• Shopping Cart
    There are no items in your cart

BS EN 62264-3:2017

Current

Current

The latest, up-to-date edition.

Enterprise-control system integration Activity models of manufacturing operations management

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

16-06-2017

€395.12
Excluding VAT
Summarise this standard

Committee
GEL/65/3
DevelopmentNote
Supersedes 06/30148814 DC. (11/2007) Supersedes 15/30315270 DC. (06/2017)
DocumentType
Standard
Pages
90
PublisherName
British Standards Institution
Status
Current
Supersedes

IEC62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level4 functions and the process control functions, defined as the Level2 functions of IEC62264-1. IEC62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level4 functions and the process control functions, defined as the Level2 functions of IEC62264-1. This second edition cancels and replaces the first edition published in 2007. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous edition:
a) 4.1 Manufacturing Operations Management was moved to Part1 and therefore was removed from Part3;
b) 4.2 Functional hierarchy was moved to Part 1 and therefore was removed from Part3;
c) 4.4 Criterion for defining activities below Level 4 was moved to Part1 and therefore was removed from Part3;
d) 4.5 Categories of production information was moved to Part 1 and therefore was removed from Part3;
e) 4.6 Manufacturing operations information was moved to Part 1 and therefore was removed from Part3;
f) 5.3 Expanded equipment hierarchy model was moved to Part1 and therefore was removed from Part3;
g) 5.4 Expanded decision hierarchy model was removed from Part3. The corresponding section was removed from Part 1 and replaced with a reference to ISO15704;
h) Annex A (informative) Other enterprise activities affecting manufacturing operations was moved to Part 1 and therefore was removed from Part3;
i) Annex D (informative) Associated standards was moved to Part1 and therefore was removed from Part3;
j) Annex F (informative) Applying the decision hierarchy model to manufacturing operations management was removed from Part3. The corresponding section was removed from Part1 and replaced with a reference to ISO15704;
k) Annex G (informative) Mapping PSLX ontology to manufacturing operations management was removed from Part3. The committee felt that this section is more appropriate as a PSLX white paper or TR.
The names for data were changed to match the Part4 standard names. These name changes were made in all figures and in the text.

€395.12
Excluding VAT