EN 61287-1:2014
|
RAILWAY APPLICATIONS - POWER CONVERTERS INSTALLED ON BOARD ROLLING STOCK - PART 1: CHARACTERISTICS AND TEST METHODS |
BS EN 61377-2:2002
|
RAILWAY APPLICATIONS - ROLLING STOCK - COMBINED TESTING - PART 2: CHOPPER-FED DIRECT CURRENT TRACTION MOTORS AND THEIR CONTROL |
13/30264553 DC : 0
|
BS EN 61287-1 ED 3.0 - RAILWAY APPLICATIONS - POWER CONVERTORS INSTALLED ON BOARD ROLLING STOCK - PART 1: CHARACTERISTICS AND TEST METHODS |
NF EN 50215 : 2010
|
RAILWAY APPLICATIONS - ROLLING STOCK - TESTING OF ROLLING STOCK ON COMPLETION OF CONSTRUCTION AND BEFORE ENTRY INTO SERVICE |
13/30252783 DC : 0
|
BS EN 50502 - RAILWAY APPLICATIONS - ROLLING STOCK - ELECTRIC EQUIPMENT IN TROLLEY BUSES - SAFETY REQUIREMENTS AND CONNECTION SYSTEMS |
14/30288062 DC : 0
|
BS EN 61377 ED. 2.0 - RAILWAY APPLICATIONS - ROLLING STOCK - COMBINED TEST METHOD FOR TRACTION SYSTEMS |
NF EN 61377-2 : 2003
|
RAILWAY APPLICATIONS - ROLLING STOCK - COMBINED TESTING - PART 2: CHOPPER-FED DIRECT CURRENT TRACTION MOTORS AND THEIR CONTROL |
UNE-EN 1870-14:2008
|
Safety of woodworking machines - Circular sawing machines - Part 14: Vertical panel sawing machines |
S.R. CLC/TS 50502:2008
|
RAILWAY APPLICATIONS - ROLLING STOCK - ELECTRIC EQUIPMENT IN TROLLEY BUSES - SAFETY REQUIREMENTS AND CONNECTION SYSTEMS |
I.S. EN 61377:2016
|
RAILWAY APPLICATIONS - ROLLING STOCK - COMBINED TEST METHOD FOR TRACTION SYSTEMS |
DD CLC/TS 50502:2008
|
RAILWAY APPLICATIONS - ROLLING STOCK - ELECTRIC EQUIPMENT IN TROLLEY BUSES - SAFETY REQUIREMENTS AND CONNECTION SYSTEMS |
PREN 50502 : DRAFT 2013
|
RAILWAY APPLICATIONS - ROLLING STOCK - ELECTRIC EQUIPMENT IN TROLLEY BUSES - SAFETY REQUIREMENTS AND CONNECTION SYSTEMS |
I.S. EN 50533:2011
|
RAILWAY APPLICATIONS - THREE-PHASE TRAIN LINE VOLTAGE CHARACTERISTICS |
IEC 61377:2016
|
Railway applications - Rolling stock - Combined test method for traction systems |
IEC 61377-2:2002
|
Railway applications - Rolling stock - Combined testing - Part 2: Chopper-fed direct current traction motors and their control |
IEC 61287-1:2014
|
Railway applications - Power converters installed on board rolling stock - Part 1: Characteristics and test methods |
UNE-EN 50533:2012
|
Railway applications - Three-phase train line voltage characteristics. |
03/306438 DC : DRAFT APR 2003
|
IEC 61133 ED. 2 - RAILWAY APPLICATIONS - ROLLING STOCK - TESTING OF ROLLING STOCK ON COMPLETION OF CONSTRUCTION AND BEFORE ENTRY INTO SERVICE |
PREN 50533 : DRAFT 2009
|
RAILWAY APPLICATIONS - THREE-PHASE TRAIN LINE VOLTAGE CHARACTERISTICS |
SAE J 2907 : 2018
|
PERFORMANCE CHARACTERIZATION OF ELECTRIFIED POWERTRAIN MOTOR-DRIVE SUBSYSTEM |
I.S. EN 61377-2:2002
|
RAILWAY APPLICATIONS - ROLLING STOCK - COMBINED TESTING - PART 2: CHOPPER-FED DIRECT CURRENT TRACTION MOTORS AND THEIR CONTROL |
EN 61287-1:2014/AC:2014
|
RAILWAY APPLICATIONS - POWER CONVERTERS INSTALLED ON BOARD ROLLING STOCK - PART 1: CHARACTERISTICS AND TEST METHODS (IEC 61287-1:2014) |
EN 50215:2009
|
Railway applications - Rolling stock - Testing of rolling stock on completion of construction and before entry into service |
EN 50533 : 2011 AMD 1 2016
|
RAILWAY APPLICATIONS - THREE-PHASE TRAIN LINE VOLTAGE CHARACTERISTICS |
EN 61377:2016
|
Railway applications - Rolling stock - Combined test method for traction Systems |
EN 61377-2:2002
|
Railway applications - Rolling stock - Combined testing - Part 2: Chopper-fed direct current traction motors and their control |