IEC 61375-1:2012
Current
The latest, up-to-date edition.
Electronic railway equipment - Train communication network (TCN) - Part 1: General architecture
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
English - French
21-06-2012
IEC 61375-1:2012 applies to the architecture of data communication systems in open trains, i.e. it covers the architecture of a communication system for the data communication between vehicles of the said open trains, the data communication within the vehicles and the data communication from train to the ground. The applicability of this part of IEC 61375 to the train network technologies allows for interoperability of individual vehicles within open trains in international traffic. The main technical change of this new edition with regard to the previous edition consists of a new structure of the complete IEC 61375 series.
Committee |
TC 9
|
DevelopmentNote |
Stability Date: 2022. (09/2017)
|
DocumentType |
Standard
|
Pages |
105
|
PublisherName |
International Electrotechnical Committee
|
Status |
Current
|
Supersedes |
Standards | Relationship |
NF EN 61375-1 : 2013 | Identical |
NBN EN 61375-1 : 2012 | Identical |
NEN EN IEC 61375-1 : 2012 | Identical |
PN EN 61375-1 : 2013 | Identical |
BS EN 61375-1:2012 | Identical |
CEI EN 61375-1 : 2013 | Identical |
EN 61375-1:2012 | Identical |
DIN EN 61375-1:2015-02 | Identical |
PNE-FprEN 61375-1 | Identical |
NEN IEC 61375-1 : 2007 | Identical |
UNE-EN 61375-1:2012 | Identical |
16/30249995 DC : 0 | BS EN 61375-2-6 ED1.0 - ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK - PART 2-6: ON-BOARD TO GROUND COMMUNICATION |
CEN/TR 17143:2017 | Intelligent transport systems - Standards and actions necessary to enable urban infrastructure coordination to support Urban-ITS |
DD CLC/TS 50535:2010 | Railway applications. Onboard auxiliary power converter systems |
04/30114844 DC : DRAFT JUNE 2004 | IEC 61375-2 ED.1 - ELECTRIC RAILWAY EQUIPMENT - TRAIN BUS - PART 2: TRAIN COMMUNICATION NETWORK CONFORMANCE TESTING |
CEI EN 61375-2-2 : 2013 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-2: WIRE TRAIN BUS CONFORMANCE TESTING |
DD IEC/TS 61968-2:2011 | Application integration at electric utilities. System interfaces for distribution management Glossary |
CEI EN 61375-3-4 : 2014 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 3-4: ETHERNET CONSIST NETWORK (ECN) |
I.S. EN 61375-2-2:2012 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-2: WIRE TRAIN BUS CONFORMANCE TESTING (IEC 61375-2-2:2012 (EQV)) |
I.S. EN 61375-2-3:2015 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-3: TCN COMMUNICATION PROFILE |
I.S. EN 61375-3-3:2012 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 3-3: CANOPEN CONSIST NETWORK (CCN) (IEC 61375-3-3:2012 (EQV)) |
EN 61375-2-5:2015 | Electronic railway equipment - Train communication network (TCN) - Part 2-5: Ethernet train backbone |
EN 61158-5-10:2014 | Industrial communication networks - Fieldbus specifications - Part 5-10: Application layer service definition - Type 10 elements |
EN 61375-2-2:2012 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-2: WIRE TRAIN BUS CONFORMANCE TESTING (IEC 61375-2-2:2012) |
EN 61375-2-1 : 2012 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-1: WIRE TRAIN BUS (WTB) (IEC 61375-2-1:2012) |
BS EN 61375-2-2:2012 | Electronic railway equipment. Train communication network (TCN) Wire Train Bus conformance testing |
BS EN 61375-3-3:2012 | Electronic railway equipment. Train communication network (TCN) CANopen Consist Network (CCN) |
PD CEN/TR 17143:2017 | Intelligent transport systems. Standards and actions necessary to enable urban infrastructure coordination to support Urban-ITS |
03/308323 DC : DRAFT MAY 2003 | IEC 61375-2 ED.1 - ELECTRIC RAILWAY EQUIPMENT - TRAIN BUS - PART 2: TRAIN COMMUNICATION NETWORK CONFORMANCE TESTING |
05/30114846 DC : DRAFT MAY 2005 | IEC 61375-2 - ELECTRIC RAILWAY EQUIPMENT - TRAIN BUS - PART 2: TRAIN COMMUNICATION NETWORK CONFORMANCE TESTING |
EN 50463-4:2017 | Railway applications - Energy measurement on board trains - Part 4: Communication |
S.R. CLC/TS 50535:2010 | RAILWAY APPLICATIONS - ONBOARD AUXILIARY POWER CONVERTER SYSTEMS |
I.S. EN 61158-5-10:2014 | INDUSTRIAL COMMUNICATION NETWORKS - FIELDBUS SPECIFICATIONS - PART 5-10: APPLICATION LAYER SERVICE DEFINITION - TYPE 10 ELEMENTS |
IEC 61375-3-4:2014 | Electronic railway equipment - Train communication network (TCN) - Part 3-4: Ethernet Consist Network (ECN) |
CLC/TS 50535:2010 | Railway applications - Onboard auxiliary power converter systems |
PD IEC/TS 62580-2:2016 | Electronic railway equipment. On-board multimedia and telematic subsystems for railways Video surveillance/CCTV services |
BS EN 50463-4:2017 | Railway applications. Energy measurement on board trains Communication |
BS EN 61375-3-4 : 2014 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 3-4: ETHERNET CONSIST NETWORK (ECN) (IEC 61375-3-4:2014) |
11/30213792 DC : 0 | BS EN 50463-4 - RAILWAY APPLICATIONS - ENERGY MEASUREMENT ON BOARD TRAINS - PART 4: COMMUNICATION |
PD IEC/TS 61375-2-4:2017 | Electronic railway equipment. Train communication network (TCN) TCN application profile |
BS EN 61375-2-5:2015 | Electronic railway equipment. Train communication network (TCN) Ethernet train backbone |
PD CLC/TR 50501-2:2012 | Railway applications. Rolling stock. Intercommunication between vehicles and train/wayside Technical contents of standardization work in the field of intercommunication |
09/30205462 DC : 0 | BS EN 61375-3-3 - ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK - PART 3-3: CCN - CANOPEN CONSIST NETWORK BUS |
CEI CLC/TR 50501-2 : 2013 | RAILWAY APPLICATIONS - ROLLING STOCK - INTERCOMMUNICATION BETWEEN VEHICLES AND TRAIN/WAYSIDE - PART 2: TECHNICAL CONTENTS OF STANDARDIZATION WORK IN THE FIELD OF INTERCOMMUNICATION |
CLC/TR 50501-2:2012 | Railway applications - Rolling stock - Intercommunication between vehicles and train/wayside - Part 2: Technical contents of standardization work in the field of intercommunication |
IEC TS 61968-2:2011 | Application integration at electric utilities - System interfaces for distribution management - Part 2: Glossary |
IEC TR 61375-2-7:2014 | Electronic railway equipment - Train communication network (TCN) - Part 2-7: Wireless Train Backbone (WLTB) |
CEI EN 61375-2-1 : 2013 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-1: WIRE TRAIN BUS (WTB) |
13/30269687 DC : 0 | BS EN 61375-2-3 ED 1.0 - ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-3: TCN COMMUNICATION PROFILE |
CEI CLC/TS 50535 : 2011 | RAILWAY APPLICATIONS - ONBOARD AUXILIARY POWER CONVERTER SYSTEMS |
I.S. EN 61375-2-1:2012 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-1: WIRE TRAIN BUS (WTB) (IEC 61375-2-1:2012 (EQV)) |
EN 61375-2-3:2015/A11:2017 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-3: TCN COMMUNICATION PROFILE (IEC 61375-2-3:2015) |
12/30235235 DC : 0 | BS EN 61375-2-5 - ELECTRONIC RAILWAY EQUIPMENT - TRAIN BACKBONE - PART 2-5: ETHERNET TRAIN BACKBONE |
CEI EN 61375-3-3 : 2013 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 3-3: CANOPEN CONSIST NETWORK (CCN) |
11/30207770 DC : 0 | BS EN 61375-3-4 - ELECTRONIC RAILWAY EQUIPMENT - TRAIN BUS - PART 3-4: ECN - ETHERNET CONSIST NETWORK |
BS EN 61375-2-1:2012 | Electronic railway equipment. Train communication network (TCN) Wire Train Bus (WTB) |
BS EN 61375-2-3 : 2015 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-3: TCN COMMUNICATION PROFILE (IEC 61375-2-3:2015) |
DIN EN 61158-5-10:2015-09 | INDUSTRIAL COMMUNICATION NETWORKS - FIELDBUS SPECIFICATIONS - PART 5-10: APPLICATION LAYER SERVICE DEFINITION - TYPE 10 ELEMENTS (IEC 61158-5-10:2014) |
I.S. EN 61375-2-5:2015 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-5: ETHERNET TRAIN BACKBONE |
I.S. EN 61375-3-4:2014 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 3-4: ETHERNET CONSIST NETWORK (ECN) |
IEC 61375-2:2007 | Electric railway equipment - Train bus - Part 2: Train communication network conformance testing |
IEC TS 61375-2-4:2017 | Electronic railway equipment - Train communication network (TCN) - Part 2-4: TCN application profile |
IEC 61158-5-10:2014 | Industrial communication networks - Fieldbus specifications - Part 5-10: Application layer service definition - Type 10 elements |
IEC 61375-2-5:2014 | Electronic railway equipment - Train communication network (TCN) - Part 2-5: Ethernet train backbone |
IEC 61375-2-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB) |
IEC 61375-2-2:2012 | Electronic railway equipment - Train communication network (TCN) - Part 2-2: Wire Train Bus conformance testing |
IEC TS 62580-2:2016 | Electronic railway equipment - On-board multimedia and telematic subsystems for railways - Part 2: Video surveillance/CCTV services |
S.R. CLC/TR 50501-2:2012 | RAILWAY APPLICATIONS - ROLLING STOCK - INTERCOMMUNICATION BETWEEN VEHICLES AND TRAIN/WAYSIDE - PART 2: TECHNICAL CONTENTS OF STANDARDIZATION WORK IN THE FIELD OF INTERCOMMUNICATION |
PD IEC/TR 61375-2-7:2014 | Electronic railway equipment. Train communication network (TCN) Wireless Train Backbone (WLTB) |
BS EN 61158-5-10:2014 | Industrial communication networks. Fieldbus specifications Application layer service definition. Type 10 elements |
S.R. CEN/TR 17143:2017 | INTELLIGENT TRANSPORT SYSTEMS - STANDARDS AND ACTIONS NECESSARY TO ENABLE URBAN INFRASTRUCTURE COORDINATION TO SUPPORT URBAN-ITS |
NF EN 61375-2-5 : 2015 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-5: ETHERNET TRAIN BACKBONE |
I.S. EN 50463-4:2017 | RAILWAY APPLICATIONS - ENERGY MEASUREMENT ON BOARD TRAINS - PART 4: COMMUNICATION |
IEC 61375-3-3:2012 | Electronic railway equipment - Train communication network (TCN) - Part 3-3: CANopen Consist Network (CCN) |
EN 61375-3-4:2014/A11:2017 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 3-4: ETHERNET CONSIST NETWORK (ECN) |
EN 61375-3-3:2012 | Electronic railway equipment - Train communication network (TCN) - Part 3-3: CANopen Consist Network (CCN) |
ISO/IEC 7498-1:1994 | Information technology — Open Systems Interconnection — Basic Reference Model: The Basic Model |
IEC 61375-3-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 3-1: Multifunction Vehicle Bus (MVB) |
ISO/IEC 19501:2005 | Information technology — Open Distributed Processing — Unified Modeling Language (UML) Version 1.4.2 |
IEC 61375-2-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB) |
ISO/IEC 9646-1:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 1: General concepts |
ISO/IEC 8824-1:2015 | Information technology Abstract Syntax Notation One (ASN.1): Specification of basic notation Part 1: |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.