MIL-D-44144 Revision A:1986
Current
The latest, up-to-date edition.
Drying Tumbler, Laundry
22-12-1986
1. SCOPE
2. APPLICABLE DOCUMENTS
3. REQUIREMENTS
4. QUALITY ASSURANCE PROVISIONS
5. PACKAGING
6. NOTES
Covers a fuel fired drying tumbler with a load capacity of not less than 120 pounds dry weight of laundry per hour.
| DevelopmentNote |
A NOTICE 2 - Notice of Validation but remains inactive for New Design (03/2004)
|
| DocumentType |
Standard
|
| Pages |
22
|
| PublisherName |
US Military Specs/Standards/Handbooks
|
| Status |
Current
|
This document covers a fuel fired drying tumbler with a load capacity of not less the 120 pounds dry weight of laundry per hour.
| MIL-L-44142 Revision A:1986 | Laundry Unit, Trailer Mounted |
| MIL-T-44047 Revision E:1991 | Trousers, Camouflage Pattern, Combat (No S/S Document) |
| MIL-STD-130 Revision N:2007 | Identification Marking of U.S. Military Property |
| MIL-L-44142 Revision A:1986 | Laundry Unit, Trailer Mounted |
| MIL-STD-195 Base Document:1955 | MARKING OF CONNECTIONS FOR ELECTRIC ASSEMBLIES (NO S/S DOCUMENT) |
| QQ-S-571 Revision F:1994 | SOLDER, ELECTRONIC (96 TO 485 DEG. C) (S/S BY J-STD-004, J-STD-005 AND J-STD-006) |
| MIL-T-704 Revision K:1992 | Treatment and Painting of Material |
| NFPA 70 : 2017 | NATIONAL ELECTRICAL CODE |
| HH-I-553 Revision C:1975 | Insulation Tape, Electrical, (Rubber, Natural and Synthetic) (S/S by ASTM D4388) |
| MIL-STD-105 Revision E:1989 | Sampling Procedures and Tables for Inspection by Attributes (See Notice 3 for Replacement Information) |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.