
BS CECC 265001:1998
Current
The latest, up-to-date edition.

Harmonized system of quality assessment for electronic components. Technology approval schedule. Film and hybrid integrated circuits
Hardcopy , PDF
English
15-07-1999
Foreword
Introduction
1 General
1.1 Scope
1.2 Related documents
1.3 Units, symbols and terminology
1.4 Standard and preferred values
1.5 Definitions
2 Definition of the circuit technology
2.1 Scope
2.2 Description of activities and flowcharts
2.3 Technical abstract
3 Circuit design
3.1 Scope
3.2 Description of activities and flowcharts
3.3 Interfaces
4 Film substrate manufacture
4.1 Scope
4.2 Description of activities and flowcharts
4.3 Materials, inspection and handling
4.4 Equipment
4.5 Rework
4.6 Validation and control of the process(es)
4.7 Subcontractors
5 Assembly
5.1 Scope
5.2 Description of activities and flowcharts
5.3 Materials, inspection and handling
5.4 Equipment
5.5 Rework
5.6 Validation and control of the process(es)
5.7 Subcontractors
6 Testing
6.1 Scope
6.2 Description of activities and flowcharts
6.3 Equipment
6.4 Test procedures
6.5 Interfaces
7 Verification
7.1 Process boundary verification
7.2 Product verification
7.3 Initial demonstration programme
8 Process characterization
8.1 Identification of process characteristics
8.2 Description of activities
9 Packaging and shipping
9.1 Description of activities and flowcharts
9.2 Interfaces
9.3 Validity of release
10 Withdrawal of technology approval
Figures
1 Example flowchart - Administration
2 Example flowchart - Design
3 Example flowchart - Film substrate manufacture
4 Example flowchart - Screen manufacture
5 Example flowchart - Component/package assembly
6 Example flowchart - Hybrid test
7 Example flowchart - Packing and Shipping
Annexes
A Example Abstract Description of Technology Approval
B Guidance on the preparation of a manufacturer's Technology Approval
Declaration Document (TADD) for Film and Hybrid Integrated Circuits
Specifies terms, definitions, symbols, quality system assessment and verification methods and other requirements relevant to the design, manufacture and supply in accordance with the CECC System for electronic components of assessed quality.
Committee |
EPL/47
|
DevelopmentNote |
Reviewed and confirmed by BSI, Feb 2005. (02/2005)
|
DocumentType |
Standard
|
Pages |
36
|
PublisherName |
British Standards Institution
|
Status |
Current
|
Standards | Relationship |
CECC 265-001 : 1998 | Identical |
IEC 60068-1:2013 | Environmental testing - Part 1: General and guidance |
CECC 00114-5 : 94 AMD 2 | PROCESS APPROVAL OF SPECIALIST CONTRACTORS WITHIN THE ELECTRONIC COMPONENTS INDUSTRY |
EN 100114-1 : 1996 | RULE OF PROCEDURE - QUALITY ASSESSMENT PROCEDURES - PART 1: CECC REQUIREMENTS FOR THE APPROVAL OF AN ORGANIZATION |
CECC 00114-6 : 1994 | TECHNOLOGY APPROVAL OF ELECTRONIC COMPONENT MANUFACTURERS |
CECC 00016 : 1990 | BASIC SPECIFICATION - BASIC REQUIREMENTS FOR THE USE OF STATISTICAL PROCESS CONTROL (SPC) IN THE CECC SYSTEM |
CECC 00111 : 80 AMD 3 | CECC RULES OF PROCEDURE: RP 11: SPECIFICATIONS AND THEIR HARMONIZATION - COMPONENTS FOR GENERAL AND PROFESSIONAL USAGE - COMPONENTS OF ENHANCED ASSESSMENT OF QUALITY |
IEC 60749:1996+AMD1:2000+AMD2:2001 CSV | Semiconductor devices - Mechanical and climatic test methods |
CECC 00200 : 2002 | REGISTER OF FIRMS, PRODUCTS AND SERVICES APPROVED UNDER CECC CERTIFICATION SYSTEM FOR ELECTRONIC COMPONENTS |
CECC 00300 : 1996 | REGISTER OF CECC SPECIFICATIONS |
CECC 00401 : 91 AMD 1 | GLOSSARY OF ABBREVIATIONS, TERMS AND DEFINITIONS OF THE CECC SYSTEM |
CECC 00007 : 1978 | BASIC SPECIFICATION: SAMPLING PLANS AND PROCEDURES FOR INSPECTION BY ATTRIBUTES |
CECC 00400 : 86 ERRATUM 92 | HANDBOOK FOR THE PRODUCTION OF CECC DOCUMENTS |
EN ISO 9000:2015 | Quality management systems - Fundamentals and vocabulary (ISO 9000:2015) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.
Logging out.