• There are no items in your cart

PREN 13232-9 : DRAFT 2014

Current

Current

The latest, up-to-date edition.

RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 9: LAYOUTS

Published date

16-06-2014

Sorry this product is not available in your region.

Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Acceptance (General Design Process
  Step 4 - See prEN 13232-2:2014)
Annex A (informative) - Layout acceptance form

Specifies the geometrical and non-geometrical acceptance criteria for inspection of layouts assembled both in the fabrication plant and at track site in case of layouts that are delivered non or partially assembled or in a 'kit' form.

Committee
TC 256
DocumentType
Draft
PublisherName
Comite Europeen de Normalisation
Status
Current

Standards Relationship
14/30294813 DC : 0 Identical
14/30294813 DC : DRAFT JUNE 2014 Identical
03/310084 DC : DRAFT JUNE 2003 Identical

04/30113588 DC : DRAFT MAY 2004 EN 13803-2 - RAILWAY APPLICATIONS - TRACK ALIGNMENT DESIGN PARAMETERS - TRACK GAUGES 1435 MM AND WIDER - PART 2: SWITCHES AND CROSSINGS AND COMPARABLE ALIGNMENT DESIGN SITUATIONS WITH ABRUPT CHANGES OF CURVATURE
PREN 13232-2 : DRAFT 2014 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN
05/19988443 DC : DRAFT APR 2005 BS EN 13232-8 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 8: EXPANSION DEVICES
14/30294492 DC : 0 BS EN 13232-2 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN
EN 13232-7:2006+A1:2011 Railway applications - Track - Switches and crossings - Part 7: Crossings with moveable parts
EN 13232-2:2003+A1:2011 Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design
EN 13232-4:2005+A1:2011 Railway applications - Track - Switches and crossings - Part 4: Actuation, locking and detection
05/30137978 DC : 0 EN 15273-1 - RAILWAY APPLICATIONS - GAUGES - PART 1: GENERALITIES - COMMON RULES FOR INFRASTRUCTURE AND ROLLING STOCK
14/30294495 DC : 0 BS EN 13232-4 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 4: ACTUATION, LOCKING AND DETECTION
DIN EN 13232-2:2014-07 (Draft) RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN
I.S. EN 13232-2:2003 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN
I.S. EN 13232-4:2005 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 4: ACTUATION, LOCKING AND DETECTION
I.S. EN 13232-7:2006 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS
DIN EN 13232-7:2012-01 Railway applications - Track - Switches and crossings - Part 7: Crossings with moveable parts (includes Amendment A1:2011)
DIN EN 13232-4:2012-01 Railway applications - Track - Switches and crossings - Part 4: Actuation, locking and detection (includes Amendment A1:2011)
DIN EN 13232-2:2012-01 Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design (includes Amendment A1:2011)
PREN 13232-7 : DRAFT 2014 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 7: CROSSINGS WITH MOVEABLE PARTS
BS EN 13232-2 : 2003 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN
UNI EN 13232-4 : 2012 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 4: ACTUATION, LOCKING AND DETECTION
UNI EN 13232-2 : 2012 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN
UNI EN 13232-7 : 2012 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS
PREN 13232-4 : DRAFT 2014 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 4: ACTUATION, LOCKING AND DETECTION
PREN 13232-8 : DRAFT 2014 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 8: EXPANSION DEVICES
14/30294504 DC : 0 BS EN 13232-7 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 7: CROSSINGS WITH MOVEABLE PARTS
DIN EN 13232-7:2014-07 (Draft) RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS
BS EN 13232-7 : 2006 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS
DIN EN 13232-4:2014-07 (Draft) RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 4: ACTUATION, LOCKING AND DETECTION
05/30137984 DC : 0 EN 15273-3 - RAILWAY APPLICATIONS - GAUGES - PART 3: STRUCTURE GAUGES
14/30294501 DC : 0 BS EN 13232-8 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 8: EXPANSION DEVICES
BS EN 13232-4 : 2005 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 4: ACTUATION, LOCKING AND DETECTION
UNE-EN 13232-2:2005 Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design
UNE-EN 13232-7:2007 Railway applications - Track - Switches and crossings - Part 7: Crossings with moveable parts
UNE-EN 13232-4:2007 Railway application. Track. Switches and crossings. Part 4: Actuation, locking and detection

PREN 13232-2 : DRAFT 2014 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN
PREN 13232-3 : DRAFT 2014 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 3: REQUIREMENTS FOR WHEEL/RAIL INTERACTION
PREN 13232-1 : DRAFT 2013 RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 1: DEFINITIONS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.