• Shopping Cart
    There are no items in your cart

SCTE 165-14 : 2009

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

IPCABLECOM 1.5 - PART 14: EMBEDDED MTA ANALOG INTERFACE AND POWERING

Superseded date

06-03-2019

Superseded by

SCTE 165-14:2019

Published date

12-01-2013

Sorry this product is not available in your region.

1 INTRODUCTION
  1.1 PURPOSE
  1.2 SCOPE
  1.3 MOTIVATION
  1.4 DOCUMENT OVERVIEW
  1.5 REQUIREMENTS SYNTAX
2 REFERENCES
  2.1 NORMATIVE
  2.2 INFORMATIVE
  2.3 REFERENCE ACQUISITION
3 TERMS AND DEFINITIONS
4 ABBREVIATIONS AND ACRONYMS
5 INTRODUCTION
  5.1 IPCABLECOM OVERVIEW
  5.2 SERVICE GOALS
  5.3 IPCABLECOM REFERENCE ARCHITECTURE
  5.4 IPCABLECOM SPECIFICATIONS
  5.5 E-MTA MONITORING REQUIREMENTS
  5.6 E-MTA ALARMS
  5.7 E-MTA TELEMETRY
6 E-MTA POWER REQUIREMENTS
  6.1 POWER CONSIDERATIONS
  6.2 TYPICAL E-MTA TRAFFIC MODEL
  6.3 POWER PASSING TAP LIMITATIONS
  6.4 AVERAGE POWER CALCULATIONS
  6.5 POWER FACTOR CONSIDERATIONS
  6.6 E-MTA AVERAGE POWER REQUIREMENTS
  6.7 SERVICE REQUIREMENTS UNDER AC FAIL CONDITIONS
  6.8 POWER SOURCE COMPATIBILITY 6.9 NETWORK POWERING
  6.9 NETWORK POWERING
  6.10 LOCAL POWERING WITH BATTERY BACKUP
7 MTA ANALOG PORT REQUIREMENTS
  7.1 LOOP START SIGNALING
  7.2 GENERAL SUPERVISION
  7.3 GENERAL RINGING
  7.4 VOICE GRADE ANALOG TRANSMISSION

Describes requirements for the E-MTA analog interface and for powering of the E-MTA.

DocumentType
Standard
PublisherName
Society of Cable Telecomm Engineers
Status
Superseded
SupersededBy

SCTE 165-16 : 2016 IPCABLECOM 1.5 - PART 16: MANAGEMENT EVENT MECHANISM

TA NWT 000909 : ISSUE 2 GENERIC REQUIREMENTS AND OBJECTIVES FOR FIBER IN THE LOOP SYSTEMS
SCTE 165-3 : 2016 IPCABLECOM 1.5 - PART 3: NETWORK-BASED CALL SIGNALING PROTOCOL
TR NWT 000303 : ISSUE 2 SUPP 1 INTEGRATED DIGITAL LOOP CARRIER SYSTEM GENERIC REQUIREMENTS, OBJECTIVES, AND INTERFACE (A MODULE OF TSGR, FR-NWT-000440)
SCTE 165-1 : 2009 IPCABLECOM 1.5 - PART 1: ARCHITECTURE FRAMEWORK TECHNICAL REPORT
GR 517 CORE : ISSUE 1 GENERIC REQUIREMENTS FOR TRAFFIC CAPACITY AND ENVIRONMENT FOR VOICE AND DATA ACCESS TO ATM AND IP CORE NETWORKS
SCTE 135-5 : 2017 DOCSIS 3.0 - PART 5: CABLE MODEM TO CUSTOMER PREMISE EQUIPMENT INTERFACE
SCTE 165-16 : 2016 IPCABLECOM 1.5 - PART 16: MANAGEMENT EVENT MECHANISM
GR 499 CORE : ISSUE 4 TRANSPORT SYSTEMS GENERIC REQUIREMENTS (TSGR): COMMON REQUIREMENTS
SCTE 23-1 : 2017 DOCSIS 1.1 - PART 1: RADIO FREQUENCY INTERFACE
SCTE 23-3 : 2017 DOCSIS 1.1 - PART 3: OPERATIONS SUPPORT SYSTEM INTERFACE
SCTE 165-2 : 2016 IPCABLECOM 1.5 - PART 2: AUDIO/VIDEO CODECS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.