Corrigendum No. 1, 1978, Corrigendum No. 2, 1988 (incorporated). Covers the constructional requirements for the erection of insulated l.v. aerial bundled conductors to ESI 43-13, as distribution and service lines erected on poles and attached to buildings and employing the following Insulated Aerial Bundled Conductors (ABC): 25 sq.mm 2 and 4 conductor bundles. 35 sq.mm 2 and 4 conductor bundles. 50 sq.mm 4 conductor bundles. 70 sq.mm 4 conductor bundles. 95 sq.mm 4 conductor bundles. 50 sq.mm, 70 sq.mm and 95 sq.mm 4 conductor bundles with 1 or 2.25 sq.mm control conductors. Other conductor bundles may be used in conjunction with this Standard, subject to users supplying their own erection data and verifying that the strength of components are adequate.