Introduction
Acknowledgements
1 Scope
2 Normative References
3 Definitions, symbols and abbreviations
3.1 Definitions
3.2 Symbols
3.3 Abbreviations
4 RIMAP Framework
4.1 RIMAP vs RBIM
4.2 RIMAP Principles
4.3 RIMAP Requirements
4.3.1 General requirements
4.3.2 Personnel requirements
4.3.3 Requirements for performing PoF analysis
4.3.4 Requirements for performing CoF analysis
4.3.5 Risk assessment Requirement
4.4 RIMAP within the overall management system
4.5 Limitations
4.6 Compatibility with other known approaches
5 RIMAP Procedure
5.1 Initial analysis and planning
5.1.1 General description and scope
5.1.2 Requirements
5.1.3 Inputs
5.1.4 Procedure
5.1.5 Output
5.1.6 Warnings and applicability limits
5.2 Data collection and validation
5.2.1 General description and scope
5.2.2 Requirements
5.2.3 Input
5.2.4 Procedure
5.2.5 Output
5.2.6 Warnings and applicability limits
5.3 Multilevel risk analysis (ranging from screening to
detailed)
5.3.1 General description and scope
5.3.2 Risk analysis - screening level
5.3.3 Risk analysis - detailed assessment
5.4 Decision making/action plan
5.4.1 General description and scope
5.4.2 Requirements
5.4.3 Inputs
5.4.4 Procedure
5.4.5 Output
5.4.6 Warnings and applicability limits
5.5 Execution and reporting
5.5.1 General
5.5.2 Input
5.5.3 Procedure
5.5.4 Output
5.5.5 Warning/application limits
5.6 Performance review/Evergreen phase
5.6.1 General description and scope
5.6.2 Requirements
5.6.3 Inputs
5.6.4 Procedure
5.6.5 Output
5.6.6 Warnings and applicability limits
Bibliography