• There are no items in your cart

08/30183528 DC : 0

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

BS EN 50518-2 - ALARM SYSTEMS - MONITORING AND ALARM RECEIVING CENTER - PART 2: TECHNICAL REQUIREMENTS

Available format(s)

Hardcopy , PDF

Superseded date

30-09-2011

Superseded by

BS EN 50518-2:2013

Language(s)

English

€23.37
Excluding VAT

Introduction
1 Scope
2 Normative references
3 Definitions and abbreviations
   3.1 Definitions
   3.2 Abbreviations
4 Performance requirements
5 Communication requirements
6 Reception of signals
   6.1 General requirements
   6.2 Operator actions
7 Testing
   7.1 Daily checks
   7.2 Weekly checks
   7.3 Fault procedures and reporting
8 Data
   8.1 Client data
   8.2 Data of incoming signals
   8.3 Data of ARC external communications
   8.4 Log of operator actions
9 Data storage
10 Availability and verification of performance of the ARC
11 Contingency plan
   11.1 General
   11.2 Abnormal occurrence examples

Defines the technical requirements of an ARC. It also includes functional performance criteria and verification of performance.

Committee
GW/1/11
DocumentType
Draft
Pages
12
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

Standards Relationship
PREN 50518-2 : DRAFT 2008 Identical

EN 50518-1:2013 MONITORING AND ALARM RECEIVING CENTRE - PART 1: LOCATION AND CONSTRUCTION REQUIREMENTS
EN 50136-1:2012 Alarm systems - Alarm transmission systems and equipment - Part 1: General requirements for alarm transmission systems
EN 50131-1:2006/A2:2017 ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 1: SYSTEM REQUIREMENTS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.