• Shopping Cart
    There are no items in your cart

UIC 719 : 3ED 2008

Current

Current

The latest, up-to-date edition.

EARTHWORKS AND TRACK BED CONSTRUCTION FOR RAILWAY LINES

Published date

12-01-2013

Sorry this product is not available in your region.

Describes earthworks and track beds for ballasted track.

DocumentType
Standard
PublisherName
Union Internationale des Chemins de Fer
Status
Current

EN 15528:2015 Railway applications - Line categories for managing the interface between load limits of vehicles and infrastructure
BS 6031:2009 Code of practice for earthworks
UNE-EN 15528:2016 Railway applications - Line categories for managing the interface between load limits of vehicles and infrastructure
DIN EN 15528:2016-01 Railway applications - Line categories for managing the interface between load limits of vehicles and infrastructure
09/30093255 DC : 0 BS 6031 - CODE OF PRACTICE FOR EARTHWORKS
BS EN 15528:2015 Railway applications. Line categories for managing the interface between load limits of vehicles and infrastructure
PREN 15528 : DRAFT 2013 RAILWAY APPLICATIONS - LINE CATEGORIES FOR MANAGING THE INTERFACE BETWEEN LOAD LIMITS OF VEHICLES AND INFRASTRUCTURE
I.S. EN 15528:2015 RAILWAY APPLICATIONS - LINE CATEGORIES FOR MANAGING THE INTERFACE BETWEEN LOAD LIMITS OF VEHICLES AND INFRASTRUCTURE
13/30270305 DC : 0 BS EN 15528 - RAILWAY APPLICATIONS - LINE CATEGORIES FOR MANAGING THE INTERFACE BETWEEN LOAD LIMITS OF VEHICLES AND INFRASTRUCTURE

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.