08/30183528 DC : 0
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
BS EN 50518-2 - ALARM SYSTEMS - MONITORING AND ALARM RECEIVING CENTER - PART 2: TECHNICAL REQUIREMENTS
Hardcopy , PDF
30-09-2011
English
Introduction
1 Scope
2 Normative references
3 Definitions and abbreviations
3.1 Definitions
3.2 Abbreviations
4 Performance requirements
5 Communication requirements
6 Reception of signals
6.1 General requirements
6.2 Operator actions
7 Testing
7.1 Daily checks
7.2 Weekly checks
7.3 Fault procedures and reporting
8 Data
8.1 Client data
8.2 Data of incoming signals
8.3 Data of ARC external communications
8.4 Log of operator actions
9 Data storage
10 Availability and verification of performance of the ARC
11 Contingency plan
11.1 General
11.2 Abnormal occurrence examples
Defines the technical requirements of an ARC. It also includes functional performance criteria and verification of performance.
Committee |
GW/1/11
|
DocumentType |
Draft
|
Pages |
12
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
PREN 50518-2 : DRAFT 2008 | Identical |
EN 50518-1:2013 | MONITORING AND ALARM RECEIVING CENTRE - PART 1: LOCATION AND CONSTRUCTION REQUIREMENTS |
EN 50136-1:2012 | Alarm systems - Alarm transmission systems and equipment - Part 1: General requirements for alarm transmission systems |
EN 50131-1:2006/A2:2017 | ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 1: SYSTEM REQUIREMENTS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.