SAE AS9000A
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
View Superseded by
AEROSPACE BASIC QUALITY SYSTEM STANDARD
Hardcopy , PDF
19-02-2004
English
01-01-1998
1. SCOPE
1.1 Quality Philosophy
2. REFERENCES
3. DEFINITIONS
4. QUALITY SYSTEM REQUIREMENTS
4.1 Management Responsibility
4.2 Quality System
4.3 Contract Review
4.4 Design Control
4.5 Document and Data Control
4.6 Purchasing
4.7 Control of Customer-Supplied Product
4.8 Product Identification and Traceability
4.9 Process Control
4.10 Inspection and Testing
4.11 Control of Inspection, Measuring and Test Equipment
4.12 Inspection and Test Status
4.13 Control of Nonconforming Product
4.14 Corrective and Preventive Action
4.15 Handling, Storage, Packaging, Preservation and
Delivery
4.16 Control of Quality Records
4.17 Internal Quality Audits
4.18 Training
4.19 Servicing
4.20 Statistical Techniques
For the assurance of customer satisfaction, the aerospace industry must produce world class quality products at the lowest possible cost. This document provides the quality system requirements and standardizes the compliance requirements resulting in cost savings due to the reduction or elimination of unique requirements developed for different customers.
DocumentType |
Standard
|
Pages |
20
|
PublisherName |
SAE International
|
Status |
Withdrawn
|
SupersededBy |
DD IEC/TS 62239:2003 | Process management for avionics. Preparation of an electronic components management plan |
SAE AS7110D | NADCAP REQUIREMENTS FOR WELDING/BRAZING |
SAE AS7115A | NATIONAL AEROSPACE AND DEFENSE CONTRACTORS ACCREDITATION PROGRAM REQUIREMENTS FOR ELASTOMER SEALS |
IEC TS 62239:2008 | Process management for avionics - Preparation of an electronic components management plan |
SAE AS7108C | NADCAP AUDIT CRITERIA FOR CHEMICAL PROCESSING |
SAE AS7116A | NATIONAL AEROSPACE AND DEFENSE CONTRACTORS ACCREDITATION PROGRAM REQUIREMENTS FOR NONCONVENTIONAL MACHINING |
EIA 4899 : 2001 | STANDARD FOR PREPARING AN ELECTRONIC COMPONENTS MANAGEMENT PLAN |
SAE J4000_199908 | Identification and Measurement of Best Practice in Implementation of Lean Operation |
17/30365636 DC : 0 | BS EN 62239-1 ED.1.0 - PROCESS MANAGEMENT FOR AVIONICS - MANAGEMENT PLAN - PART 1: PREPARATION AND MAINTENANCE OF AN ELECTRONIC COMPONENTS MANAGEMENT PLAN |
ANSI/ISO/ASQ Q9001:2008 | Quality Management Systems - Requirements |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.