• Shopping Cart
    There are no items in your cart

EN 62264-3:2017

Current

Current

The latest, up-to-date edition.

Enterprise-control system integration - Part 3: Activity models of manufacturing operations management

Published date

24-03-2017

Sorry this product is not available in your region.
Summarise this standard

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Structuring concepts
5 Structuring models
6 Production operations management
7 Maintenance operations management
8 Quality operations management
9 Inventory operations management
10 Completeness, compliance and conformance
Annex A - (informative) Technical and responsibility
          boundaries
Annex B - (informative) Scheduling hierarchy
Annex C - (informative) Frequently asked questions
Annex D - (informative) Advanced planning and scheduling
          concepts for manufacturing operations management
Bibliography
Annex ZA (normative) - Normative references to international
         publications with their corresponding European
         publications

It defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. The scope of this standard is limited to: - a model of the activities associated with manufacturing operations management, Level 3 functions; - an identification of some of the data exchanged between Level 3 activities.

Committee
CLC/TC 65X
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Current
Supersedes

Sorry this product is not available in your region.