EN 61850-7-3:2011
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
08-04-2020
25-02-2011
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Conditions for attribute inclusion
6 Constructed attribute class
7 Common data class specifications
8 Data attribute semantic
Annex A (normative) - Value range for units and multiplier
Annex B (informative) - Functional constraints
Annex C (normative) - Tracking of configuration revisions
Annex D (normative) - SCL enumerations
Annex ZA (normative) - Normative references to international
publications with their corresponding European
publications
Bibliography
IEC 61850-7-3:2010 is applicable to the description of device models and functions of substations and feeder equipment. It specifies constructed attribute classes and common data classes related to substation applications. In particular, it specifies common data classes for status information, common data classes for measured information, common data classes for control, common data classes for status settings, common data classes for analogue settings and attribute types used in these common data classes. This second edition defines new common data classes used for new standards defining object models for other domains based on IEC 61850 and for the representation of statistical and historical data.
Committee |
CLC/TC 57
|
DocumentType |
Standard
|
PublisherName |
European Committee for Standards - Electrical
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
OVE/ONORM EN 61850-7-3 : 2011 | Identical |
IEC 61850-7-3:2010 | Identical |
NBN EN 61850 7-3 : 2011 | Identical |
NEN EN IEC 61850-7-3 : 2011 | Identical |
I.S. EN 61850-7-3:2011 | Identical |
PN EN 61850-7-3 : 2011 | Identical |
SN EN 61850-7-3 : 2003 | Identical |
BS EN 61850-7-3:2011 | Identical |
CEI EN 61850-7-3 : 2012 | Identical |
NF EN 61850-7-3 : 2012 | Identical |
DIN EN 61850-7-3:2011-08 | Identical |
UNE-EN 61850-7-3:2011 | Identical |
I.S. EN 61850-7-3:2011/A1:2020 | Identical |
PNE-FprEN 61850-7-3 | Identical |
CEI EN 61850-7-420 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES |
CEI EN 61400-25-6 : 2011 | WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING |
I.S. EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
BS EN 61970-301:2017 | Energy management system application program interface (EMS-API) Common information model (CIM) base |
EN 61400-25-5:2017 | Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
CEI EN 61850-9-2 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 |
BS EN 61850-8-1:2011 | Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
BS EN 61850-6:2010 | Communication networks and systems for power utility automation Configuration description language for communication in electrical substations related to IEDs |
CEI EN 61850-7-2 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
I.S. EN 62271-3:2015 | HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
CEI EN 61850-8-1 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
I.S. EN 61850-9-2:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 (IEC 61850-9-2:2011 (EQV)) |
CEI CLC/TS 61850-80-1 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED DATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104 |
EN 61400-25-4:2017 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
EN 61850-10:2013 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
EN 62271-3:2015 | High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
EN 61400-25-6:2017 | Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
EN 61850-7-420:2009 | Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
EN 61850-6:2010 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
BS EN 61850-7-4:2010 | Communication networks and systems for power utility automation Basic communication structure. Compatible logical node classes and data object classes |
CEI EN 61400-25-1 : 2007 | WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
DD CLC/TS 61850-80-1:2010 | Communication networks and systems for power utility automation Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
BS EN 61400-25-2:2015 | Wind turbines Communications for monitoring and control of wind power plants - Information models |
BS EN 61850-9-2:2011 | Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Sampled values over ISO/IEC 8802-3 |
BS EN 62271-3:2015 | High-voltage switchgear and controlgear Digital interfaces based on IEC 61850 |
CLC/TS 61850-80-1:2010 | Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
CEI EN 61400-25-4 : 2009 | WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
I.S. EN 62361-2:2013 | POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END TO END QUALITY CODES FOR SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) |
BS EN 61850-7-1:2011 | Communication networks and systems for power utility automation Basic communication structure. Principles and models |
CEI EN 61850-9-1 : 2015 | COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 9-1: SPECIFIC COMMUNICATION SYSTEM MAPPINGS (SCSM) - SAMPLED VALUES OVER SERIAL UNIDIRECTIONAL MULTIDROP POINT TO POINT LINK |
BS EN 61400-25-5:2017 | Wind energy generation systems Communications for monitoring and control of wind power plants. Compliance testing |
I.S. EN 61850-6:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
I.S. EN 61850-7-4:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
CEI EN 61850-7-4 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
EN 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
EN 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
EN 61850-7-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011) |
BS EN 62361-2:2013 | Power systems management and associated information exchange. Interoperability in the long term End to end quality codes for supervisory control and data acquisition (SCADA) |
OVE/ONORM EN 61400-25-1 : 2007 | WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
EN 62689-1:2016 | Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 1: General principles and requirements |
CEI EN 61850-7-1 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS |
I.S. EN 61400-25-2:2015 | WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
BS EN 62689-1:2016 | Current and voltage sensors or detectors, to be used for fault passage indication purposes General principles and requirements |
BS EN 61400-25-6:2017 | Wind energy generation systems Communications for monitoring and control of wind power plants. Logical node classes and data classes for condition monitoring |
BS EN 61850-7-2:2010 | Communication networks and systems for power utility automation Basic information and communication structure. Abstract communication service interface (ACSI) |
BS EN 61850-10:2013 | Communication networks and systems for power utility automation Conformance testing |
S.R. CLC/TS 61850-80-1:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED ATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104 |
CEI EN 62361-2 : 2014 | POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END-TO-END QUALITY CODES FOR SCADA |
BS EN 61850-7-410 : 2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
I.S. EN 62689-1:2016 | CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS |
I.S. EN 61400-25-5:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - COMPLIANCE TESTING |
I.S. EN 61850-8-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
I.S. EN 61850-7-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011 (EQV)) |
I.S. EN 61850-9-2:2011/A1:2020 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 (IEC 61850-9-2:2011/A1:2020)<br> |
EN 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
I.S. EN 61400-25-4:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
BS EN 61850-7-420:2009 | Communication networks and systems for power utility automation Basic communication structure. Distributed energy resources logical nodes |
I.S. EN 61850-7-410:2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
CEI EN 61850-6 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
I.S. EN 61850-7-420:2009 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES |
I.S. EN 61850-9-1:2003 | COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS - PART 9-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER SERIAL UNIDIRECTIONAL MULTIDROP POINT TO POINT LINK |
I.S. EN 61850-10:2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV)) |
EN 61850-7-410:2013/A1:2016 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL (IEC 61850-7-410:2012/A1:2015) |
EN 61970-301:2017 | Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base |
EN 62361-2 : 2013 | POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE - INTEROPERABILITY IN THE LONG TERM - PART 2: END TO END QUALITY CODES FOR SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) (IEC 62361-2:2013) |
EN 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEEE C37.118-2005 | IEEE Standard for Synchrophasors for Power Systems |
EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
EN 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 61850-7-1:2011 | Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
EN 61850-7-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011) |
ISO 4217:2015 | Codes for the representation of currencies |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.