PREN 13232-9 : DRAFT 2014
Current
The latest, up-to-date edition.
RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 9: LAYOUTS
16-06-2014
Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Acceptance (General Design Process
Step 4 - See prEN 13232-2:2014)
Annex A (informative) - Layout acceptance form
Specifies the geometrical and non-geometrical acceptance criteria for inspection of layouts assembled both in the fabrication plant and at track site in case of layouts that are delivered non or partially assembled or in a 'kit' form.
| Committee |
TC 256
|
| DocumentType |
Draft
|
| PublisherName |
Comite Europeen de Normalisation
|
| Status |
Current
|
| Standards | Relationship |
| 14/30294813 DC : 0 | Identical |
| 14/30294813 DC : DRAFT JUNE 2014 | Identical |
| 03/310084 DC : DRAFT JUNE 2003 | Identical |
| 04/30113588 DC : DRAFT MAY 2004 | EN 13803-2 - RAILWAY APPLICATIONS - TRACK ALIGNMENT DESIGN PARAMETERS - TRACK GAUGES 1435 MM AND WIDER - PART 2: SWITCHES AND CROSSINGS AND COMPARABLE ALIGNMENT DESIGN SITUATIONS WITH ABRUPT CHANGES OF CURVATURE |
| PREN 13232-2 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
| 05/19988443 DC : DRAFT APR 2005 | BS EN 13232-8 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 8: EXPANSION DEVICES |
| 14/30294492 DC : 0 | BS EN 13232-2 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
| EN 13232-7:2006+A1:2011 | Railway applications - Track - Switches and crossings - Part 7: Crossings with moveable parts |
| EN 13232-2:2003+A1:2011 | Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design |
| EN 13232-4:2005+A1:2011 | Railway applications - Track - Switches and crossings - Part 4: Actuation, locking and detection |
| 05/30137978 DC : 0 | EN 15273-1 - RAILWAY APPLICATIONS - GAUGES - PART 1: GENERALITIES - COMMON RULES FOR INFRASTRUCTURE AND ROLLING STOCK |
| 14/30294495 DC : 0 | BS EN 13232-4 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 4: ACTUATION, LOCKING AND DETECTION |
| DIN EN 13232-2:2014-07 (Draft) | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
| I.S. EN 13232-2:2003 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
| I.S. EN 13232-4:2005 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 4: ACTUATION, LOCKING AND DETECTION |
| I.S. EN 13232-7:2006 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
| DIN EN 13232-7:2012-01 | Railway applications - Track - Switches and crossings - Part 7: Crossings with moveable parts (includes Amendment A1:2011) |
| DIN EN 13232-4:2012-01 | Railway applications - Track - Switches and crossings - Part 4: Actuation, locking and detection (includes Amendment A1:2011) |
| DIN EN 13232-2:2012-01 | Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design (includes Amendment A1:2011) |
| PREN 13232-7 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
| BS EN 13232-2 : 2003 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
| PREN 13232-4 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 4: ACTUATION, LOCKING AND DETECTION |
| PREN 13232-8 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 8: EXPANSION DEVICES |
| 14/30294504 DC : 0 | BS EN 13232-7 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
| DIN EN 13232-7:2014-07 (Draft) | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
| BS EN 13232-7 : 2006 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
| DIN EN 13232-4:2014-07 (Draft) | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 4: ACTUATION, LOCKING AND DETECTION |
| 05/30137984 DC : 0 | EN 15273-3 - RAILWAY APPLICATIONS - GAUGES - PART 3: STRUCTURE GAUGES |
| 14/30294501 DC : 0 | BS EN 13232-8 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 8: EXPANSION DEVICES |
| BS EN 13232-4 : 2005 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 4: ACTUATION, LOCKING AND DETECTION |
| UNE-EN 13232-2:2005 | Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design |
| UNE-EN 13232-4:2007 | Railway application. Track. Switches and crossings. Part 4: Actuation, locking and detection |
| UNE-EN 13232-7:2007 | Railway applications - Track - Switches and crossings - Part 7: Crossings with moveable parts |
| PREN 13232-2 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
| PREN 13232-3 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 3: REQUIREMENTS FOR WHEEL/RAIL INTERACTION |
| PREN 13232-1 : DRAFT 2013 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 1: DEFINITIONS |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.