BS 6031:1981
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
Code of practice for earthworks
Hardcopy , PDF
31-12-2009
English
30-06-1981
Foreword
Code drafting committee
Code of practice
Section one. General
1. Scope
2. References
3. Definitions
3.1 General
3.2 Terms used in section two
3.3 Terms used in section three
3.4 Terms used in timbering
4. Safety procedures
4.1 General
4.2 Statutory obligations
4.3 Precautions against incidental hazards
Section two. Cuttings and embankments, grading and
levelling
5. Site conditions and investigations
5.1 General
5.2 Economic and environmental considerations
5.3 Risks of failure and acceptance of deformation
6. Cuttings
6.1 General considerations
6.2 Factors governing the stability of cutting slopes
6.3 Modes of failure of cuttings and natural slopes
6.4 Methods of analysis of stability of slopes
6.5 Design
6.6 Monitoring of slopes
7. Embankments and general filling
7.1 General factors affecting the design of
embankments
7.2 Strength and deformation characteristics of
foundations and fill materials
7.3 Design of embankments
7.4 Drainage
7.5 Special site conditions affecting embankment or
general fill design
7.6 Suitability of materials for fill
8. Excavation and filling
8.1 Planning
8.2 Preparation of site
8.3 Excavation
8.4 Earth-moving
8.5 Deposition and spreading
8.6 Control
8.7 Inclement weather during construction
8.8 Haul roads
8.9 Advanced earthworks
8.10 Stage construction
8.11 The disposal of spoil
9. Compaction
9.1 General
9.2 Test for compaction of earthworks
9.3 Methods of compaction
9.4 Soil compaction characteristics
9.5 Control of compaction in the field
9.6 Compaction adjacent to structures
10. The operation of construction plant for earthworks
10.1 Classification of plant
10.2 Particular factors affecting earth-moving plant
10.3 Preparation for excavation
10.4 Excavation and earth-moving plant
10.5 Compaction equipment
10.6 Specialist plant and equipment
10.7 Safety measures
11. Maintenance and protection of slopes
11.1 General
11.2 Maintenance of slopes
11.3 Sources of erosion
11.4 Methods of protection
11.5 Remedial works after slope failure
Section three. Trenches, pits and shafts
12. Design considerations
12.1 Site investigation
12.2 Ground conditions
12.3 The design of stable slopes and supports to
excavations
12.4 Practical considerations
13. Construction procedure
13.1 Temporary support of excavations
13.2 Backfilling
13.3 Support of excavation by diaphragm walls or cast-
in-place bored piles
14. Trenches
14.1 Construction methods
14.2 Statutory obligations
14.3 Excavation procedure
14.4 Mechanical excavation of trenches
14.5 Hand excavation of trenches
14.6 Methods of dewatering trenches
14.7 Installation of permanent work or materials in
trenches
14.8 Backfilling and reinstatement of surface
14.9 Special cases
15. Pits and shafts
15.1 General
15.2 Methods of support of excavations
15.3 Drainage
15.4 Striking of supports and backfilling
15.5 Alternative methods of sinking
15.6 Use of ground treatment processes
16. Excavation in rock
16.1 General
16.2 Rock excavation by mechanical or hand methods
16.3 Rock excavation by drilling and blasting
16.4 Removal of loosened rock
Appendices
A. Descriptions of construction plant for earthworks
B. List of references
Tables
1. British soil classification system for engineering
purposes and field identification
2. Field characteristics of soils and other materials
used in earthworks
3. Design of slopes in rock cuttings and embankments
4. Typical compaction characteristics for natural
soils, rocks and artificial materials used in
earthwork construction
Figures
1. short and long term stability of cutting and
embankment slopes
2. Types of rotational slide
3. Successive rotational slide
4. Multiple retrogressive slide
5. Slab slide
6. Block slide
7. Wedge failure
8. Toppling failure
9. Fall
10. Slip circle analysis (undrained shear strength su
constant with depth)
11. Slip circle analysis (undrained shear strength su
varies
12. Slip circle analysis (effective stress method)
13. Effect of tension cracks on slope stability
14. Non-circular slide on weak soil layer
15. Planar slide on infinite slope - stability analysis
16. Steep soil slope retained by ground anchors
17. Unstable rock slope stabilized by rock bolts
18. Slab slide stabilized by dowel bolts
19. Reinforced earth
20. Variation of undrained shear strength with moisture
content for typical soils compacted using the
2.5 kg rammer method (BS 1377) at moisture contents
above the optimum value
21. Envelope of strut loads on braced excavations
22. Water-bearing permeable soils: seepage and uplift
23. Typical single or centre waling poling frame
24. Close poling with tucking frames
25. Support of deep excavation by horizontal sheeting
and soldier piles
26. Trench excavation using steel trench sheets as
runners
27. Typical medium-depth trench with steel sheet piling
in bad ground
28. Wide and deep trench using steel sheet piling
29. Blockings, chocks or chogs
30. Trenches with sloping sides
31. Method of lowering long steel pipes byuse of
temporary strutting
32. Trench timbering for quay walls, etc.
33. Method of excavating isolated pits and shafts
34. Rock excavation by drilling and blasting: general
excavation
35. Rock excavation by drilling and blasting: pits and
shafts
Applies to earthworks forming part of general civil engineering construction such as highways, railways and airfields; bulk excavation for major structures and excavations in pit shafts and trenches for pipelines and drainage works.
Committee |
B/526
|
DevelopmentNote |
Supersedes 77/13223 DC (09/2005)
|
DocumentType |
Standard
|
Pages |
124
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
Supersedes |
Standards | Relationship |
UNE-EN IEC 61784-2-13:2023 | Identical |
BS 8000-14:1989 | Workmanship on building sites Code of practice for below ground drainage |
BS 6349-5:1991 | Maritime structures Code of practice for dredging and land reclamation |
BS 6349-2:1988 | Maritime structures Design of quay walls, jetties and dolphins |
BS 5607:1998 | Code of practice for the safe use of explosives in the construction industry |
09/30093258 DC : DRAFT JUNE 2009 | BS 8006-1 - CODE OF PRACTICE FOR STRENGTHENED/REINFORCED SOILS AND OTHER FILLS |
BS 8000-1:1989 | Workmanship on building sites Code of practice for excavation and filling |
BS 6100-2.2.1:1992 | Glossary of building and civil engineering terms. Civil engineering. Substructures. Earthworks. Foundations. Tunnels Earthworks |
BS 6031:2009 | Code of practice for earthworks |
BS 6349-1:2000 | Maritime structures Code of practice for general criteria |
BS 4428:1989 | Code of practice for general landscape operations (excluding hard surfaces) |
BS 7777-3:1993 | Flat-bottomed, vertical, cylindrical storage tanks for low temperature service Recommendations for the design and construction of prestressed and reinforced concrete tanks and tank foundations, and for the design and installation of tank insulation, tank liners and tank coatings |
BS 8002:1994 | Code of practice for earth retaining structures |
PD 8010-1:2004 | Code of practice for pipelines Steel pipelines on land |
BS 5955-6:1980 | Plastics pipework (thermoplastics materials) Code of practice for the installation of unplasticized PVC pipework for gravity drains and sewers |
07/30150912 DC : 0 | BS 5975 - CODE OF PRACTICE FOR THE PROCEDURAL CONTROL OF TEMPORARY WORKS AND THE PERMISSIBLE STRESS DESIGN OF FALSEWORK |
06/30116678 DC : DRAFT JUN 2006 | UK NATIONAL ANNEX TO EUROCODE 7 - GEOTECHNICAL DESIGN - GENERAL RULES |
BS 8301:1985 | Code of practice for building drainage |
09/30093195 DC : 0 | BS 6349-2 - MARITIME WORKS - PART 2: CODE OF PRACTICE FOR THE DESIGN OF QUAY WALLS, JETTIES AND DOLPHINS |
BS 7572:1992 | Code of practice for thermally insulated underground piping systems |
09/30093255 DC : 0 | BS 6031 - CODE OF PRACTICE FOR EARTHWORKS |
BS 8006:1995 | Code of practice for strengthened/reinforced soils and other fills |
BS 6543(1985) : 1985 | GUIDE TO USE OF INDUSTRIAL BY-PRODUCTS AND WASTE MATERIALS IN BUILDING AND CIVIL ENGINEERING |
BS 5975:1996 | Code of practice for falsework |
BS 5930:1981 | Code of practice for site investigations |
BS 1337(1946) : LATEST | GENERAL-PURPOSE JOINTING MATERIALS FOR GAS-HEATED DOMESTIC APPLIANCES AND GAS INSTALLATION PIPES IN BUILDINGS |
BS CP2004(1972) : AMD 1755 | CODE OF PRACTICE FOR FOUNDATIONS |
BS CP110(1972) : LATEST | |
BS 5607:1978 | Code of practice for the safe use of explosives in the construction industry |
BS CP2(1943) : LATEST | HEATING AND HOT WATER SERVICE INSTALLATIONS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.