• Shopping Cart
    There are no items in your cart

DEFSTAN 05-61(PT1)/3(1998) : 1998

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 1: DEVIATION/PRODUCTION PERMITS AND WAIVERS/CONCESSIONS - QUALITY ASSURANCE OF SUBCONTRACT WORK

Superseded date

26-04-2004

Published date

12-01-2013

Sorry this product is not available in your region.

Preface
Section One - Deviation/Production Permits and
              Waivers/Concessions
1 Scope
2 Definitions
3 General
4 Classification
5 Submission
6 Nonconformity on Subcontracts
7 Preventive Action
8 Endorsement of Documents
9 Supply of Application Forms for Deviation/Production
  Permits and Major Waivers/Concessions
Annex A - Application Form for a Deviation/Production
          Permit or Major Waivers/Concessions
Section Two - Quality Assurance of Subcontract Work
1 Scope
2 Definitions
3 General
4 MOD Quality Assurance Activity at Subcontractors
5 Unsatisfactory Items

Gives procedures that are to be adopted for Deviation/Production Permits and Waivers/Concessions.

DevelopmentNote
Supersedes DEFSTAN 05-61(PT1)/2(1987), DEFSTAN 05-61(PT1)/1(1983), DEFSTAN 05-61(PT1)/1(1980), DEFSTAN 05-61(PT1)/1(1976), DEFSTAN 05-61/1(1983), DEFSTAN 05-62(PT2)/1(1983), DEFSTAN 05-61(PT3)/1(1983) & QTM 3 (07/2003)
DocumentType
Standard
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy
Supersedes

DEFSTAN 05-61(PT18)/1(1992) : 1992 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 18: AIRCRAFT AND MUNITIONS PARACHUTES AND PARACHUTE ASSEMBLIES, HARNESSES AND PERSONNEL RESTRAINT HARNESSES FOR USE IN AIRCRAFT
DEFSTAN 23-6/3(2000) : 2000 GUIDE TO THE COMMON TECHNICAL REQUIREMENTS FOR MILITARY LOGISTIC VEHICLES AND TOWED EQUIPMENT
DEFSTAN 13-98/4(2002) : 2002 REQUIREMENTS FOR THE PROVISION OF GENERAL MUNITIONS TECHNICAL DATA FOR MINOR PROJECTS
DEFSTAN 05-61(PT11)/2(1992) : 1992 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 11: PROOF SENTENCING
DEFSTAN 05-57/4(2000) : 2000 CONFIGURATION MANAGEMENT OF DEFENSE MATERIAL
DEFSTAN 02-304(PT5)/2(2002) : 2002 SHAFTING SYSTEMS AND PROPULSORS - PART 5: REQUIREMENTS FOR HANDLING, MAINTENANCE AND REPAIR OF PROPELLERS FOR HM SURFACE SHIPS
DEFSTAN 13-92/3(1996) : 1996 MANUFACTURE, INSPECTION AND PROOF OF ORDNANCE OF 20 MM CALIBRE AND OVER
DEFSTAN 05-124/1(1992) : 1992 PROCEDURES FOR THE PROCUREMENT OF AIRCRAFT ENGINES AND THEIR ACCESSORIES

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.