• There are no items in your cart

IEC TS 60076-19:2013

Current

Current

The latest, up-to-date edition.

Power transformers - Part 19: Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English - French, Spanish, Castilian

Published date

22-03-2013

€244.32
Excluding VAT

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols
5 Power measurement, systematic deviation and uncertainty
6 Procedures for no-load loss measurement
7 Procedures for load loss measurement
8 Three-phase calculations
9 Reporting
10 Estimate of corrections and uncertainty contributions
Annex A (informative) - Example of load loss uncertainty
        evaluation for a large power transformer
Annex B (Informative) - Example of load loss uncertainty
        evaluation for a distribution transformer
Bibliography

IEC/TS 60076-19:2013, which is a Technical Specification, illustrates the procedures that should be applied to evaluate the uncertainty affecting the measurements of no-load and load losses during the routine tests on power transformers. Even if the attention is especially paid to the transformers, when applicable the specification can be also used for the measurements of reactor losses, except large reactors with very low power factor.

DocumentType
Technical Specification
Pages
75
PublisherName
International Electrotechnical Committee
Status
Current

Standards Relationship
NEN NPR IEC/TS 60076-19 : 2013 Identical
BS PD IEC TS 60076-19 : 2013 Identical
EN 60076-19:2015 Identical
SN EN 60076-19 : 2015 Identical

PD IEC TS 60076-20:2017 Power transformers Energy efficiency
I.S. EN 50629:2015 ENERGY PERFORMANCE OF LARGE POWER TRANSFORMERS (U[M] > 36 KV OR S[R] >= 40 MVA)
BS EN 50629 : 2015 ENERGY PERFORMANCE OF LARGE POWER TRANSFORMERS (U[M] > 36 KV OR S[R] >= 40 MVA)
EN 50629:2015/A2:2018 ENERGY PERFORMANCE OF LARGE POWER TRANSFORMERS (U[M] > 36 KV OR S[R] >= 40 MVA)

ISO/IEC 17025:2005 General requirements for the competence of testing and calibration laboratories
IEC 61869-3:2011 Instrument transformers - Part 3: Additional requirements for inductive voltage transformers
IEC 61869-2:2012 Instrument transformers - Part 2: Additional requirements for current transformers
IEC 61869-1:2007 Instrument transformers - Part 1: General requirements
IEC 60076-8:1997 Power transformers - Part 8: Application guide
IEC 60076-1:2011 Power transformers - Part 1: General
IEEE C57.123-2010 REDLINE IEEE Guide for Transformer Loss Measurement
IEC 60076-2:2011 Power transformers - Part 2: Temperature rise for liquid-immersed transformers
ISO/IEC Guide 98-3:2008 Uncertainty of measurement — Part 3: Guide to the expression of uncertainty in measurement (GUM:1995)

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.