• There are no items in your cart

IEC 62439-3:2012

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Superseded date

31-12-2021

Language(s)

English - French

Published date

05-07-2012

€358.68
Excluding VAT

IEC 62439-3:2012 specifies two redundancy protocols designed to provide seamless recovery in case of single failure of an inter-bridge link or bridge in the network, which are based on the same scheme: duplication of the LAN, resp. duplication of the transmitted information. This second edition cancels and replaces the first edition published in 2010. It constitutes a technical revision. The main changes with respect to the previous edition are:
- specification of the interconnection of PRP and HSR networks;
- introduction of a suffix for PRP frames;
- clarification and modification of specifications to ensure interoperability;
- slackening of the specifications to allow different implementations;
- consideration of clock synchronization according to IEC 61588;
- introduction of test modes to simplify testing and maintenance.

This publication is to be read in conjunction with IEC 62439-1:2010.

Committee
TC 65/SC 65C
DocumentType
Standard
Pages
177
PublisherName
International Electrotechnical Committee
Status
Superseded
SupersededBy
Supersedes

Standards Relationship
PNE-EN 62439-3:2010/FprA1 Identical
UNE-EN 62439-3:2012 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.