Introduction
1 Scope
2 Warning
3 Related Documents
4 Abbreviations and Definitions
4.1 Abbreviations
4.2 Definitions
5 Format
6 Power Critical Design Review
6.1 Purpose
6.2 Platform Power Critical Design Review Requirements
6.3 Platform and Terminal Equipment Power Critical Design
Review Requirements
7 Capacity
7.1 Capacity Requirements
7.2 Environmental Cable De-Rating
8 Batteries
8.1 Battery Requirements
9 Circuit Protection
9.1 Circuit Protection Requirements
10 Wiring Configuration
10.1 Cable Requirements
10.2 Example Wiring Configuration
10.3 Bespoke Platform Guidance
10.4 Wiring Configuration Requirements
11 Connections
11.1 Connectors Recommendations
12 Earthing
12.1 Earthing Requirements
13 Platform
13.1 Platform Requirements
14 Platform and Terminal Equipment
14.1 Platform and Terminal Equipment Requirements
15 Environmental
15.1 Environmental Requirements
15.2 Power Supply LRU/Component/Terminal Equipment Location
and Test Temperature
16 Quality Standard
16.1 Quality Management System (QMS)
16.2 UKAS Requirement
17 Test Equipment
17.1 Test Equipment Requirements
17.2 Tolerances
18 Electromagnetic Compatibility Legislation
19 Management and Planning
19.1 Management and Planning Requirements
19.2 Control and Management
19.3 Pass/Fail Criteria
Annex A - Platform Power Distribution Tests
A.1 General Requirements
A.2 DET01.A Steady State Voltage
A.3 DET02.A Ripple Voltage
A.4 DET03.A Long Transients
A.5 DET04.A Short Transients
A.6 DET05.A Circuit Protection
A.7 DET06.A Power Distribution Voltage Drop
A.8 DET07.A Cranking
A.9 DET08.A Terminal Equipment Battery Capacity Test
A.10 DIT01.A Platform/Terminal Earth Bond
A.11 DIT02.A Platform Over Voltage/Regulator Failure
A.12 DIT03.A Platform Imported Ripple (20Hz - 150kHz)
A.13 DIT04.A Platform Load Dump
Annex B - Platform and Terminal Equipment Tests
B.1 General Requirements
B.2 DET01.B Ripple
B.3 DET02.B Exported Transients
B.4 DET03.B Maximum Inrush Current
B.5 DIT01.B Positive Supply Isolation Test
B.6 DIT02.B Earth Bonding
B.7 DIT03.B Negative/Earth Bond Isolation
B.8 DIT04.B Cranking
B.9 DIT05.B Reverse Voltage
B.10 DIT06.B Under & Over-Voltage
B.11 DIT07.B Short Transients
B.12 DIT08.B Load Dump
Annex C - Related Documents
C.1 Related Documents
Annex D - Abbreviations
D.1 Abbreviations
Annex E - Cable Capacity De-Rating Factors
E.1 De-Rating Factors
Annex F - Power Critical Design Review - Example Forms
F.1 Amendment Status
F.2 Document History
F.3 Distribution List
F.4 PROJECT INFORMATION
F.5 Documents
F.6 Platform Details
F.7 Platform Working Environment
F.8 Platform and Terminal Equipment Power Distribution
Systems Requirements
F.9 Earthing Strategy
F.10 Circuit Protection
F.11 Connections
F.12 Installed Equipment
F.13 Test Requirements
F.14 Test Applicability
Annex G - Platform and Terminal Equipment Power Critical
Design Review - Example Documents
G.1 Equipment Details
G.2 Amendment Status
G.3 Document History
G.4 Distribution List
G.5 Introduction
G.6 Contact Details
G.7 Documents
G.8 Platform or Terminal Equipment Details
G.9 Platform and Terminal Equipment Working Environment
G.10 Platform and Terminal Equipment Design Requirements
G.11 Connectors
G.12 Test Requirements
Describes defines the characteristics for all military (ground) platform DC power distribution systems, platform and terminal equipment within the military, bespoke, military off the shelf (MOTS) and commercial off the shelf (COTS) vehicular environment.
DevelopmentNote |
Supersedes DEFSTAN 61-5(PT6)/5(1990). (03/2009)
|
DocumentType |
Standard
|
Pages |
130
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Withdrawn
|
Supersedes |
DEFSTAN 59-411(PT1)/2(2014) : 2014 | ELECTROMAGNETIC COMPATIBILITY - PART 1: MANAGEMENT AND PLANNING |
DEFSTAN 23-09/2(2011) : 2011 | GENERIC VEHICLE ARCHITECTURE (GVA) |
DEFSTAN 02-327/4(2016) : 2016 | STANDARDS FOR DEFENCE REQUIREMENTS AND GUIDANCE FOR THE PROCUREMENT OF PUMPS FOR AUXILIARY SYSTEMS |
DEFSTAN 23-09(PT1)/3(2013) : 2013 | GENERIC VEHICLE ARCHITECTURE (GVA) - PART 1: INFRASTRUCTURE |
DEFSTAN 23-009(PT0)/4(2016) : 2016 | GENERIC VEHICLE ARCHITECTURE (GVA) - PART 0: GVA APPROACH |
DEFSTAN 23-09(PT0)/3(2013) : 2013 | GENERIC VEHICLE ARCHITECTURE (GVA) - PART 0: GVA APPROACH |
AECTP-250 : 2014 | ELECTRICAL AND ELECTROMAGNETIC ENVIRONMENTAL CONDITIONS |
ISO/IEC 17025:2005 | General requirements for the competence of testing and calibration laboratories |
DEFSTAN 00-35(PT4)/4(2006) : 2006 | ENVIRONMENTAL HANDBOOK FOR DEFENCE MATERIEL - PART 4: NATURAL ENVIRONMENTS |
ISO 7637-3:2016 | Road vehicles — Electrical disturbances from conduction and coupling — Part 3: Electrical transient transmission by capacitive and inductive coupling via lines other than supply lines |
ISO 7637-1:2015 | Road vehicles — Electrical disturbances from conduction and coupling — Part 1: Definitions and general considerations |
STANAG 2601 : 2017 | STANDARDIZATION OF ELECTRICAL SYSTEMS IN TACTICAL LAND VEHICLES |
DEFSTAN 00-35(PT6)/4(2006) : 2006 | ENVIRONMENTAL HANDBOOK FOR DEFENCE MATERIEL - PART 6: INDUCED CLIMATIC, CHEMICAL AND BIOLOGICAL ENVIRONMENTS |
DEFSTAN 23-6/4(2005) : 2005 | TECHNOLOGY GUIDANCE FOR MILITARY LOGISTICS VEHICLES |
ISO 7637-2:2011 | Road vehicles Electrical disturbances from conduction and coupling Part 2: Electrical transient conduction along supply lines only |
DEFSTAN 59-411(PT4)/1(2007) : 2007 | ELECTROMAGNETIC COMPATIBILITY - PART 4: PLATFORM AND SYSTEM TEST AND TRIALS |
VG 95218-5 : 2007 | ELECTRICAL CABLES AND INSULATED WIRES - PART 5: CURRENT RATING |
DEFSTAN 00-35(PT3)/4(2006) : 2006 | ENVIRONMENTAL HANDBOOK FOR DEFENCE MATERIEL - PART 3: ENVIRONMENTAL TEST METHODS |
DEFSTAN 59-411(PT3)/1(2007) : 2007 | ELECTROMAGNETIC COMPATIBILITY - PART 3: TEST METHODS AND LIMITS FOR EQUIPMENT AND SUB SYSTEMS |
AQAP 2000 : 2009 | NATO POLICY ON AN INTEGRATED SYSTEMS APPROACH TO QUALITY THROUGH THE LIFE CYCLE |
DEFCON 602A : 2006 | QUALITY ASSURANCE (WITH DELIVERABLE QUALITY PLAN) |
ISO 9001:2015 | Quality management systems — Requirements |
SAE AS50881F | WIRING AEROSPACE VEHICLE |
ISO/IEC Guide 2:2004 | Standardization and related activities — General vocabulary |
DEFCON 602B : 2006 | QUALITY ASSURANCE (WITHOUT DELIVERABLE QUALITY PLAN) |
DEFSTAN 59-411(PT1)/1(2007) : 2007 | ELECTROMAGNETIC COMPATIBILITY - PART 1: MANAGEMENT AND PLANNING |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.