IEC TS 61400-26-1:2011
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems
Hardcopy , PDF
English, Spanish, Castilian
14-11-2011
31-12-2021
FOREWORD
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Information model
5 INFORMATION AVAILABLE
6 INFORMATION UNAVAILABLE
Annex A (informative) - Optional information
categories - examples
Annex B (informative) - Time based availability
indicators - examples
Annex C (informative) - Verification scenarios - examples
Bibliography
IEC 61400-26-1:2011(E) defines generic information categories to which fractions of time can be assigned for a wind turbine generating system (WTGS) considering internal and external conditions based on fraction of time and specifying the following:
- generic information categories of a WTGS considering availability and other performance indicators;
- information category priority in order to discriminate between concurrent categories;
- entry and exit point for each information category in order to allocate designation of time;
- informative annexes providing various examples.
| Committee |
TC 88
|
| DevelopmentNote |
Stability Date: 2017. (09/2017)
|
| DocumentType |
Technical Specification
|
| Pages |
53
|
| PublisherName |
International Electrotechnical Committee
|
| Status |
Superseded
|
| SupersededBy |
| Standards | Relationship |
| PD CLC/TS 61400-26-1:2017 | Identical |
| NEN NVN CLC IEC/TS 61400-26-1 : 2017 | Identical |
| CLC/TS 61400-26-1:2017 | Identical |
| UNE-IEC/TS 61400-26-1:2013 EX | Identical |
| UNE-CLC/TS 61400-26-1:2017 EX | Identical |
| CEI CLC/TS 61400-26-1:2018 | Identical |
| VDE V 0127-26-1 : 2018 | Identical |
| NEN NPR IEC/TS 61400-26-1 : 2011 | Identical |
| DD IEC TS 61400-26-1 : 2011 | Identical |
| ONORM OVE TS 61400-26-1 : 2018 | Identical |
| DIN CLC/TS 61400-26-1 : 2018 | Identical |
| CLC/TS 61400-26-3:2017 | Wind energy generation systems - Part 26-3: Availability for wind power stations |
| PD ISO/TR 21245-1:2016 | Railway applications. Rail project planning process Stakeholders and their needs/interests |
| I.S. EN 61400-25-2:2015 | WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
| BS EN 61400-25-2:2015 | Wind turbines Communications for monitoring and control of wind power plants - Information models |
| S.R. CLC/TS 61400-26-2:2017 | WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES |
| PD CLC/TS 61400-26-2:2017 | Wind turbines Production-based availability for wind turbines |
| IEC TS 61400-26-2:2014 | Wind turbines - Part 26-2: Production-based availability for wind turbines |
| CLC/TS 61400-26-2:2017 | Wind turbines - Part 26-2: Production-based availability for wind turbines |
| BS PD IEC TS 61400-26-2 : 2014 | WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES |
| S.R. CLC/TS 61400-26-3:2017 | WIND ENERGY GENERATION SYSTEMS - PART 26-3: AVAILABILITY FOR WIND POWER STATIONS |
| IEC 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
| IEC TS 61400-26-3:2016 | Wind energy generation systems - Part 26-3: Availability for wind power stations |
| PD CLC/TS 61400-26-3:2017 | Wind energy generation systems Availability for wind power stations |
| PD IEC/TS 61400-26-3:2016 | Wind energy generation systems Availability for wind power stations |
| NF EN 61400-25-2 : 2016 | WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
| EN 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
| IEC 60050-415:1999 | International Electrotechnical Vocabulary (IEV) - Part 415: Wind turbine generator systems |
| IEEE 762-2006 | IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity |
| ISO 3977-9:1999 | Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety |
| IEC 61400-25-4:2016 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
| IEC 61400-25-3:2015 | Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
| IEC 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
| IEC 61400-1:2005+AMD1:2010 CSV | Wind turbines - Part 1: Design requirements |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.