ANSI C50.10 : 1990
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
ROTATING ELECTRICAL MACHINERY - SYNCHRONOUS MACHINES
23-07-2013
12-01-2013
The requirements for machines with excitation windings are covered as follows: ANSR for Cylindrical Rotor Synchronous Generators, C50.10-1977. ANSR for Cylindrical Rotor Synchronous Generators, C50.13-1977. ANSR for Combustion Gas Turbine Driven Synchronous Generators C50.14-1977. This standard applies to all types of 60 Hz synchronous machines except fractional horse-power motors. Requirements for cylindrical rotor synchronous generators and combustion gas turbine driven synchronous generators will be found in ANSI C50.13-1977 AND C50.14-1977.
Committee |
ANSI
|
DocumentType |
Standard
|
PublisherName |
American National Standards Institute
|
Status |
Withdrawn
|
IEEE 141 : 1993 | IEEE Recommended Practice for Electric Power Distribution for Industrial Plants |
MIL-HDBK-705 Revision C:1987 | GENERATOR SETS, ELECTRICAL, MEASUREMENTS AND INSTRUMENTATIONS |
IEEE DRAFT 387 : D9A MAR 95 | DRAFT STANDARD CRITERIA FOR DIESEL-GENERATOR UNITS APPLIED AS STANDBY POWER SUPPLIES FOR NUCLEAR POWER GENERATING STATIONS |
IEEE DRAFT 1147 : D8 2005 | GUIDE FOR THE REHABILITATION OF HYDROELECTRIC POWER PLANTS |
MIL-G-19826 Revision F:1984 | GENERATOR SET, DIESEL ENGINE, ALTERNATING CURRENT FOR FACILITIES CONSTRUCTION, 1O KW THRU 500 KW (NOT STOCKED) |
CC-G-2745 Base Document:1984 | GENERATOR SETS, DIESEL ENGINE, ALTERNATING CURRENT, FOR FACILITIES CONSTRUCTION; 10 KW THROUGH 1000 KW (NOT STOCKED) |
IEEE DRAFT 1248 : D7 97 | DRAFT GUIDE FOR THE COMMISSIONING OF ELECTRICAL SYSTEMS IN HYDROELECTRIC POWER PLANTS |
IEEE DRAFT C62.92.2 : 1999 | DRAFT GUIDE FOR THE APPLICATION OF NEUTRAL GROUNDING IN ELECTRICAL UTILITY SYSTEMS, PART 2 - GROUNDING OF SYNCHRONOUS GENERATOR SYSTEMS |
NEMA CC1 : 2009(R2015) | ELECTRIC POWER CONNECTORS FOR SUBSTATIONS |
IEEE 387-1995 | IEEE Standard Criteria for Diesel-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations |
IEEE C37.101-2006 REDLINE | IEEE Guide for Generator Ground Protection |
API 11PGT : 1992 | RECOMMENDED PRACTICE FOR PACKAGED COMBUSTION GAS TURBINES |
IEEE DRAFT C37.102 : D8 2006 | AC GENERATOR PROTECTION |
IEEE 95-2002 | IEEE Recommended Practice for Insulation Testing of AC Electric Machinery (2300 V and Above) With High Direct Voltage |
IEEE C37.102-2006 REDLINE | IEEE Guide for AC Generator Protection |
IEEE 421B-1979 | IEEE Standard for High-Potential-Test Requirements for Excitation Systems for Synchronous Machines |
IEEE C62.92.2-1989 | IEEE Guide for the Application of Neutral Grounding in Electrical Utility Systems, Part II - Grounding of Synchronous Generator Systems |
IEEE DRAFT 1010 : D10 2005 | GUIDE FOR CONTROL OF HYDROELECTRIC POWER PLANTS |
IEEE 1147-2005 | IEEE Guide for the Rehabilitation of Hydroelectric Power Plants |
IEEE C50.13-2014 | IEEE Standard for Cylindrical-Rotor 50 Hz and 60 Hz Synchronous Generators Rated 10 MVA and Above |
IEEE DRAFT C37.96 : D5 99 | DRAFT GUIDE FOR AC MOTOR PROTECTION |
ANSI C50.12 : 2005 | SYNCHRONOUS GENERATORS AND GENERATOR/MOTORS FOR HYDRAULIC TURBINE APPLICATIONS, REQUIREMENTS FOR SALIENT POLE SYNCHRONOUS |
IEEE C50.13-2014 | IEEE Standard for Cylindrical-Rotor 50 Hz and 60 Hz Synchronous Generators Rated 10 MVA and Above |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.