NEN EN 45510-5-1 : 1998
Current
The latest, up-to-date edition.
GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 5-1: STEAM TURBINES
12-01-2013
Foreword
1 Scope
2 Normative references
3 Definitions
3.1 Organizational terms
3.2 Technical terms
3.3 General terms
4 Brief overall project description
4.1 Role and organization of purchaser
4.2 Site location
4.3 Equipment task
4.4 Equipment to be purchased
4.5 Control and instrumentation
4.6 Electrical supplies and other services
4.7 Other interfaces
4.8 Project programme
4.9 Equipment identification systems
5 Extent of supply
6 Terminal points
7 Operational requirements
7.1 Operating environment
7.2 Manning levels
7.3 Normal operation
7.4 Operating hours
7.5 Start-up and shut-down
7.6 Abnormal conditions
7.7 Further operational requirements
8 Life expectancy
8.1 Design life
8.2 Components requiring periodic maintenance
9 Performance requirements
9.1 Duty
9.2 Performance
9.3 Equipment margins
9.4 Availability
9.5 Levels of component redundancy
9.6 Further performance requirements
10 Design and fabrication
10.1 Specific equipment features
10.2 Design justification
10.3 Material selection
10.4 Safety
10.5 Interchangeability
10.6 Fabrication methods
11 Maintenance requirements
11.1 Planned maintenance
11.2 Personnel safety
11.3 Requirements for access
11.4 Lifting requirements
11.5 Special tools
11.6 Test equipment
11.7 Spare parts strategy
11.8 Special precautions
12 Technical documentation requirements
12.1 Tender documentation
12.2 Contract documentation
13 Applicable legislation, regulations, standards and
further requirements
13.1 Legislation and regulations
13.2 Standards
13.3 Further requirements
14 Evaluation criteria
14.1 General
14.2 Technical criteria
15 Quality measures
15.1 General
15.2 Approvals procedure
15.3 Inspection requirements
15.4 Non-conformity
16 Site factors
16.1 Access
16.2 Facilities
16.3 Site specific requirements
17 Verification of specified performance
17.1 General
17.2 Works tests
17.3 Tests during installation and commissioning
17.4 Technical conditions for trial run
17.5 Functional and performance tests
Annex A (informative) Bibliography
Annex B (informative) Terminal points of supply
Annex C (informative) Schedule for performance specification
Annex D (informative) Design information to be provided by
the supplier
Annex E (informative) Maintenance schedule
Annex F (informative) Purpose and extent of documentation
Provides guidance on writing the technical specification for procuring steam turbines driving generators, to be used in electricity generating stations (power stations). Does not apply to equipment used in the nuclear reactor plant area of nuclear power stations.
DocumentType |
Standard
|
PublisherName |
Netherlands Standards
|
Status |
Current
|
Standards | Relationship |
EN 45510-5-1:1998 | Identical |
BS EN 45510-5-1:1998 | Identical |
DIN EN 45510-5-1:1998-06 | Identical |
EN 45510-5-1 : 1998 | Identical |
UNE-EN 45510-5-1:1998 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.