IEC TS 60076-19:2013
Current
The latest, up-to-date edition.
Power transformers - Part 19: Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
English - French, Spanish, Castilian
22-03-2013
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols
5 Power measurement, systematic deviation and uncertainty
6 Procedures for no-load loss measurement
7 Procedures for load loss measurement
8 Three-phase calculations
9 Reporting
10 Estimate of corrections and uncertainty contributions
Annex A (informative) - Example of load loss uncertainty
evaluation for a large power transformer
Annex B (Informative) - Example of load loss uncertainty
evaluation for a distribution transformer
Bibliography
IEC/TS 60076-19:2013, which is a Technical Specification, illustrates the procedures that should be applied to evaluate the uncertainty affecting the measurements of no-load and load losses during the routine tests on power transformers. Even if the attention is especially paid to the transformers, when applicable the specification can be also used for the measurements of reactor losses, except large reactors with very low power factor.
DocumentType |
Technical Specification
|
Pages |
75
|
PublisherName |
International Electrotechnical Committee
|
Status |
Current
|
Standards | Relationship |
NEN NPR IEC/TS 60076-19 : 2013 | Identical |
BS PD IEC TS 60076-19 : 2013 | Identical |
EN 60076-19:2015 | Identical |
SN EN 60076-19 : 2015 | Identical |
PD IEC TS 60076-20:2017 | Power transformers Energy efficiency |
I.S. EN 50629:2015 | ENERGY PERFORMANCE OF LARGE POWER TRANSFORMERS (U[M] > 36 KV OR S[R] >= 40 MVA) |
BS EN 50629 : 2015 | ENERGY PERFORMANCE OF LARGE POWER TRANSFORMERS (U[M] > 36 KV OR S[R] >= 40 MVA) |
EN 50629:2015/A2:2018 | ENERGY PERFORMANCE OF LARGE POWER TRANSFORMERS (U[M] > 36 KV OR S[R] >= 40 MVA) |
ISO/IEC 17025:2005 | General requirements for the competence of testing and calibration laboratories |
IEC 61869-3:2011 | Instrument transformers - Part 3: Additional requirements for inductive voltage transformers |
IEC 61869-2:2012 | Instrument transformers - Part 2: Additional requirements for current transformers |
IEC 61869-1:2007 | Instrument transformers - Part 1: General requirements |
IEC 60076-8:1997 | Power transformers - Part 8: Application guide |
IEC 60076-1:2011 | Power transformers - Part 1: General |
IEEE C57.123-2010 REDLINE | IEEE Guide for Transformer Loss Measurement |
IEC 60076-2:2011 | Power transformers - Part 2: Temperature rise for liquid-immersed transformers |
ISO/IEC Guide 98-3:2008 | Uncertainty of measurement — Part 3: Guide to the expression of uncertainty in measurement (GUM:1995) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.