DEFSTAN 00-55(PT2)/2(1997) : 1997 ERRATUM 1997
|
REQUIREMENTS FOR SAFETY RELATED SOFTWARE IN DEFENCE EQUIPMENT - PART 2: GUIDANCE
|
DEFSTAN 00-55(PT1)/2(1997) : 1997
|
REQUIREMENTS FOR SAFETY RELATED SOFTWARE IN DEFENCE EQUIPMENT - PART 1: REQUIREMENTS
|
DEFSTAN 00-970(PT0)/6(2010) : 2010
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 13-96(PT1)/4(2009) : 2009
|
LOTTING AND BATCHING OF AMMUNITION - PART 1: GENERAL REQUIREMENTS
|
DEFSTAN 00-970(PT0)/9(2012) : 2012
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 61-12(PT25)/2(1992) : 1992
|
WIRES, CORDS AND CABLES ELECTRICAL - METRIC UNITS - PART 25: CABLES ELECTRICAL LIMITED FIRE HAZARD, UP TO CONDUCTOR SIZE 2.5 SQ MM CROSS SECTIONAL AREA
|
DEFSTAN 00-970(PT0)/7(2011) : 2011
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 59-71(PT1)/2(1993) : 1993
|
CRIMPED ELECTRICAL CONNECTORS FOR COPPER CONDUCTORS - PART 1: GENERAL REQUIREMENTS
|
DEFSTAN 60-1(PT0)/2(2000) : 2000
|
CABLES, FIBRE OPTIC - PART 0: GENERAL REQUIREMENTS AND TEST METHODS
|
DEFSTAN 02-820/2(2002) : 2002
|
REQUIREMENTS FOR RUBBER FOR MACHINERY MOUNTS
|
DEFSTAN 00-970(PT0)/11(2013) : 2013
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 21-59/2(2006) : 2006
|
SYSTEMS ENGINEERING GUIDE FOR NAVAL COMBAT SYSTEMS
|
DEFSTAN 02-643/2(2002) : 2002
|
REQUIREMENTS FOR CABLES ELECTRICAL, SUB-MINIATURE AND SMALL MULTICORE, LIMITED FIRE HAZARD FOR SPECIAL PURPOSES
|
DEFSTAN 13-96(PT1)/3(1994) : 1994
|
LOTTING AND BATCHING OF AMMUNITION - PART 1: GENERAL REQUIREMENTS
|
DEFSTAN 00-970(PT0)/8(2011) : 2011
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 00-970(PT0)/10(2013) : 2013
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 00-970(PT0)/5(2007) : 2007
|
DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
|
DEFSTAN 05-57/4(2000) : 2000
|
CONFIGURATION MANAGEMENT OF DEFENSE MATERIAL
|
DEFSTAN 00-42(PT2)/1(1997) : 1997
|
RELIABILITY AND MAINTAINABILITY ASSURANCE GUIDES - PART 2: SOFTWARE
|
DEFSTAN 05-95/3(1995) : 1995
|
QUALITY SYSTEM REQUIREMENTS FOR THE DESIGN, DEVELOPMENT, SUPPLY AND MAINTENANCE OF SOFTWARE
|
DEFSTAN 02-518/1(2000) : 2000
|
REQUIREMENTS FOR LIMITED FIRE HAZARD (LFH) SHEATHING FOR ELECTRIC CABLES - CATEGORY 2
|
DEFSTAN 05-94/2(1995) : 1995
|
GUIDANCE ON QUALITY SYSTEM REQUIREMENTS FOR THE IMPLEMENTATION OF DEFSTANS 05-91, 05-92 AND 05-93
|
DEFSTAN 05-61(PT14)/1(1994) : 1994
|
QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 14: PROOF SCHEDULES FOR CONVENTIONAL WEAPONS, AMMUNITION AND EXPLOSIVE ITEMS OF NEW MANUFACTURE
|
DEFSTAN 61-12(PT9)/4(1993) : 1993
|
WIRES, CORDS AND CABLES ELECTRICAL - METRIC UNITS - PART 9: CABLES, RADIO FREQUENCY INCLUDING LIMITED FIRE HAZARD (LFH) VARIANTS
|