Introduction
1 Scope
2 Definitions
3 Approach adopted for the Guide
3.1 General
3.2 Entities Involved In the Life Cycle Phases of Rolling Stock
4 Application of this Guide
4.1 Object of the application
4.2 Application of EN 50126-1
4.2.1 Assessment of the application of EN 50126-1
4.2.2 Mandatory requirements for the application of EN 50126-1
5 Specifying RAM requirements
5.1 Introduction
5.2 Preliminary RAM analysis
5.2.1 General
5.2.2 Preliminary RAM Analysis activities
5.3 RAM requirements
5.3.1 Introduction
5.3.2 Reliability Targets
5.3.3 Maintainability Targets
5.3.4 Availability Targets
5.4 Process for choosing RAM figures
5.5 RAM Programme
5.5.1 Introduction
5.5.2 Configuration Management System
5.5.3 RAM Programme Outline
5.5.4 Example of RAM Analyses Document Template and Data
6 RAM Assurance during Life Cycle
6.1 RAM Programme and Phases of the Life Cycle
6.1.1 Introduction
6.1.2 Tender Phase
6.1.3 Design Phase
6.1.4 Demonstration Phase
7 RAM Parameters to be incorporated into LCC Model
7.1 Introduction
7.2 Overview of LCC Modelling
7.3 RAM parameters for LCC
Annex A Examples of breakdown structure
Bibliography