CSA Z741 : 2012 : R2017
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
GEOLOGICAL STORAGE OF CARBON DIOXIDE
Hardcopy , PDF
29-07-2021
English
01-01-2017
Preface
1 Scope
2 Reference publications
3 Definitions
4 Management systems
5 Site screening, selection, and characterization
6 Risk management
7 Well infrastructure development
8 Monitoring and verification
9 Closure
Sets up requirements and recommendations for the geological storage of carbon dioxide.
DocumentType |
Standard
|
Pages |
80
|
ProductNote |
Reconfirmed EN
|
PublisherName |
Canadian Standards Association
|
Status |
Superseded
|
Supersedes |
CFR 40(PTS100-149) : JUL 94 | PROTECTION OF ENVIRONMENT - ENVIRONMENTAL PROTECTION AGENCY |
API 10B-2 : 2013 | RECOMMENDED PRACTICE FOR TESTING WELL CEMENTS |
API TR 10TR1 : 2008 | CEMENT SHEATH EVALUATION |
ISO 10427-2:2004 | Petroleum and natural gas industries — Equipment for well cementing — Part 2: Centralizer placement and stop-collar testing |
API 5CT : 2012 | CASING AND TUBING |
ISO 10426-5:2004 | Petroleum and natural gas industries — Cements and materials for well cementing — Part 5: Determination of shrinkage and expansion of well cement formulations at atmospheric pressure |
API 5LC : 2015 | CRA LINE PIPE |
API 6A : 2010 | SPECIFICATION FOR WELLHEAD AND CHRISTMAS TREE EQUIPMENT |
ISO 13679:2002 | Petroleum and natural gas industries Procedures for testing casing and tubing connections |
ISO 31000:2009 | Risk management Principles and guidelines |
ISO 14313:2007 | Petroleum and natural gas industries — Pipeline transportation systems — Pipeline valves |
API SPEC 15HR : 2016 | HIGH-PRESSURE FIBERGLASS LINE PIPE |
NACE TM 01 77 : 2016 | LABORATORY TESTING OF METALS FOR RESISTANCE TO SULFIDE STRESS CRACKING AND STRESS CORROSION CRACKING IN H[2]S ENVIRONMENTS |
ISO 3183:2012 | Petroleum and natural gas industries Steel pipe for pipeline transportation systems |
CAN/CSA-Z662-15 | Oil and gas pipeline systems |
ASME B31.4 : 2016 | PIPELINE TRANSPORTATION SYSTEMS FOR LIQUIDS AND SLURRIES |
API 5L : 2012 | LINE PIPE |
API 10A : 2011 | SPECIFICATION FOR CEMENTS AND MATERIALS FOR WELL CEMENTING |
ISO 10427-1:2001 | Petroleum and natural gas industries — Equipment for well cementing — Part 1: Casing bow-spring centralizers |
ISO 10426-1:2009 | Petroleum and natural gas industries Cements and materials for well cementing Part 1: Specification |
ISO 10426-2:2003 | Petroleum and natural gas industries — Cements and materials for well cementing — Part 2: Testing of well cements |
ISO 10426-4:2004 | Petroleum and natural gas industries Cements and materials for well cementing Part 4: Preparation and testing of foamed cement slurries at atmospheric pressure |
ISO 13678:2010 | Petroleum and natural gas industries Evaluation and testing of thread compounds for use with casing, tubing, line pipe and drill stem elements |
API 15LR : 2001 | SPECIFICATION FOR LOW PRESSURE FIBERGLASS LINE PIPE |
API 6J : 1992 | BULLETIN ON TESTING OF OILFIELD ELASTOMERS - A TUTORIAL |
ISO 10427-3:2003 | Petroleum and natural gas industries — Equipment for well cementing — Part 3: Performance testing of cementing float equipment |
ISO 14310:2008 | Petroleum and natural gas industries — Downhole equipment — Packers and bridge plugs |
ISO 14001:2015 | Environmental management systems — Requirements with guidance for use |
API 5C2 : 1999 | BULLETIN ON PERFORMANCE PROPERTIES OF CASING, TUBING AND DRILL PIPE |
API 5A3 : 2011 | RECOMMENDED PRACTICE ON THREAD COMPOUNDS FOR CASING, TUBING, LINE PIPE, AND DRILL STEM ELEMENTS |
ISO 9001:2015 | Quality management systems — Requirements |
API 6D :2015 | SPECIFICATION FOR PIPELINE AND PIPING VALVES |
API SPEC 11D1 : 2015 | PACKERS AND BRIDGE PLUGS |
ISO/TR 10400:2007 | Petroleum and natural gas industries Equations and calculations for the properties of casing, tubing, drill pipe and line pipe used as casing or tubing |
API TR 5C3 : 2008 | CALCULATING PERFORMANCE PROPERTIES OF PIPE USED AS CASING OR TUBING |
API E3 : 1993 | WELLBORE PLUGGING AND ABANDONMENT PRACTICES |
API 53 : 2012 | BLOWOUT PREVENTION EQUIPMENT SYSTEMS FOR DRILLING WELLS |
API 5C5 : 2017 | PROCEDURES FOR TESTING CASING AND TUBING CONNECTIONS |
ISO 11960:2014 | Petroleum and natural gas industries Steel pipes for use as casing or tubing for wells |
API 5LD : 2017 | CRA CLAD OR LINED STEEL PIPE |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.