ISO 10427-3:2003
Current
The latest, up-to-date edition.
Petroleum and natural gas industries — Equipment for well cementing — Part 3: Performance testing of cementing float equipment
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
English, French
09-04-2003
ISO 10427-3:2003 describes testing practices to evaluate the performance of cementing float equipment for the petroleum and natural gas industries.
ISO 10427-3:2003 is applicable to float equipment that will be in contact with water-based fluids used for drilling and cementing wells. It is not applicable to float equipment performance in non-water-based fluids.
Committee |
ISO/TC 67/SC 3
|
DevelopmentNote |
Supersedes ISO/FDIS 10427-3 (04/2003) Supersedes ISO 18165 (04/2003) Also numbered as API 10F. (11/2003) Together with ISO 10427-1 and ISO 10427-2 supersedes ISO 10427. (05/2004)
|
DocumentType |
Standard
|
Pages |
11
|
PublisherName |
International Organization for Standardization
|
Status |
Current
|
Supersedes |
Standards | Relationship |
NF EN ISO 10427-3 : 2005 | Identical |
NBN EN ISO 10427-3 : 2005 | Identical |
NEN ISO 10427-3 : 2003 | Identical |
NEN EN ISO 10427-3 : 2004 | Identical |
NS EN ISO 10427-3 : 1ED 2005 | Identical |
I.S. EN ISO 10427-3:2004 | Identical |
PN EN ISO 10427-3 : 2006 | Identical |
SN EN ISO 10427-3 : 2005 | Identical |
UNI EN ISO 10427-3 : 2005 | Identical |
UNE-EN ISO 10427-3:2004 | Identical |
BS EN ISO 10427-3:2004 | Identical |
EN ISO 10427-3:2004 | Identical |
DIN EN ISO 10427-3:2005-09 | Identical |
BS ISO 27914:2017 | Carbon dioxide capture, transportation and geological storage. Geological storage |
16/30292328 DC : 0 | BS ISO 27914 - CARBON DIOXIDE CAPTURE, TRANSPORTATION AND GEOLOGICAL STORAGE - GEOLOGICAL STORAGE |
API STD 65-PART 2:2010(R2016) | ISOLATING POTENTIAL FLOW ZONES DURING WELL CONSTRUCTION |
NORSOK D 010 : 2013 | WELL INTEGRITY IN DRILLING AND WELL OPERATIONS |
ISO 27914:2017 | Carbon dioxide capture, transportation and geological storage Geological storage |
API HF1 : 2009 | HYDRAULIC FRACTURING OPERATIONS - WELL CONSTRUCTION AND INTEGRITY GUIDELINES |
API 65-2:2010 | ISOLATING POTENTIAL FLOW ZONES DURING WELL CONSTRUCTION |
CSA Z741 :2012 | GEOLOGICAL STORAGE OF CARBON DIOXIDE |
CSA Z741 : 2012 : R2017 | GEOLOGICAL STORAGE OF CARBON DIOXIDE |
AS ISO 27914:2019 | Carbon dioxide capture, transportation and geological storage - Geological storage |
ISO 10414-1:2008 | Petroleum and natural gas industries — Field testing of drilling fluids — Part 1: Water-based fluids |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.